Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Unloading Of Spent Catalyst In 4 Nos Of Tubes And Loading Of New Catalyst In 15 Nos Of Tubes In Primary Reformer By Spiral Spring Unidense Method
|
Description |
Unloading Of Spent Catalyst In 4 Nos Of Tubes And Loading Of New Catalyst In 15 Nos Of Tubes In Primary Reformer By Spiral Spring Unidense Method
|
Organisation | Madras Fertilizers Limited | Central Govt. Ministry/Department |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 94000 |
Tender Value | |
Place | MFL MANALI CHENNAI |
Link |
AAAAAAAAAA Login to view |
Start Date | June 19, 2025 21:50 |
End Date |
09/07/2025 ( 19 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Tender for chartering of green tug (green tug transition programme compliant) manning, operation, maintenance and complete technical management of 02 nos. 60 ton bollard pull capacity new battery electric tug for a period of 15 years at jnpa
Tender for chartering of green tug (green tug transition programme compliant) manning, operation, maintenance and complete technical management of 02 nos. 60 ton bollard pull capacity new battery electric tug for a period of 15 years at jnpa
Read moreHiring the services of a brand new bolero camper di,4wd with double cabin base model or an equivalent model vehicle with standard fittings including 1 no. driver and 2 nos. helpers for providing pigging assistance services e.g. cleaning, handling and transportation of crude oil or wax or sludge or pig in duliajan digboi cod line for a periof of 4 years.
Hiring the services of a brand new bolero camper di,4wd with double cabin base model or an equivalent model vehicle with standard fittings including 1 no. driver and 2 nos. helpers for providing pigging assistance services e.g. cleaning, handling and transportation of crude oil or wax or sludge or pig in duliajan digboi cod line for a periof of 4 years.
Read moreConstruction of 20 (twenty) nos. new ventilation stopping and 02 nos. ventilation double door between intake and airways p-9c and p-7a proposed depillaring panel in lk-ii seam of jamuna 9/10 mine, bhadra sub area, jamuna kotma area.
Construction of 20 (twenty) nos. new ventilation stopping and 02 nos. ventilation double door between intake and airways p-9c and p-7a proposed depillaring panel in lk-ii seam of jamuna 9/10 mine, bhadra sub area, jamuna kotma area.
Read moreConstruction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31dat fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31 d at fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Read moreUnloading of spent catalyst in 4 nos of tubes and loading of new catalyst in 15 nos of tubes in primary reformer by spiral spring unidense method
Unloading of spent catalyst in 4 nos of tubes and loading of new catalyst in 15 nos of tubes in primary reformer by spiral spring unidense method
Read moreFabrication and replacement of primary and secondary superheater tubes with new of service boiler of cpp
Fabrication and replacement of primary and secondary superheater tubes with new of service boiler of cpp
Read moreLabour charges for dismantling, loading and transporting of 10mva/16 mva/25mva(sh) 110 kv power transformers from various places and unloading, erection,hoc, earthing, painting, and commissioning at various places in tirunelveli region
Labour charges for dismantling, loading and transporting of 10mva/16 mva/25mva(sh) 110 kv power transformers from various places and unloading, erection,hoc, earthing, painting, and commissioning at various places in tirunelveli region
Read moreConstr of rail flyover b/w aligarh jction station and harduaganj station comprising earthwork in formation, p-way, minor bridges, ror, bndry wall, new manzoorgarhi stationyard devt in connection with constr of rfo-4 under ncr,ministry of railys,g.o.i
Constr of rail flyover b/w aligarh jction station and harduaganj station comprising earthwork in formation, p-way, minor bridges, ror, bndry wall, new manzoorgarhi stationyard devt in connection with constr of rfo-4 under ncr,ministry of railys,g.o.i
Read moreWorks contract for laying of 11kv 3x300 sq mm xlpe ug cable by trenchless and open cut method for strengthening, replacement and interlinking of 11kv cables in various schemes of annasalai division in respect of cedc central
Works contract for laying of 11kv 3x300 sq mm xlpe ug cable by trenchless and open cut method for strengthening, replacement and interlinking of 11kv cables in various schemes of annasalai division in respect of cedc central
Read moreOverhaul works unit i replacing of hbg metal in gt and st plinth areas by new 40mm metal at unit i
Overhaul works unit i replacing of hbg metal in gt and st plinth areas by new 40mm metal at unit i
Read moreof your Industry type