Tender Details

Particulars Details
Title
Construction Work Of Rcc Drain And Interlocking From Nh To Sushil Mishra House Via Dr S.B. Singh And Durga Prasad House In Ward 08 Chandauli
Description
Construction Work Of Rcc Drain And Interlocking From Nh To Sushil Mishra House Via Dr S.B. Singh And Durga Prasad House In Ward 08 Chandauli
Organisation Directorate of Local Bos UP | State Govt. and UT
Tender Id 2025_DOLBU_1035780_1
Reference
Number
175/2/NPR/Etender/2024-25
Tender Fee 2800
EMD 51000
Tender Value
Place NAGAR PANCHAYAT RAMSANEHI GHAT BARABANKI
Link https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1876305
Start Date May 03, 2025 22:30
End Date

13/05/2025 ( Expired 28 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.

Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.

Read more
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.

Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.

Read more
Consultancy services for preparation of dpr for widening to 4lane from km 35.00 to km 66.275 from nalagarh to swarghat of nh 105 and spur in the state of hp.

Consultancy services for preparation of dpr for widening to 4lane from km 35.00 to km 66.275 from nalagarh to swarghat of nh 105 and spur in the state of hp.

Read more
Consultancy services for authoritys engineer for supervision of construction of road from lada sarli section of frontier highway nh 913 koloriang to sarli km 168.0 to 183.40 15.40 km and sarli to huri km 0.00 to 78.38 78.38km

Consultancy services for authoritys engineer for supervision of construction of road from lada sarli section of frontier highway nh 913 koloriang to sarli km 168.0 to 183.40 15.40 km and sarli to huri km 0.00 to 78.38 78.38km

Read more
Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand

Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand

Read more
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)

Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)

Read more
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.

Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.

Read more
Construction of mipi-andrathang road from km 20.000 to 50.000

Construction of mipi-andrathang road from km 20.000 to 50.000&#x0d (design length 34.880 km between km 20.000 to 54.880)green field&#x0d alignment to nhsl specifications in the aor of 62 rcc under 752 brtf&#x0d of project udayak in arunachal pradesh state

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise