| Particulars | Details |
|---|---|
| Title |
Amc For Providing And Fixing Foundation Bolts With Microconcrete Grouting At Damaged Portion Of Column Pedestal On As And When Required Basis Inside New Silo Of Bharatpur Ocp For A Period Of 02 Years.
|
| Description |
Amc For Providing And Fixing Foundation Bolts With Microconcrete Grouting At Damaged Portion Of Column Pedestal On As And When Required Basis Inside New Silo Of Bharatpur Ocp For A Period Of 02 Years.
|
| Organisation | Mahanadi Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_MCL_315402_1 |
|
Reference Number |
GM(BA)/SO(C)/e Tender/2024-25/412 Dt.16.08.2024 |
| Tender Fee | 0 |
| EMD | 26000 |
| Tender Value | - |
| Place | BHARATPUR OCP |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=326860 |
| Start Date | August 19, 2024 15:30 |
| End Date |
Expired
29/08/2024
Expired 776 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Custom bid for services - contractual roof bolting and full column grouting of roof bolts with cement resin capsules for depillaring panel sw5a and sw5b in seam iv at naheriya underground mine of pench area
Custom bid for services - contractual roof bolting and full column grouting of roof bolts with cement resin capsules for depillaring panel sw5a and sw5b in seam iv at naheriya underground mine of pench area
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read moreSupply of foundation anchor bolts, diamond core drilling and chemical grouting of bolts as per tender specifications
Supply of foundation anchor bolts, diamond core drilling and chemical grouting of bolts as per tender specification.
Read moreSupply of foundation anchor bolts, diamond core drilling and chemical grouting of bolts as per tender specifications
Supply of foundation anchor bolts, diamond core drilling and chemical grouting of bolts as per tender specifications
Read moreCustom bid for services - contractual roof bolting and full column grouting of roof bolts with resi
Read more
Custom bid for services - contractual roof bolting and full column grouting of roof bolts with resi
Read more
Custom bid for services - contractual roof bolting and full column grouting of roof bolts with ceme
Read more
of your Industry type