Tender Details

Particulars Details
Title
Construction Of 16 Nos. Recharge Shaft In Tank/ Ponds Of Bahanaga And Remuna Block Of Balasore District Under Arua Scheme For The Fy 2025 26
Description
Construction Of 16 Nos. Recharge Shaft In Tank/ Ponds Of Bahanaga And Remuna Block Of Balasore District Under Arua Scheme For The Fy 2025 26
Organisation Ground Water Survey and Investigation | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 6000
EMD 26600
Tender Value
Place BAHANAGA AND REMUNA
Link

AAAAAAAAAA

Login to view
Start Date May 16, 2025 16:30
End Date

26/05/2025 ( 9 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
E-tender for procurement and installation of 3 nos of medium liquid nitrogen plant along with 100 kva voltage stabilizer for west tripura, gomati and unakoti districts to strengthen ai network in tripura state during the year 2025-2026

E-tender for procurement and installation of 3 nos of medium liquid nitrogen plant along with 100 kva voltage stabilizer for west tripura, gomati and unakoti districts to strengthen ai network in tripura state during the year 2025-2026

Read more
Tsgp-31/ rdss/2025-26

Development of distribution infrastructure of 11 kv feeders (urban and industrial) emanating from 66 kv sub-stations sector 1,2,3,4,8 in imt manesar of gurugram-1 circle, dhbvn under rds scheme.

Read more
Rate contract for procurement of liquid nitrogen for two year (fy 2025-26 and 2026-2027)

Rate contract for procurement of liquid nitrogen for two year (fy 2025-26 and 2026-2027)

Read more

Supply and installation of submersible pump motor sets at expected flood affected river bed sites tubewells with supply of necessary substitutes at different water supply scheme under kashipur block under pmd, phe dte. in the district of purulia.

Read more

Balance pipeline laying, road repair with allied works under proposed ground water based asuti i asuti ii and chatta gp pwss to accommodate fhtc in thakurpukur-maheshtala block under swd - i, p.h.e. dte district south 24 parganas.

Read more
Ward no 03 construction work of proposed hall shop block a and b on the first floor of the shopping complex built under idsmt scheme near shiv mandir

Ward no 03 construction work of proposed hall shop block a and b on the first floor of the shopping complex built under idsmt scheme near shiv mandir

Read more

Extension of functional tap connection to the left out awcs and schools in polba block under chinsurah sub-division of hooghly division phe dte.

Read more
Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham

Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham

Read more
Distribution infra works under rdss for electrification of left out households (hhs) and public institutions in da-jgua scheme in jaipur discom against tn -593

Distribution infra works under rdss for electrification of left out households (hhs) and public institutions in da-jgua scheme in jaipur discom against tn -593

Read more
Wbhousing/sercfae-nit03_7th call _2023-2024

Construction of 3024 nos. of flats along with other amenities at bijoynagar and daskeary, (j.l.no.-02) mouza in raniganj area, asansol, dist-paschim bardhaman under r.c.f.a. project-for unfinished works of bijoynagar-c block.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise