Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Repairing And Refabrication With Fitting Of Load Table ( Hopper ) And Changing 200 Mtr Pvc Belt (800 Mm Width ) At 2 El Jambad Bottom Seam (Rvii B1) Of Shyamsundarpur Colliery Under Bankola Area .
|
| Description |
Repairing And Refabrication With Fitting Of Load Table ( Hopper ) And Changing 200 Mtr Pvc Belt (800 Mm Width ) At 2 El Jambad Bottom Seam (Rvii B1) Of Shyamsundarpur Colliery Under Bankola Area .
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_ECL_293353_1 |
|
Reference Number |
ECL/GM/BA/E TENDER/23-24/EnM/132 Dt. 08.11.2023 |
| Tender Fee | - |
| EMD | 2500 |
| Tender Value | - |
| Place | ONLINE |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | November 09, 2023 17:30 |
| End Date |
Expired
24/11/2023
Expired 1036 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repairing and refabrication with fitting of load table ( hopper ) and changing 200 mtr pvc belt (800 mm width ) at 2el jambad bottom seam (rvii b1) of shyamsundarpur colliery under bankola area (retender).
Repairing and refabrication with fitting of load table ( hopper ) and changing 200 mtr pvc belt (800 mm width ) at 2el jambad bottom seam (rvii b1) of shyamsundarpur colliery under bankola area (retender).
Read moreCarrying and transporting with fitting 800 mm width 70 mtr conveyor structure and changing of 100 mtr belt from 2l 6 d to 2l 12 d at jambad bottom seam rvii b1 of sspur colliery under bankola area
Carrying and transporting with fitting 800 mm width 70 mtr conveyor structure and changing of 100 mtr belt from 2l 6 d to 2l 12 d at jambad bottom seam rvii b1 of sspur colliery under bankola area
Read moreConstruction of sy seven nos sectionalisation stopping of r viiib1(jambad bottom) and r viiit2(jambad top) seam at shyamsundarpur colliery
Construction of sy seven nos sectionalisation stopping of r viiib1(jambad bottom) and r viiit2(jambad top) seam at shyamsundarpur colliery
Read moreExtension of 800mm width 60 meters long belt conveyor 2d 3l to 2d 1l of jambad bottom seam rvii b10 at sspur colliery under bankola area
Extension of 800mm width 60 meters long belt conveyor 2d 3l to 2d 1l of jambad bottom seam rvii b10 at sspur colliery under bankola area
Read moreDrilling of 500 mm dia bore hole from surface to rvii seam for lowering of submersible pump for dewatering of rvii seam of south bankola portion at shyamsundarpur colliery
Drilling of 500 mm dia bore hole from surface to rvii seam for lowering of submersible pump for dewatering of rvii seam of south bankola portion at shyamsundarpur colliery
Read moreConstruction of 03(three) nos. retaining wall near 32l sump of rvii seam at shyamsundarpur colliery under bankola area
Construction of 03(three) nos. retaining wall near 32l sump of rvii seam at shyamsundarpur colliery under bankola area
Read moreConstruction of sy seven nos sectionalisation stopping of r viiib1(jambad bottom) and r viiit2(jambad top) seam at shyamsundarpur colliery (retender).
Construction of sy seven nos sectionalisation stopping of r viiib1(jambad bottom) and r viiit2(jambad top) seam at shyamsundarpur colliery (retender).
Read moreDrilling 350mm dia in seam borehole from rvii to rviia seam at shyamsundarpur colliery
Drilling 350mm dia in seam borehole from rvii to rviia seam at shyamsundarpur colliery
Read moreDrilling 350mm dia in seam borehole from rvii to rviia seam at shyamsundarpur colliery
Drilling 350mm dia in seam borehole from rvii to rviia seam at shyamsundarpur colliery
Read moreRepairing of old ventilation stopping of rvii seam at shyamsundarpur colliery
Repairing of old ventilation stopping of rvii seam at shyamsundarpur colliery
Read moreof your Industry type