Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Mtps I Bm Lift Operation Of Boiler Lifts I To Iv And Attending Routine Maintenance Minor Repair Works Of Boiler Lift Ii And Its Accessories For One Year From The Date Of Commencement Of Works For 2024 25
|
| Description |
Mtps I Bm Lift Operation Of Boiler Lifts I To Iv And Attending Routine Maintenance Minor Repair Works Of Boiler Lift Ii And Its Accessories For One Year From The Date Of Commencement Of Works For 2024 25
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_431195_1 |
|
Reference Number |
CE/MTPS-I/SE/M-I/BM/ OT.514 / 2023-24 |
| Tender Fee | 0 |
| EMD | 16100 |
| Tender Value | - |
| Place | Mettur Thermal Power Station-I / Mettur Dam |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=512445 |
| Start Date | February 27, 2024 23:30 |
| End Date |
Expired
12/03/2024
Expired 946 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Mtps i bm unit ii boiler pressure parts aoh 2026 maintenance of boiler drum and all safety valves and allied works
Mtps i bm unit ii boiler pressure parts aoh 2026 maintenance of boiler drum and all safety valves and allied works
Read moreMtps i bm unit ii boiler pressure parts aoh 2026 removal and refixing of skin casing sheet and insulation for attending boiler 1st pass water wall tubes and 2nd pass steam cooled wall tube rectification works etc
Mtps i bm unit ii boiler pressure parts aoh 2026 removal and refixing of skin casing sheet and insulation for attending boiler 1st pass water wall tubes and 2nd pass steam cooled wall tube rectification works etc
Read moreRendering para medical assistance at mtps ii dispensary through outsourcing for a period of 365 days from the date of commencement
Rendering para medical assistance at mtps ii dispensary through outsourcing for a period of 365 days from the date of commencement
Read moreMtps i bm unit ii boiler pressure parts aoh 2026 servicing of various size actuators and allied works
Mtps i bm unit ii boiler pressure parts aoh 2026 servicing of various size actuators and allied works
Read moreRoutine / maint of lift room and shaft including water proofing of lifts pits under ge(west) colaba, mumbai
Routine / maint of lift room and shaft including water proofing of lifts pits under ge(west) colaba, mumbai
Read moreMtps i bm unit ii boiler pressure parts aoh 2026 rectification replacement of defective boiler tubes in 9th header and economizer coils at boiler iind pass area and radiography testing of welded joints
Mtps i bm unit ii boiler pressure parts aoh 2026 rectification replacement of defective boiler tubes in 9th header and economizer coils at boiler iind pass area and radiography testing of welded joints
Read moreTggenco ytps be1 collection and testing of oil samples pertaining to bm-i division from actual date of commencement of work to 31.03.2027
Tggenco ytps be1 collection and testing of oil samples pertaining to bm-i division from actual date of commencement of work to 31.03.2027
Read moreMtps i bm unit ii boiler pressure parts aoh 2026 rectification replacement of defective tubes in 7.9m s panel bend and side water wall tube in boiler 1st pass
Mtps i bm unit ii boiler pressure parts aoh 2026 rectification replacement of defective tubes in 7.9m s panel bend and side water wall tube in boiler 1st pass
Read moreMtps i bm unit ii boiler pressure parts aoh 2026 tube thickness survey water wall buffing providing platform renewal of shroudings and allied works
Mtps i bm unit ii boiler pressure parts aoh 2026 tube thickness survey water wall buffing providing platform renewal of shroudings and allied works
Read moreMtps i bm unit ii boiler pressure parts aoh 2026 strengthening of eco hopper supports with new pipes and arresting of ash leakage in pent house after removal of ash from boiler inside
Mtps i bm unit ii boiler pressure parts aoh 2026 strengthening of eco hopper supports with new pipes and arresting of ash leakage in pent house after removal of ash from boiler inside
Read moreof your Industry type