Tender Details
Particulars | Details |
---|---|
Title |
Repairing And Removal Of 12 Nos. Broken Bolts Of Swing ,Ring Gear Of Ck 300 Shovel 790 By Jacking Up The Turret (Upper Frame) With Hyd. Jacks
|
Description |
Repairing And Removal Of 12 Nos. Broken Bolts Of Swing ,Ring Gear Of Ck 300 Shovel 790 By Jacking Up The Turret (Upper Frame) With Hyd. Jacks
|
Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_ECL_331592_1 |
Reference Number |
ECL/MA/EXCV/TENDER/24-25/85 |
Tender Fee | 0 |
EMD | 1600 |
Tender Value | |
Place | BARMURI OCP |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=343939 |
Start Date | March 08, 2025 22:30 |
End Date |
18/03/2025 ( Expired 80 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Repairing of cracked swing circle foundation and replacement of swing gear assembly and replacement of upper and lower seals of landt 300ck shovel, exc-2901 of gvp ph ii ocp.
Repairing of cracked swing circle foundation and replacement of swing gear assembly and replacement of upper and lower seals of landt 300ck shovel, exc-2901 of gvp ph ii ocp.
Read moreRepairing or removal of 18 no. brocken bolts of swing ring gear of tata hitachi ex350 shovel sl no. 2518 of rajpura ocp
Repairing or removal of 18 no. brocken bolts of swing ring gear of tata hitachi ex350 shovel sl no 2518 of rajpura ocp
Read moreRepairing work of both side sprocket assembly, swing motor mounting plate, denting, painting of side wall and damaged steel tubes of ck 300 shovel sl. no. 737 deployed at topa ocp, kuju area
Repairing work of both side sprocket assembly, swing motor mounting plate, denting, painting of side wall and damaged steel tubes of ck 300 shovel sl. no. 737 deployed at topa ocp, kuju area
Read moreRepairing replacement of swing gear pinion assembly denting fabrication of er weight repairing of bucket cylinder assembly and its fitment along with fitment of 02 nos cabing glass of lnt ck 300 hydraulic shovel sl no b782 working at ttk ocp und
Repairing replacement of swing gear pinion assembly denting fabrication of er weight repairing of bucket cylinder assembly and its fitment along with fitment of 02 nos cabing glass of lnt ck 300 hydraulic shovel sl no b782 working at ttk ocp und
Read moreRepairing of two nos take up wheels eye housing (as float) by line boring with fitting of bushes into ekg shovel sl. no. 576 working at ilbl ocp, lakhanpur area, mcl.
Repairing of two nos take up wheels eye housing (as float) by line boring with fitting of bushes into ekg shovel sl. no. 576 working at ilbl ocp, lakhanpur area, mcl.
Read moreRepairing of shipper shaft with by removing damage bush wear portion and repairing and changing of new track bar and swing circle roller, rocker arm and dipper stick hinge for ekg5a shovel sl no. hmb-590
Repairing of shipper shaft with by removing damage bush wear portion and repairing and changing of new track bar and swing circle roller, rocker arm and dipper stick hinge for ekg5a shovel sl no. hmb-590
Read moreRepairing of machine housing, platform, railing, glass fitting and 02 nos. half broken hoist gear spline repairing, of machine sl no. hmb 419 shovel of rohini project, nk area.
Repairing of machine housing, platform, railing, glass fitting and 02 nos. half broken hoist gear spline repairing, of machine sl no. hmb 419 shovel of rohini project, nk area.
Read moreRepairing of 02 nos. a frame bearing , repairing by eye making as per pin size, bush fitment, plate fitment, fabrication of 04 nos. of steel tube and differential arm of cat777d dumper sl. no. th-11 th-12 at ashok ocp.
Repairing of 02 nos. a frame bearing , repairing by eye making as per pin size, bush fitment, plate fitment, fabrication of 04 nos. of steel tube and differential arm of cat777d dumper sl. no. th-11 th-12 at ashok ocp.
Read moreRepairing and removal of 12 nos. broken bolts of swing ,ring gear of ck-300 shovel -790 by jacking up the turret (upper frame) with hyd. jacks
Repairing and removal of 12 nos. broken bolts of swing ,ring gear of ck-300 shovel -790 by jacking up the turret (upper frame) with hyd. jacks
Read moreRepairing of rhs final drive, removal of 16 no. brocken bolts of swing, ring gear, 3. removal of engine from shovel ck300 sl no. 792, repairing of oval shape of the mounting hole and bracket of engine, fitment of removed engine in shovel
Repairing of rhs final drive, removal of 16 no. brocken bolts of swing, ring gear, 3. removal of engine from shovel ck300 sl no. 792, repairing of oval shape of the mounting hole and bracket of engine, fitment of removed engine in shovel
Read moreof your Industry type