Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Clearing Grass And Removal ...
|
| Description |
Clearing Grass And Removal Of Rubbish From Service Road And Dowel Of Rd 235000 To 278000 Jln Feeder.
|
| Organisation | Haryana Government | State Govt. and UT |
| Tender Id | 2026_HRY_526390_1 |
|
Reference Number |
20260520DC5B 9C21 435B A4CF BF7F4A197BB3152IRR |
| Tender Fee | 1500 |
| EMD | 4460 |
| Tender Value | - |
| Place | MATAN HAIL |
| Link |
View Original Tender Notice
https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=605367 |
| Start Date | June 03, 2026 22:30 |
| End Date |
Expired
10/06/2026
Expired 85 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Empanelment of agencies and fixing rate contract on per metric tonne (mt) basis for complete clearing, removal, loading, transportation, weighment, and disposal of debris from private vacant sites to the designated location as notified by bscc
Empanelment of agencies and fixing rate contract on per metric tonne (mt) basis for complete clearing, removal, loading, transportation, weighment, and disposal of debris from private vacant sites to the designated location as notified by bscc
Read moreRemoval of silt and jungle clearance of lead off canal-1 and 2 of mlis for the year-2026-27
Removal of silt and jungle clearance of lead off canal-1 and 2 of mlis for the year-2026-27
Read moreReplacement of existing smoke tubes in 4tph fire tube boiler reg.no.mys-1982 including supply, removal, installation, testing, and commissioning at bengaluru dairy
Replacement of existing smoke tubes in 4tph fire tube boiler reg.no.mys-1982 including supply, removal, installation, testing, and commissioning at bengaluru dairy
Read moreRemoval of silt and jungle clearance of salawadagi main canal from 0.00km to 13.00 km at selected reaches for the year 2026-27
Removal of silt and jungle clearance of salawadagi main canal from 0.00km to 13.00 km at selected reaches for the year 2026-27
Read moreGrass and bushes cutting work in switchyard and campus area of 132/33 kv gss, barhait under transmission division, lalmatia for the period 16.09.2026 to 31.03.2027
Grass and bushes cutting work in switchyard and campus area of 132/33 kv gss, barhait under transmission division, lalmatia for the period 16.09.2026 to 31.03.2027
Read moreRoutine collection, loading, transportation and unloading of mill rejects, coal (dry or wet), clearing of coal from feeder floor during calibration of mill, hfo unloading and miscellaneous works of unit 1,2 & 3 for a period of one year
Routine collection, loading, transportation and unloading of mill rejects, coal (dry or wet), clearing of coal from feeder floor during calibration of mill, hfo unloading and miscellaneous works of unit 1,2 & 3 for a period of one year
Read moreRemoval of silt and jungle clearance of basavan bagewadi branch canal from ch 0.00 to72.55 km including distributaries, laterals and sublateral at selected reaches for the year 2026-27.
Removal of silt and jungle clearance of basavan bagewadi branch canal from ch 0.00 to72.55 km including distributaries, laterals and sublateral at selected reaches for the year 2026-27.
Read moreRemoval of silt and jungle clearance of mli east canal from ch 0.00 to 17.22 km including distributaries, laterals and sub lateral at selected reaches for the year 2026-27
Removal of silt and jungle clearance of mli east canal from ch 0.00 to 17.22 km including distributaries, laterals and sub lateral at selected reaches for the year 2026-27
Read moreRemoval of silt and jungle clearance of mli west canal from ch 15.00 to 30.0 km including distributaries, laterals and sub lateral at selected reaches for the year 2026-27.
Removal of silt and jungle clearance of mli west canal from ch 15.00 to 30.0 km including distributaries, laterals and sub lateral at selected reaches for the year 2026-27
Read moreRemoval of silt and jungle clearance of mli west canal from ch 0.00 to 15.00 km including distributaries, laterals and sub laterals at selected reaches for the year 2026-27
Removal of silt and jungle clearance of mli west canal from ch 0.00 to 15.00 km including distributaries, laterals and sub laterals at selected reaches for the year 2026-27
Read moreof your Industry type