Tender Details

Particulars Details
Title
Dismantling Of Electrical Infrastructure At Genex. Valley Rsu T.E, Shifting And Transportation To Behala T.E, Itc Of 02 Nos. Sac At Joka Main T.E Csc Room, Alipore Area, Ctd, Kolkata..
Description
Dismantling Of Electrical Infrastructure At Genex. Valley Rsu T.E, Shifting And Transportation To Behala T.E, Itc Of 02 Nos. Sac At Joka Main T.E Csc Room, Alipore Area, Ctd, Kolkata
Organisation BSNL Calcutta Telephones | Public Sector Undertakings
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 177
EMD 1241
Tender Value
Place Kolkata
Link

AAAAAAAAAA

Login to view
Start Date July 06, 2025 22:30
End Date

12/07/2025 ( 6 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of foundation platform of 02 nos. distribution transformer and primary controlling of vcb switches and shifting of transformers and vcb on platform at main sub-station of gvp phase-ii ocp, kathara area

Construction of foundation platform of 02 nos. distribution transformer and primary controlling of vcb switches and shifting of transformers and vcb on platform at main sub-station of gvp phase-ii ocp, kathara area

Read more
- dismantling of electrical infrastructure at genex. valley rsu t.e, shifting and transportation to behala t.e, itc of 02 nos. sac at joka main t.e csc room, alipore area, ctd, kolkata..

- dismantling of electrical infrastructure at genex. valley rsu t.e, shifting and transportation to behala t.e, itc of 02 nos. sac at joka main t.e csc room, alipore area, ctd, kolkata

Read more
- dismantling of e.i and fans , sac units, fire detection system and dea sets at t.e. bldg roybahadur road. i/c shifting of all dismantling materials to te bldg behala, under oa (south), ctd.

- dismantling of e.i and fans , sac units, fire detection system and dea sets at t.e. bldg roybahadur road. i/c shifting of all dismantling materials to te bldg behala, under oa (south), ctd..

Read more
Dismantling of total electrical installation cables, panels, fire system in ground floor store room, offices, toilet, canteen ic shifting of all dismantling materials for proposed rent out space for gnb motor at cossipore te ctd.

Dismantling of total electrical installation cables, panels, fire system in ground floor store room, offices, toilet, canteen ic shifting of all dismantling materials for proposed rent out space for gnb motor at cossipore te ctd..

Read more
Dismantling, erection and di of 3.3 kv overhead lines of 02 nos of pump feeders(vcb-4 and ngef-3) from north side of mine to west side of lajkura ocp,ib valley area

Dismantling, erection and di of 3.3 kv overhead lines of 02 nos of pump feeders(vcb-4 and ngef-3) from north side of mine to west side of lajkura ocp,ib valley area

Read more
- replacement of faulty 2 x 7 tr scroll compressor, other spare parts i/c allied works for hpac plant at 2nd floor cdr edc san network, tape library, network room, saltlake main te bldg., saltlake kolkata (sh-repairing and servicing of hpac plant and other spare parts at 2nd floor san network, tape library, network room, cdr edc, itpc, saltlake main t.e. bldg., saltlake, ctd.

- replacement of faulty 2 x 7 tr scroll compressor, other spare parts i/c allied works for hpac plant at 2nd floor cdr edc san network, tape library, network room, saltlake main te bldg., saltlake kolkata (sh-repairing and servicing of hpac plant and other spare parts at 2nd floor san network, tape library, network room, cdr edc, itpc, saltlake main t.e. bldg., saltlake, ctd.

Read more
Rep.overhauling of 15 kva ea rep.of existing electrical wiring at te wishwanathpur , dismantling , refixing of partitioning wall/door of switch room to reduce cooling area at te khalilabad, dismantling shifting of 1x40 kva e/a from basti

Rep.overhauling of 15 kva ea rep.of existing electrical wiring at te wishwanathpur , dismantling , refixing of partitioning wall/door of switch room to reduce cooling area at te khalilabad, dismantling shifting of 1x40 kva e/a from basti

Read more
Annual contract for dismantling, shifting and re-commissioning etc and day to day running maintenance of 3 nos 500gpm pump-motor at phase ii colony and 4 nos 500 gpm pump-motor at kmp colony at akk ocp bnk area for a period of one years.

Annual contract for dismantling, shifting and re-commissioning etc and day to day running maintenance of 3 nos 500gpm pump-motor at phase ii colony and 4 nos 500 gpm pump-motor at kmp colony at akk ocp bnk area for a period of one years.

Read more
Part-a shifting of 02 nos.) pumps of capacity 198 hp- 02 nos. from one place to other place within the mine periphery, due to sudden requirement of pumping at different location in mines. part-b dismantling, laying, pipe cut

Part-a shifting of 02 pumps of capacity 198 hp- 02 nos. from one place to other place within the mine periphery, due to sudden requirement of pumping at different location in mines. &#x0d part-b dismantling, laying, pipe cut

Read more
T e and c of existing 6.6kv, 300 hp bha 700h pumpsets 600 hp submersible pump sets near puttamgandi including mom of pumping station for 4 months and dismantling and transportation of all equipment under td-iii, sahebnagar

Transportation, erection, testing and commissioning of existing 6.6kv, 300hp, bha 700h pump sets, 600hp submersible pump sets and all allied works and formation of bund across the approach main canal to maintain required level in canal for emergency pumping arrangements at foreshore of nagarjunasagar near puttamgandi including mom of pumping station for 4 months and dismantling and transportation of all equipment to kodandapur, nasarlapally and godakondla whenever sufficient inflows ed at nagarjunasagar reservoir under eam section, sd-iv(electrical), transmission div.iii, sahebnagar

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise