Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Damaged Boundary Wall Along Left And Right Bank Of Trunk Drain No.1 Between Rd 10330m (Arterial Highway Bridge) To Rd 13387m (Delhi U.P Border).
|
Description |
Construction Of Damaged Boundary Wall Along Left And Right Bank Of Trunk Drain No.1 Between Rd 10330m (Arterial Highway Bridge) To Rd 13387m (Delhi U.P Border).
|
Organisation | Irrigation and Flood Control | State Govt. and UT |
Tender Id | 2024_IFC_261032_1 |
Reference Number |
37/EE/CD-IV/IFC/2024-25 |
Tender Fee | 0 |
EMD | 9.33 Lakh |
Tender Value | |
Place | East |
Link | https://govtprocurement.delhi.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=357089 |
Start Date | May 08, 2025 22:45 |
End Date |
19/05/2025 ( Expired 22 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)
Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)
Read moreZone no. 01, ward no. 04, at khaira purani basti (1) construction of rcc drain and toplayer cement concrete road form satish rawat ji house to rajkumar yadav ji house, (2) construction of rcc drain and wbm road from sanchi road to rajendra saket ji..
Zone no. 01, ward no. 04, at khaira purani basti (1) construction of rcc drain and toplayer cement concrete road form satish rawat ji house to rajkumar yadav ji house, (2) construction of rcc drain and wbm road from sanchi road to rajendra saket ji..
Read moreNew construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
Read moreRepair to boundary compound wall fencing path and drain at od shakurbasti under aor of age br ii of ge north delhi cantt 10
Repair to boundary compound wall fencing path and drain at od shakurbasti under aor of age br ii of ge north delhi cantt 10
Read moreRepair to path drain culvert compound wall gate jafri wall sewage line, repair replacement of septic tank etc of unrestricted and restricted area of cqa w cqa ofv sqae a sqae l and nai dgqa units under ge p no 1 jabalpur
Repair to path drain culvert compound wall gate jafri wall sewage line, repair replacement of septic tank etc of unrestricted and restricted area of cqa w cqa ofv sqae a sqae l and nai dgqa units under ge p no 1 jabalpur
Read moreConstruction of h.l. steel bridge single span 42m c/c of bearing over narwana branch canal at rd 11862 x-ing chanarthal kalan to gt road sadhugarh via attapur including its approaches, dismantling and 1.5m span slab culvert under pmgsy-iii (batch-1)
Construction of h.l. steel bridge single span 42m c/c of bearing over narwana branch canal at rd 11862 x-ing chanarthal kalan to gt road sadhugarh via attapur including its approaches, dismantling and 1.5m span slab culvert under pmgsy-iii (batch-1)
Read moreConstruction of u shape rcc drain, boundary wall of parks and missing drain on road no 2 along with interlocking tiles at i.a. baghat distt. baghpat
Construction of u shape rcc drain, boundary wall of parks and missing drain on road no 2 along with interlocking tiles at i.a. baghat distt. baghpat
Read moreConstruction of donli to punialla link road from km 1st rd 0 to km 9th rd 500 by way of earthwork 1000 mm dia hp culvert 5 00 mtr height semi pucca r wall 1 50 mtr height pucca edge wall 2 5 mtr height semi pucca b wall and create wall
Construction of donli to punialla link road from km 1st rd 0 to km 9th rd 500 by way of earthwork 1000 mm dia hp culvert 5 00 mtr height semi pucca r wall 1 50 mtr height pucca edge wall 2 5 mtr height semi pucca b wall and create wall
Read moreAnnual rate contract for construction and repairing work of drain in ward no 1 to 15
Annual rate contract for construction and repairing work of drain in ward no 1 to 15
Read moreConstruction of high drain from motiganj culvert to kuraksha bridge beside samsi ratua state highway in samsi, mouza-motiganj, j.l-no-60 at samsi g.p. under ratua-i dev. block in the dist. malda. sl. no-33
Construction of high drain from motiganj culvert to kuraksha bridge beside samsi ratua state highway in samsi, mouza-motiganj, j.l-no-60 at samsi g.p. under ratua-i dev. block in the dist. malda. sl. no-33
Read moreof your Industry type