Tender Details

Particulars Details
Title
Jungle Clearance Of Road From Abbavaram To Indukurpalli Road From Km 0/0 To 1/950 2) Varigapapireddipalli To Settipallivandlapalli Road 0/0 To 1/3 3) Guttapalli Cross To Narasareddipalli Via Peddabidiki Settipalli Road 0/0 To 0/520 4) Ck Road To Kesapuram Via Polimerapalli Bonamalla Road 3/250 To 9/490 5) Cherlopalli Cross To Kona Kalakada Road 8/680 To 10/590 6) Ck Road To Narasareddypalli Road 0/0 To 5/850 7) Ck Road To Yerramanenipalem Road Via Settipalli Road 0/0 To 6/630 In Annamayya Dist
Description
Jungle Clearance Of Road From Abbavaram To Indukurpalli Road From Km 0/0 To 1/950 (2) Varigapapireddipalli To Settipallivandlapalli Road 0/0 To 1/3 (3) Guttapalli Cross To Narasareddipalli (Via)peddabidiki, Settipalli Road 0/2 To 0/520 4) Ck Road To Kesapuram (Via) Polimerapalli,Bonamalla Road 3/250 To 9/490, (5) Cherlopalli Cross To Kona Kalakada Road 8/680 To 10/590, (6) Ck Road To Narasareddypalli Road 0/0 To 5/850 (7) Ck Road To Yerramanenipalem Road (Via) Settipalli Road 0/0 To 6/630 In Annamayya District.
Organisation Information Technology, Electronics and Communications Andhra Pradesh | State Govt. and UT
Tender Id 765630
Reference
Number
Nit No.81 /2024-25/T.O/ Dt:16.11.2024
Tender Fee 105
EMD 3000
Tender Value
Place AP
Link https://tender.apeprocurement.gov.in
Start Date November 20, 2024 20:30
End Date

27/11/2024 ( Expired 173 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Mtc of the road from kk road at natingcherra to halambasti via atharomuri under south unakoti v c total length 3 553 km during the year 2025 26 sh patch gsb patch metalling grouting carpeting etc from ch 0 00 km ch 1 78 km

Mtc of the road from kk road at natingcherra to halambasti via atharomuri under south unakoti v c total length 3 553 km during the year 2025 26 sh patch gsb patch metalling grouting carpeting etc from ch 0 00 km ch 1 78 km

Read more
Construction and m.t of rama mandir to bane di hatti via andora upperla, jattan-da- beehra from km. 0-0 to 3-225 including 1 no. bridge over amb khad at rd 0-450 on pucca paroh andora road in district una h.p under nabard ridf-xxx

Construction and m.t of rama mandir to bane di hatti via andora upperla, jattan-da- beehra from km. 0-0 to 3-225 including 1 no. bridge over amb khad at rd 0-450 on pucca paroh andora road in district una h.p under nabard ridf-xxx

Read more
Constructing w.b.m. b.t. road from sounde-gulsadi-deolali toward odr 6, odr 7, ch.0/00 to 6/500 (1/250 to 3/00), tal. karmala, dist. solapur

Constructing w.b.m. b.t. road from sounde-gulsadi-deolali toward odr 6, odr 7, ch.0/00 to 6/500 (1/250 to 3/00), tal. karmala, dist. solapur

Read more
Repair and cleaning of storm water drain 1 sikri sweet chowk to raiway line 2. chhati patshahi gurudwara to railway station 3.railway road to sai chowk 4. pehowa road both side roads 5.foji colony to railway road 6. laxman chowk via sikri sweet to

Repair and cleaning of storm water drain 1 sikri sweet chowk to raiway line 2. chhati patshahi gurudwara to railway station 3.railway road to sai chowk 4. pehowa road both side roads 5.foji colony to railway road 6. laxman chowk via sikri sweet to

Read more
Periodical renewal to nh16 to nh-44 via donkal, renjarla from km 14/0 to 23/850 including construction of h.p culvert at km 6/2-4, 6/6-8, 7/2-4,9/8-10 and protective wall at km 8/8 in nizamabad district.. (sub work- providing road safety interventions)

Periodical renewal to nh16 to nh-44 via donkal, renjarla from km 14/0 to 23/850 including construction of h.p culvert at km 6/2-4, 6/6-8, 7/2-4,9/8-10 and protective wall at km 8/8 in nizamabad district.. (sub work- providing road safety interventions)

Read more
Imp/dev of drainage system and road in gautampuri (1) sh 1 gali no-12 links from h.no r-93 to t-399, t-397 to t-157/14 (2) t-399 to t-392 (3) t-399 to t-404 (4) t-402 to t-408 (5) t-428 to t-419 (6) t-428 to t-437 in ward no 226 gautampuri ee (miv) s

Imp/dev of drainage system and road in gautampuri (1) sh 1 gali no-12 links from h.no r-93 to t-399, t-397 to t-157/14 (2) t-399 to t-392 (3) t-399 to t-404 (4) t-402 to t-408 (5) t-428 to t-419 (6) t-428 to t-437 in ward no 226 gautampuri ee (miv) s

Read more
Repair and cleaning of storm water drain 1. sikri sweet chowk to raiway line 2. chhati patshahi gurudwara to railway station 3.railway road to sai chowk 4. pehowa road both side roads 5.foji colony to railway road 6. laxman chowk via sikri sweet to

Repair and cleaning of storm water drain 1. sikri sweet chowk to raiway line 2. chhati patshahi gurudwara to railway station 3.railway road to sai chowk 4. pehowa road both side roads 5.foji colony to railway road 6. laxman chowk via sikri sweet to

Read more
Widening and strengthening of 1. r and b pwd road to pagidimarri via road kothapally, anantharam, vemireddygudem, deepavarigudem from km 0/0 to 8/7, ii. pagidimarri to madhanapuram road from km 0/0 to 3/0 and iii. pagidimarri road to khudavanpur road from km 0/0 to 3/0 ( including constructions of hlb at km 8/2-4 on somannavagu in nalgonda district ( sub work: conducting sub soil investigation work for hlb at km 8/2-4)

Widening and strengthening of 1. r and b pwd road to pagidimarri via road kothapally, anantharam, vemireddygudem, deepavarigudem from km 0/0 to 8/7, ii. pagidimarri to madhanapuram road from km 0/0 to 3/0 and iii. pagidimarri road to khudavanpur road from km 0/0 to 3/0 ( including constructions of hlb at km 8/2-4 on somannavagu in nalgonda district ( sub work: conducting sub soil investigation work for hlb at km 8/2-4)

Read more
Widening and strengthening from single lane to double lane of nalgonda town portion from km 0/0 - 1/0 in municipal limits, nalgonda - mushampally road from km 0/0 -12/0, mushampally - kannekal via dharmapuram km 0/0 -6/2 ( pr road) and mukundhapur - thipparthy road from km 16/0 -24/5 in nalgonda district ( sub work :- conducting sub soil investigation work for hlb at km 23/724 of mukundapur - thipparthy road )

Widening and strengthening from single lane to double lane of nalgonda town portion from km 0/0 - 1/0 in municipal limits, nalgonda - mushampally road from km 0/0 -12/0, mushampally - kannekal via dharmapuram km 0/0 -6/2 ( pr road) and mukundhapur - thipparthy road from km 16/0 -24/5 in nalgonda district ( sub work :- conducting sub soil investigation work for hlb at km 23/724 of mukundapur - thipparthy road )

Read more
Widening and strengthening of 1. r and b pwd road to pagidimarri via road kothapally, anantharam, vemireddygudem, deepavarigudem from km 0/0 to 8/7, ii. pagidimarri to madhanapuram road from km 0/0 to 3/0 and iii. pagidimarri road to khudavanpur road from km 0/0 to 3/0 ( including constructions of hlb at km 8/2-4 on somannavagu in nalgonda district ( sub work: providing consultancy services for conducting topograhical survey and preparation of plan and profile)

Widening and strengthening of 1. r and b pwd road to pagidimarri via road kothapally, anantharam, vemireddygudem, deepavarigudem from km 0/0 to 8/7, ii. pagidimarri to madhanapuram road from km 0/0 to 3/0 and iii. pagidimarri road to khudavanpur road from km 0/0 to 3/0 ( including constructions of hlb at km 8/2-4 on somannavagu in nalgonda district ( sub work: providing consultancy services for conducting topograhical survey and preparation of plan and profile)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise