Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Damaged Boundary Wall Along Left And Right Bank Of Trunk Drain No.1 Between Rd 10330m (Arterial Highway Bridge) To Rd 13387m (Delhi U.P Border).
|
Description |
Construction Of Damaged Boundary Wall Along Left And Right Bank Of Trunk Drain No.1 Between Rd 10330m (Arterial Highway Bridge) To Rd 13387m (Delhi U.P Border).
|
Organisation | Irrigation and Flood Control | State Govt. and UT |
Tender Id | 2024_IFC_261032_1 |
Reference Number |
37/EE/CD-IV/IFC/2024-25 |
Tender Fee | 0 |
EMD | 9.33 Lakh |
Tender Value | |
Place | East |
Link | https://govtprocurement.delhi.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=357089 |
Start Date | May 08, 2025 22:45 |
End Date |
19/05/2025 ( Expired 24 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)
Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)
Read moreZone no. 01, ward no. 04, construction of boundary wall of park and development of park in front of union bank at vindhya vihar colony.
Zone no. 01, ward no. 04, construction of boundary wall of park and development of park in front of union bank at vindhya vihar colony.
Read moreZone no. 01, ward no. 04, at khaira purani basti (1) construction of rcc drain and toplayer cement concrete road form satish rawat ji house to rajkumar yadav ji house, (2) construction of rcc drain and wbm road from sanchi road to rajendra saket ji..
Zone no. 01, ward no. 04, at khaira purani basti (1) construction of rcc drain and toplayer cement concrete road form satish rawat ji house to rajkumar yadav ji house, (2) construction of rcc drain and wbm road from sanchi road to rajendra saket ji..
Read moreNew construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
Read moreRepair to boundary compound wall fencing path and drain at od shakurbasti under aor of age br ii of ge north delhi cantt 10
Repair to boundary compound wall fencing path and drain at od shakurbasti under aor of age br ii of ge north delhi cantt 10
Read moreConstruction of stone masonry wall along the existing footpath from forebay to sidrapong power house, repairing of the footpath and cross drain along with other necessary rectification works at sidrapong hydro electric project
Construction of stone masonry wall along the existing footpath from forebay to sidrapong power house, repairing of the footpath and cross drain along with other necessary rectification works at sidrapong hydro electric project
Read moreConstruction work of rcc drain in ward no 1 and 3 from in front of chhibramau bus temple to late jagroops shop
Construction work of rcc drain in ward no 1 and 3 from in front of chhibramau bus temple to late jagroops shop
Read moreRepair to path drain culvert compound wall gate jafri wall sewage line, repair replacement of septic tank etc of unrestricted and restricted area of cqa w cqa ofv sqae a sqae l and nai dgqa units under ge p no 1 jabalpur
Repair to path drain culvert compound wall gate jafri wall sewage line, repair replacement of septic tank etc of unrestricted and restricted area of cqa w cqa ofv sqae a sqae l and nai dgqa units under ge p no 1 jabalpur
Read moreConstruction of h.l. steel bridge single span 42m c/c of bearing over narwana branch canal at rd 11862 x-ing chanarthal kalan to gt road sadhugarh via attapur including its approaches, dismantling and 1.5m span slab culvert under pmgsy-iii (batch-1)
Construction of h.l. steel bridge single span 42m c/c of bearing over narwana branch canal at rd 11862 x-ing chanarthal kalan to gt road sadhugarh via attapur including its approaches, dismantling and 1.5m span slab culvert under pmgsy-iii (batch-1)
Read moreGeneral fund -construction of cc drain from opp d.no.80/112-f-10-b to opp.d.no.80-112-f-10-k (abbas elsr along the compound wall) at abbas nagar in ward no.27.
Construction of cc drain from opp d.no.80/112-f-10-b to opp.d.no.80-112-f-10-k (abbas elsr along the compound wall) at abbas nagar in ward no.27.
Read moreof your Industry type