Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
In 2025 26 Cr Gate Operation At Ch 12950 And 22608 For Irrigation Non Irrigation Work And Other Related Works On Hrbc Repairing Embankment Of Canal In Km 23 Of Hrbc
|
| Description |
In 2025 26 Cr Gate Operation At Ch 12950 And 22608 For Irrigation Non Irrigation Work And Other Related Works On Hrbc Repairing Embankment Of Canal In Km 23 Of Hrbc
|
| Organisation | CE Tapi Irrigation Development Corporation Jalgaon | State Govt. and UT |
| Tender Id | 2025_TIDC_1199304_1 |
|
Reference Number |
E Tender Notice No 03/07 |
| Tender Fee | 2860 |
| EMD | 18000 |
| Tender Value | - |
| Place | Padalse Yawal |
| Link |
View Original Tender Notice
https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2076956 |
| Start Date | July 14, 2025 15:40 |
| End Date |
Expired
21/07/2025
Expired 422 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Providing labour on cr at ch 12950 and cr at ch 22608 for gate operation from june 24 to march 25 and providing labour for right bank of tapi river and canal for irrigation and non irrigation management work under irrigation section
Providing labour on cr at ch 12950 and cr at ch 22608 for gate operation from june 24 to march 25 and providing labour for right bank of tapi river and canal for irrigation and non irrigation management work under irrigation section
Read moreRepairing embankment of sr side on ch 14950 to 15010 in km 14 of hrbc
Repairing embankment of sr side on ch 14950 to 15010 in km 14 of hrbc
Read moreRepairing embankment of sr side on ch 15010 to 15040 and lining on ch 14950 to 15100 in km 14 of hrbc
Repairing embankment of sr side on ch 15010 to 15040 and lining on ch 14950 to 15100 in km 14 of hrbc
Read moreRepairing embankment of canal in km 37 of hrbc m and r to aqueduct at ch 30795 and 35210 removing the silt and bushy shruby jungal at up stream and down stream span for clearing the water way of hrbc
Repairing embankment of canal in km 37 of hrbc. m and r to aqueduct at ch 30795 and 35210 removing the silt and bushy shruby jungal at up stream and down stream span for clearing the water way of hrbc
Read moreGeneral maintenance (oiling and greasing) of cwc canal cr gate and keoti canal hr gate at rd 28.15 km of cwc canal and keoti canal hr gate, cr gate and escape gate situated at rd 0.00 km to 45.00 km of keoti canal.
General maintenance (oiling and greasing) of cwc canal cr gate and keoti canal hr gate at rd 28.15 km of cwc canal and keoti canal hr gate, cr gate and escape gate situated at rd 0.00 km to 45.00 km of keoti canal.
Read moreGeneral bsp venniyode branch canal construction of branch canal ch 3975m to ch 4325m convertion of open canal to land barrel from ch 4300m to ch 4325m general civil work
General bsp venniyode branch canal construction of branch canal ch 3975m to&#x0d ch 4325m convertion of open canal to land barrel from ch 4300m to ch 4325m general&#x0d civil work&#x0d
Read moreIrrigation precautionary measure for khatra main canal (lower) from ch. 0.00 to ch. 470.00, garhbeta branch canal from ch. 0.00 to ch. 51.00 and midnapore branch canal ch. 0.00 to ch. 446.00 in connection with kharif irrigation 2024 (1st, 2nd wateri
Irrigation precautionary measure for khatra main canal (lower) from ch. 0.00 to ch. 470.00, garhbeta branch canal from ch. 0.00 to ch. 51.00 and midnapore branch canal ch. 0.00 to ch. 446.00 in connection with kharif irrigation 2024 (1st, 2nd wateri
Read moreConstruction and repairing of left side embankment wing wall on ds of box culvert at ch 51195m of hrbc
Construction and repairing of left side embankment wing wall on ds of box culvert at ch 51195m of hrbc
Read moreIrrigation precautionary measure for khatra main canal (lower) from ch. 0 to ch. 470, garhbeta branch canal from ch. 0 to ch. 51 and midnapore branch canal ch. 0 to ch. 446 in connection with rabi irrigation 24 (1st, 2nd, 3rd watering)
Irrigation precautionary measure for khatra main canal (lower) from ch. 0 to ch. 470, garhbeta branch canal from ch. 0 to ch. 51 and midnapore branch canal ch. 0 to ch. 446 in connection with rabi irrigation 24 (1st, 2nd, 3rd watering) during24
Read moreProviding r.c.c. lining on right bank canal distributary no 2 km 10 to 12 ch.9000 to 12950 of surya major project
Providing r.c.c. lining on right bank canal distributary no 2 km 10 to 12 ch.9000 to 12950 of surya major project
Read moreof your Industry type