Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Lotapahar Loop Line For 3rd Line At Lotapahar And One Sick Siding Of 70 M Length
|
| Description |
Lotapahar Loop Line For 3rd Line At Lotapahar And One Sick Siding Of 70 M Length
|
| Organisation | Ministry of Railways |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link | Login to view |
| Start Date | September 21, 2026 20:14 |
| End Date |
Open
23/10/2026
8 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
S&t work for construction of loop line to 3rd line and one sick siding of 70 m length and proper pathway in station yards at sonua.
S&t work for construction of loop line to 3rd line and one sick siding of 70 m length and proper pathway in station yards at sonua.
Read moreVelcro tapes ( loop) of size width 25 mm and length 25 mtr.
Velcro tapes ( loop) of size width 25 mm and length 25 mtr.
Read moreConstruction of full-length stabling lines by extending existing short-length hot axle siding in barlanga station yards of ranchi division.
Construction of full-length stabling lines by extending existing short-length hot axle siding in barlanga station yards of ranchi division.
Read moreS&t work in connection with construction of long loop line to 3rd line at up side, bhalulata.
S&t work in connection with construction of long loop line to 3rd line at up side, bhalulata.
Read moreOhe work in connection with construction of a loop line for 3rd line at tabu in ckp division.
Ohe work in connection with construction of a loop line for 3rd line at tabu in ckp division.
Read moreModification of ohe due to goonda bihar (gdbr) - yard remodelling work for fitness of ballast siding & construction of additional loop line with other traffic facility works.
Modification of ohe due to goonda bihar (gdbr) - yard remodelling work for fitness of ballast siding & construction of additional loop line with other traffic facility works.
Read moreSignaling work in connection with provision of connectivity between loop line no.1 (cpu end) to engine siding at aghori khas station of pryj division, ncr.
Signaling work in connection with provision of connectivity between loop line no.1 (cpu end) to engine siding at aghori khas station of pryj division, ncr.
Read moreSnow clearance for the year 2026-27 (stage tender) (stage 3rd total length 9.30 kms)
Snow clearance for the year 2026-27 (stage tender) (stage 3rd total length 9.30 kms)
Read moreSnow clearance for the year 2026-27 (stage tender) ( stage 3rd total length 15.95 kms)
Snow clearance for the year 2026-27 (stage tender) ( stage 3rd total length 15.95 kms)
Read moreLdp heavy duty polythene bubble film 1.5 meter width, 70 gsm in length of 100 meters
Ldp heavy duty polythene bubble film 1.5 meter width, 70 gsm in length of 100 meters
Read moreof your Industry type