Tender Details
Particulars | Details |
---|---|
Title |
Jungle Clearance Of Road From Abbavaram To Indukurpalli Road From Km 0/0 To 1/950 2) Varigapapireddipalli To Settipallivandlapalli Road 0/0 To 1/3 3) Guttapalli Cross To Narasareddipalli Via Peddabidiki Settipalli Road 0/0 To 0/520 4) Ck Road To Kesapuram Via Polimerapalli Bonamalla Road 3/250 To 9/490 5) Cherlopalli Cross To Kona Kalakada Road 8/680 To 10/590 6) Ck Road To Narasareddypalli Road 0/0 To 5/850 7) Ck Road To Yerramanenipalem Road Via Settipalli Road 0/0 To 6/630 In Annamayya Dist
|
Description |
Jungle Clearance Of Road From Abbavaram To Indukurpalli Road From Km 0/0 To 1/950 (2) Varigapapireddipalli To Settipallivandlapalli Road 0/0 To 1/3 (3) Guttapalli Cross To Narasareddipalli (Via)peddabidiki, Settipalli Road 0/2 To 0/520 4) Ck Road To Kesapuram (Via) Polimerapalli,Bonamalla Road 3/250 To 9/490, (5) Cherlopalli Cross To Kona Kalakada Road 8/680 To 10/590, (6) Ck Road To Narasareddypalli Road 0/0 To 5/850 (7) Ck Road To Yerramanenipalem Road (Via) Settipalli Road 0/0 To 6/630 In Annamayya District.
|
Organisation | Information Technology, Electronics and Communications Andhra Pradesh | State Govt. and UT |
Tender Id | 765630 |
Reference Number |
Nit No.81 /2024-25/T.O/ Dt:16.11.2024 |
Tender Fee | 105 |
EMD | 3000 |
Tender Value | |
Place | AP |
Link | https://tender.apeprocurement.gov.in |
Start Date | November 20, 2024 20:30 |
End Date |
27/11/2024 ( Expired 173 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Mtc of the road from kk road at natingcherra to halambasti via atharomuri under south unakoti v c total length 3 553 km during the year 2025 26 sh patch gsb patch metalling grouting carpeting etc from ch 0 00 km ch 1 78 km
Mtc of the road from kk road at natingcherra to halambasti via atharomuri under south unakoti v c total length 3 553 km during the year 2025 26 sh patch gsb patch metalling grouting carpeting etc from ch 0 00 km ch 1 78 km
Read moreConstruction and m.t of rama mandir to bane di hatti via andora upperla, jattan-da- beehra from km. 0-0 to 3-225 including 1 no. bridge over amb khad at rd 0-450 on pucca paroh andora road in district una h.p under nabard ridf-xxx
Construction and m.t of rama mandir to bane di hatti via andora upperla, jattan-da- beehra from km. 0-0 to 3-225 including 1 no. bridge over amb khad at rd 0-450 on pucca paroh andora road in district una h.p under nabard ridf-xxx
Read moreConstructing w.b.m. b.t. road from sounde-gulsadi-deolali toward odr 6, odr 7, ch.0/00 to 6/500 (1/250 to 3/00), tal. karmala, dist. solapur
Constructing w.b.m. b.t. road from sounde-gulsadi-deolali toward odr 6, odr 7, ch.0/00 to 6/500 (1/250 to 3/00), tal. karmala, dist. solapur
Read moreRepair and cleaning of storm water drain 1 sikri sweet chowk to raiway line 2. chhati patshahi gurudwara to railway station 3.railway road to sai chowk 4. pehowa road both side roads 5.foji colony to railway road 6. laxman chowk via sikri sweet to
Repair and cleaning of storm water drain 1 sikri sweet chowk to raiway line 2. chhati patshahi gurudwara to railway station 3.railway road to sai chowk 4. pehowa road both side roads 5.foji colony to railway road 6. laxman chowk via sikri sweet to
Read morePeriodical renewal to nh16 to nh-44 via donkal, renjarla from km 14/0 to 23/850 including construction of h.p culvert at km 6/2-4, 6/6-8, 7/2-4,9/8-10 and protective wall at km 8/8 in nizamabad district.. (sub work- providing road safety interventions)
Periodical renewal to nh16 to nh-44 via donkal, renjarla from km 14/0 to 23/850 including construction of h.p culvert at km 6/2-4, 6/6-8, 7/2-4,9/8-10 and protective wall at km 8/8 in nizamabad district.. (sub work- providing road safety interventions)
Read moreImp/dev of drainage system and road in gautampuri (1) sh 1 gali no-12 links from h.no r-93 to t-399, t-397 to t-157/14 (2) t-399 to t-392 (3) t-399 to t-404 (4) t-402 to t-408 (5) t-428 to t-419 (6) t-428 to t-437 in ward no 226 gautampuri ee (miv) s
Imp/dev of drainage system and road in gautampuri (1) sh 1 gali no-12 links from h.no r-93 to t-399, t-397 to t-157/14 (2) t-399 to t-392 (3) t-399 to t-404 (4) t-402 to t-408 (5) t-428 to t-419 (6) t-428 to t-437 in ward no 226 gautampuri ee (miv) s
Read moreRepair and cleaning of storm water drain 1. sikri sweet chowk to raiway line 2. chhati patshahi gurudwara to railway station 3.railway road to sai chowk 4. pehowa road both side roads 5.foji colony to railway road 6. laxman chowk via sikri sweet to
Repair and cleaning of storm water drain 1. sikri sweet chowk to raiway line 2. chhati patshahi gurudwara to railway station 3.railway road to sai chowk 4. pehowa road both side roads 5.foji colony to railway road 6. laxman chowk via sikri sweet to
Read moreWidening and strengthening of 1. r and b pwd road to pagidimarri via road kothapally, anantharam, vemireddygudem, deepavarigudem from km 0/0 to 8/7, ii. pagidimarri to madhanapuram road from km 0/0 to 3/0 and iii. pagidimarri road to khudavanpur road from km 0/0 to 3/0 ( including constructions of hlb at km 8/2-4 on somannavagu in nalgonda district ( sub work: conducting sub soil investigation work for hlb at km 8/2-4)
Widening and strengthening of 1. r and b pwd road to pagidimarri via road kothapally, anantharam, vemireddygudem, deepavarigudem from km 0/0 to 8/7, ii. pagidimarri to madhanapuram road from km 0/0 to 3/0 and iii. pagidimarri road to khudavanpur road from km 0/0 to 3/0 ( including constructions of hlb at km 8/2-4 on somannavagu in nalgonda district ( sub work: conducting sub soil investigation work for hlb at km 8/2-4)
Read moreWidening and strengthening from single lane to double lane of nalgonda town portion from km 0/0 - 1/0 in municipal limits, nalgonda - mushampally road from km 0/0 -12/0, mushampally - kannekal via dharmapuram km 0/0 -6/2 ( pr road) and mukundhapur - thipparthy road from km 16/0 -24/5 in nalgonda district ( sub work :- conducting sub soil investigation work for hlb at km 23/724 of mukundapur - thipparthy road )
Widening and strengthening from single lane to double lane of nalgonda town portion from km 0/0 - 1/0 in municipal limits, nalgonda - mushampally road from km 0/0 -12/0, mushampally - kannekal via dharmapuram km 0/0 -6/2 ( pr road) and mukundhapur - thipparthy road from km 16/0 -24/5 in nalgonda district ( sub work :- conducting sub soil investigation work for hlb at km 23/724 of mukundapur - thipparthy road )
Read moreWidening and strengthening of 1. r and b pwd road to pagidimarri via road kothapally, anantharam, vemireddygudem, deepavarigudem from km 0/0 to 8/7, ii. pagidimarri to madhanapuram road from km 0/0 to 3/0 and iii. pagidimarri road to khudavanpur road from km 0/0 to 3/0 ( including constructions of hlb at km 8/2-4 on somannavagu in nalgonda district ( sub work: providing consultancy services for conducting topograhical survey and preparation of plan and profile)
Widening and strengthening of 1. r and b pwd road to pagidimarri via road kothapally, anantharam, vemireddygudem, deepavarigudem from km 0/0 to 8/7, ii. pagidimarri to madhanapuram road from km 0/0 to 3/0 and iii. pagidimarri road to khudavanpur road from km 0/0 to 3/0 ( including constructions of hlb at km 8/2-4 on somannavagu in nalgonda district ( sub work: providing consultancy services for conducting topograhical survey and preparation of plan and profile)
Read moreof your Industry type