Tender Details

Particulars Details
Title
Ramganj Lakhipur Daspara Road (Mdr) From Chainage 13.00km 13.50km, 14.00km 14.50km, 16.00km 16.50km,17.50km 18.00km And 19.60km 19.85km (In Stretches) Patch Repairing And Maintenance Work Under Uttar Dinajpur Division, Pwd During 2023 24
Description
Ramganj Lakhipur Daspara Road (Mdr) From Chainage 13.00km 13.50km, 14.00km 14.50km, 16.00km 16.50km,17.50km 18.00km And 19.60km 19.85km (In Stretches) Patch Repairing And Maintenance Work Under Uttar Dinajpur Division, Pwd During 2023 24
Organisation Government of West Bengal
Tender Id 2023_WBPWD_536358_1
Reference
Number
WBPWD/EE/UDD/NIT-05/2023-24
Tender Fee
EMD 13592
Tender Value
Place O/O THE EE,UDD,PWD,RAIGANJ
Link https://wbtenders.gov.in
Start Date June 05, 2023 16:30
End Date

18/07/2023 ( Expired 720 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders

Salar-kharera road from 0.80 kmp to 1.20 kmp, 1.80 kmp to 3.20 kmp, 5.00 kmp to 5.70 kmp and 6.70 kmp to 7.00 kmp urgent rain damage repairing work in stretches under murshidabad highway division no.ii during the year 2025-26

Read more
Nit 06 rnj of 2025 26

Emergent patch repairing of thakurbari bindol road in stretches from 0.00kmp to 08.00 kmp under raiganj highway sub division of uttar dinajpur highway division in the district of uttar dinajpur during the year 2025 2026

Read more
Dalkhola town road (old nh-34) from ch. 447.740 km to ch. 452.140 km surfacing work under uttar dinajpur division, pwd in the district of uttar dinajpur during the year 2024-25.

Dalkhola town road (old nh-34) from ch. 447.740 km to ch. 452.140 km surfacing work under uttar dinajpur division, pwd in the district of uttar dinajpur during the year 2024-25.

Read more
Nagor re- alignment stretch from km. 415.900 to km. 418.300 surfacing work under uttar dinajpur division, pwd in the district of uttar dinajpur during the year 2024-25.

Nagor re- alignment stretch from km. 415.900 to km. 418.300 surfacing work under uttar dinajpur division, pwd in the district of uttar dinajpur during the year 2024-25.

Read more

Mirzapur-fultala more to anuppur road from 0.00 kmp. to 0.30 km. and 2.00 kmp. to 5.20 km. patch repairing work in different stretches under murshidabad highway division no.i. in the district of murshidabad during the year 2025-2026

Read more
10/nit/ee/bfd-ii/2025-26

Con of border security fencing from phase ii/iii to new design fence in west bengal between bp no. 243/mp to 764/2-s (length 210.028 km). sh- in various stretches from bp no. 355/2-s to 357/1-s (4.725 km), 361/m to 365/m (6.329 km), 385/2-s to 385/5-s (0.800 km), near bp no. 399/8-r (0.030 km), 401/6-s to 402/2-s (0.180 km) and 409/5-s to 417/8-s (15.383 km). (total length 27.447 km including intermediate bops reverine structures like bridges, culverts, including gaps in fences and length of existing old fences which are not in the scope of this work etc.) along indo bangladesh border in the district of uttar dinajpur, west bengal. (package-v) in epc mode-iii. sw- providing services of watch ward for the cpwd office campus of border fencing division-ii, cpwd(ibbz-i), islampur.

Read more
Inside repairing and maintenance work of office of the executive engineer pwd cooch behar division ground floor record room and allied work

Inside repairing and maintenance work of office of the executive engineer pwd cooch behar division ground floor record room and allied work under cooch behar sub division no i pwd during the year 2025_26

Read more
Repairing and maintenance work of sukna birupur road from ch 0.00 to ch 2500 in stretches by repairing potholes , 20 mm pc and sc type b under birbhum division, p.w.dte during the year 2025 26

Repairing and maintenance work of sukna birupur road from ch 0.00 to ch 2500 in stretches by repairing potholes , 20 mm pc and sc type b under birbhum division, p.w.dte during the year 2025 26

Read more
Wbpwd/rd/ee/bshd/nit04/25-26/5

Pandua kulti road from 0.81 km to 1.65 km (in stretches) maintenance and repairing work under burdwan south highway division during the year 2025-26.

Read more
Maintenance of street lighting on pwd roads under west electrical division, pwd, new delhi during 2025-26.(sh- repairing upto 30 mtr. height high mast and misc. repair work of street light pole and cable laying)

Maintenance of street lighting on pwd roads under west electrical division, pwd, new delhi during 2025-26.(sh- repairing upto 30 mtr. height high mast and misc. repair work of street light pole and cable laying)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise