Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Providing Vitrified Tiled Flooring To The Canara Bank Located At The 1st Floor Of New Commercial Complex Building In Nitk
|
Description |
Providing Vitrified Tiled Flooring To The Canara Bank Located At The 1st Floor Of New Commercial Complex Building In Nitk
|
Organisation | National Institute of Technology Karnataka | Central Govt. Ministry/Department |
Tender Id | 2024_NITK_813760_1 |
Reference Number |
Tender No.10/2024-25/HD |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | NITK, SURATHKAL |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=855193 |
Start Date | June 28, 2024 15:30 |
End Date |
09/07/2024 ( Expired 362 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreConst. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Read moreRsrtc invite tender for leasing of commercial space and maintenance of entire new building at central bus stand, jodhpur
Rsrtc invite tender for leasing of commercial space and maintenance of entire new building at central bus stand, jodhpur
Read more1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
Read moreLean to shed covered area for various places and extension of covered roof storage area in rdq yard with rcc flooring and side coverage of open area to avoid rain water entry during rain bangalore complex, beml limited.
Lean to shed covered area for various places and extension of covered roof storage area in rdq yard with rcc flooring and side coverage of open area to avoid rain water entry during rain bangalore complex, beml limited.
Read moreCs for preparation of dpr for (i) cons. of 6 lane prayagraj southern bypass phase2 (l 34.4 km) section from km 0.000 to 34.400 in uttar pradesh (ii) construction of new bridge at yamuna river parallel to naini cable stayed bridge in uttarpradesh
Cs for preparation of dpr for (i) cons. of 6 lane prayagraj southern bypass phase2 (l 34.4 km) section from km 0.000 to 34.400 in uttar pradesh (ii) construction of new bridge at yamuna river parallel to naini cable stayed bridge in uttarpradesh
Read moreSpl repair to 1st floor of bldg no p-105 at adc ah rr under ge em rr hosp delhi cantt10
Spl repair to 1st floor of bldg no p-105 at adc ah rr under ge em rr hosp delhi cantt10
Read moreIntegration of boys hostel with dmrc academy, construction of new simulator room backside of a-block dmrc academy, development of lounge area on 1st and 2nd floor of boys hostel and provision of new entry/exit at shastri park depot.
Integration of boys hostel with dmrc academy, construction of new simulator room backside of a-block dmrc academy, development of lounge area on 1st and 2nd floor of boys hostel and provision of new entry/exit at shastri park depot.
Read moreLandslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Read moreProviding of earthing for new equipment to be installed in sldc and laying of connecting cables between new equipment and earthing foundation and shed for new genand allied works as per requirement of uldc iii
Providing of earthing for new equipment to be installed in sldc and laying of connecting cables between new equipment and earthing foundation and shed for new genand allied works as per requirement of uldc iii
Read moreof your Industry type