Tender Details
Particulars | Details |
---|---|
Title |
A Construction Of A Security Post Near Adit I Aps Top Right Bank Of Dam B Construction Of Rain Shelter At Dam Site B Electrification Of Security Posts Near Adit I Aps Top Right Bank Of Dam Teesta V Power Station
|
Description |
A Construction Of A Security Post Near Adit I Aps Top Right Bank Of Dam B Construction Of Rain Shelter At Dam Site B Electrification Of Security Posts Near Adit I Aps Top Right Bank Of Dam Teesta V Power Station
|
Organisation | Central Public Procurement Portal 1 |
Tender Id | 2023_NHPC_784449_1 |
Reference Number |
NH/TSV/Cont/CC-314/NIT-879 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | Contract Division Teesta V Power Station Balutar S |
Link | https://eprocure.gov.in |
Start Date | December 08, 2023 20:30 |
End Date |
05/01/2024 ( Expired 474 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Repair of existing drains, dormitory rooms with proper water supply arrangement and other miscellaneous repair works with painting at right bank near 33kva substation and cisf post/main gate area of teesta low dam-iii power station
Repair of existing drains, dormitory rooms with proper water supply arrangement and other miscellaneous repair works with painting at right bank near 33kva substation and cisf post/main gate area of teesta low dam-iii power station
Read moreConstruction of left bank spillway extension wall up to di tunnel outlet at dam site of kishanganga power station at gurez, bandipora, j and k (pkg-532).
Construction of left bank spillway extension wall up to di tunnel outlet at dam site of kishanganga power station at gurez, bandipora, j and k (pkg-532).
Read moreConstruction of control room building for 33 or 0.433 kv substation at right bank near dam site, dibang multipurpose project, arunachal pradesh
Construction of control room building for 33 or 0.433 kv substation at right bank near dam site, dibang multipurpose project, arunachal pradesh
Read moreProtection work on left and right bank of river in various reaches/rds between downstream of dam to adit-i portal of uri-ii power station, jk
Protection work on left and right bank of river in various reaches/rds between downstream of dam to adit-i portal of uri-ii power station, jk
Read moreRepair of main access road from rd plus minus 550 m to rd plus minus 620 m at dam site of teesta v power station
Repair of main access road from rd plus minus 550 m to rd plus minus 620 m at dam site of teesta v power station
Read moreD e p o s i t - p o o k k a r a t h o t t a m k a d a v u - construction of kadavu on right bank of kalpathypuzha at pookkarathottam in pulinchodu in ward 52 olavakkode south of palakkad municipality-general civil work
D e p o s i t - p o o k k a r a t h o t t a m k a d a v u -&#x0d construction of kadavu on right bank of&#x0d kalpathypuzha at pookkarathottam in&#x0d pulinchodu in ward 52 olavakkode south of&#x0d palakkad municipality-general civil work
Read moreConstruction of cross-drainage work along with hume pipe culvert near rd-152m (rd-0 end of ph road) in left bank play ground area side of teesta-v power station, balutar
Construction of cross-drainage work along with hume pipe culvert near rd-152m (rd-0 end of ph road) in left bank play ground area side of teesta-v power station, balutar
Read moreProtection work of upstream approach road from rd plus minus 420m to rd plus minus 480m (left bank) upstream of dam axis, teesta v power station
Protection work of upstream approach road from rd plus minus 420m to rd plus minus 480m (left bank) upstream of dam axis, teesta v power station
Read moreRepairs replacement of old damaged post top lights near station hq at af stn singarsi under age i af singarsi
Repairs replacement of old damaged post top lights near station hq at af stn singarsi under age i af singarsi
Read moreReservoir rim treatment work near zang village from rd plus minus 1150m of dam axis to rd plus minus 1600m and rd plus minus 615m of dam axis to rd plus minus 625m upstream of dam axis of teesta-v power station.
Reservoir rim treatment work near zang village from rd plus minus 1150m of dam axis to rd plus minus 1600m and rd plus minus 615m of dam axis to rd plus minus 625m upstream of dam axis of teesta-v power station.
Read moreof your Industry type