Tender Details

Particulars Details
Title
Amc For Providing And Fixing Foundation Bolts With Microconcrete Grouting At Damaged Portion Of Column Pedestal On As And When Required Basis Inside New Silo Of Bharatpur Ocp For A Period Of 02 Years.
Description
Amc For Providing And Fixing Foundation Bolts With Microconcrete Grouting At Damaged Portion Of Column Pedestal On As And When Required Basis Inside New Silo Of Bharatpur Ocp For A Period Of 02 Years.
Organisation Mahanadi Coalfields Limited | Public Sector Undertakings
Tender Id 2024_MCL_315402_1
Reference
Number
GM(BA)/SO(C)/e Tender/2024-25/412 Dt.16.08.2024
Tender Fee 0
EMD 26000
Tender Value -
Place BHARATPUR OCP
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=326860

Start Date August 19, 2024 15:30
End Date
Expired 29/08/2024

Expired 776 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Custom bid for services - contractual roof bolting and full column grouting of roof bolts with cement resin capsules for depillaring panel sw5a and sw5b in seam iv at naheriya underground mine of pench area

Custom bid for services - contractual roof bolting and full column grouting of roof bolts with cement resin capsules for depillaring panel sw5a and sw5b in seam iv at naheriya underground mine of pench area

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Read more
Supply of foundation anchor bolts, diamond core drilling and chemical grouting of bolts as per tender specifications

Supply of foundation anchor bolts, diamond core drilling and chemical grouting of bolts as per tender specification.

Read more
Supply of foundation anchor bolts, diamond core drilling and chemical grouting of bolts as per tender specifications

Supply of foundation anchor bolts, diamond core drilling and chemical grouting of bolts as per tender specifications

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise