Tender Details

Particulars Details
Title
As Per (Annexture I)
Description
Infrastructural And Overall Development Of The Hospital Services Along With Improvement Of Patient Services Of The Habra State General Hospital&Amp#X0d Under 100 Habra Ac. &Amp#X0d
Organisation Zilla Parishad | State Govt. and UT
Tender Id 2025_ZPHD_902342_1
Reference
Number
WBNPG16/Habra-I PS/BEUP/25-26 Dt 12-09-2025
Tender Fee 4000
EMD 16000
Tender Value -
Place Habra I PS
Link
View Original Tender Notice

https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2041110

Start Date September 13, 2025 14:30
End Date
Expired 22/09/2025

Expired 369 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Restoration and comprehensive development of fox sagar (phase-i) by the o/o commissioner, hydraa

Restoration and comprehensive development of fox sagar (phase-i) by the o/o commissioner, hydraa

Read more
Restoration and comprehensive development of ameenpur lake (phase-i) by the o/o commissioner, hydraa

Restoration and comprehensive development of ameenpur lake (phase-i) by the o/o commissioner, hydraa

Read more
Restoration and comprehensive development of amber cheruvu (phase - i) by the o/o commissioner, hydraa

Restoration and comprehensive development of amber cheruvu (phase - i) by the o/o commissioner, hydraa

Read more
Restoration and comprehensive development of saroor nagar lake (phase-i) by the o/o commissioner, hydraa

Restoration and comprehensive development of saroor nagar lake (phase-i) by the o/o commissioner, hydraa

Read more
Erection of 4th 80mva ptr at 132kv ss erragadda substation in omc metro central circle/metro-zone-i

Erection of 4th 80mva ptr at 132kv ss erragadda substation in omc metro central circle/metro-zone-i

Read more
Revamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).

Revamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).

Read more
Hiring of 1 no. of hydraulically operated aerial tower wagon for repairs and maintenance works on electrical lighting poles and oht lines with 12 hours availabilty per day and 1000 kms run per month at section-iv of pkoc,manuguru area for a period of 4 years.-reg.

Hiring of 1 no. of hydraulically operated aerial tower wagon for repairs and maintenance works on electrical lighting poles and oht lines with 12 hours availabilty per day and 1000 kms run per month at section-iv of pkoc,manuguru area for a period of 4 years.-reg.

Read more
Hiring of 2wd tyre mounted loader (backhoe) for 12 hrs availability, 250 hrs per month for a period of 2 years for rgoc-2

Hiring of 2wd tyre mounted loader (backhoe) for 12 hrs availability, 250 hrs per month for a period of 2 years for rgoc-2

Read more
Supply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.

Supply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.

Read more
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis

Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise