Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Link Road Along Ibb Between Bp No 2270 To 2300 At Govindbari And Wanshapara For Length Of 11.945 Km In The State Of Tripura Package No Tr Lr G And W 2nd Call
|
| Description |
Construction Of Link Road Along Ibb Between Bp No 2270 To 2300 At Govindbari And Wanshapara For Length Of 11.945 Km In The State Of Tripura Package No Tr Lr G And W 2nd Call
|
| Organisation | National Projects Construction Corporation Limited | Corporate Office - NPCC | Projects Division - CO - NPCC |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | 59000 |
| EMD | 37.86 Lakh |
| Tender Value | 27.85 Crore |
| Place | |
| Link | Login to view |
| Start Date | September 29, 2026 23:30 |
| End Date |
Open
22/10/2026
6 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of road from 1. l505-raishyabari mandirghat ibb road to sarat kumar para, block- raisyabari (length-2.235 km) package no- tr-04-44 p5. 2. l510-gandacherra-raishyabari road to madhanjoy para, block- raisyabari (length-3.38 km) package no-
Pmgsy roads
Read moreRepair and maintenance of border security fence between bp no 2300 mp and bp no 2293 m in aor of bop khantalang 179 bn bsf under shq bsf panisagar sh replacement of barbed wire concertina coils
Repair and maintenance of border security fence between bp no 2300 mp and bp no 2293 m in aor of bop khantalang 179 bn bsf under shq bsf panisagar sh replacement of barbed wire concertina coils
Read moreExtra protection and repair of ibb fence phase-ii between bp no 876 2 s to 898 7 s in aor of 157 bn bsf under shq bsf gopalpur
Extra protection and repair of ibb fence phase-ii between bp no 876 2 s to 898 7 s in aor of 157 bn bsf under shq bsf gopalpur
Read morePeriodical renewal of pmgsy handed over road from a.a. road (jirania) to mandai (link no t 01) (length 5.992 km) (pakage no tr 01 208) under pwd(r and b) mandwi sub division, mandwi block during the year 2023 24
Periodical renewal of pmgsy handed over road from a.a. road (jirania) to mandai (link no t 01) (length 5.992 km) (pakage no tr 01 208) under pwd(r and b) mandwi sub division, mandwi block during the year 2023 24
Read moreMtc of pmgsy road from khedacherra to duganga in different chainages total length 7 004 km under damcherra sub division, pwd r b during the year 2022 2023 sh patch metalling, carpeting, seal coating etc. link pakage no tr 03 13st2.
Mtc of pmgsy road from khedacherra to duganga in different chainages total length 7 004 km under damcherra sub division, pwd r b during the year 2022 2023 sh patch metalling, carpeting, seal coating etc. link pakage no tr 03 13st2.
Read moreRepair maintenance of damaged ibb fence and rcc culvert between bp no 1201 1s to 1202 2s in aor of bop rajai of 193 bn bsf under shq bsf shillong
Repair maintenance of damaged ibb fence and rcc culvert between bp no 1201 1s to 1202 2s in aor of bop rajai of 193 bn bsf under shq bsf shillong
Read morePeriodical repair of road from bamutia to fatikcherra (pmgsy road) (l056), package no. tr-01-15 (length-6.775 km) under tripura nirman suvarna jayanti yojana during the year 2023-24/ s.h- bm, tack coat, carpeting, seal coat, road side pucca drain, si
Periodical repair of road from bamutia to fatikcherra (pmgsy road) (l056), package no. tr-01-15 (length-6.775 km) under tripura nirman suvarna jayanti yojana during the year 2023-24/ s.h- bm, tack coat, carpeting, seal coat, road side pucca drain, si
Read moreRepair of fencing in between bp no. 2297/m to 2298/m (fence 250 mtr retaining wall 150 mtr) in aor of bop new sewarampara in tripura state along indo-bangladesh border (ibb).
Repair of fencing in between bp no. 2297/m to 2298/m (fence 250 mtr retaining wall 150 mtr) in aor of bop new sewarampara in tripura state along indo-bangladesh border (ibb).
Read moreConstruction of balance bfl work along ibb from bp no. 2063/1-s to 2063/10-s of length 0.90 km in the aor of bop kalsimura in the state of tripura
Construction of balance bfl work along ibb from bp no. 2063/1-s to 2063/10-s of length 0.90 km in the aor of bop kalsimura in the state of tripura
Read moreConstruction of balance bfl work along ibb from bp no. 2063/1-s to 2063/10-s of length 0.90 km in the aor of bop kalsimura in the state of tripura-2nd call
Construction
 of balance bfl
 work along ibb
 from bp no.
 2063/1-s to 2063/10-
 s of length 0.90
 km in the aor of
 bop kalsimura
 in the state of
 tripura -2nd call
Read moreof your Industry type