Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Design Construction Establishment And Development Of Solid Waste Processing Plant For Cluster 3 Ul Bs Scalable Further As Per The Requirements With Operation And Maintenance For 20 Years On Vgf Basis
|
| Description |
Design Construction Establishment And Development Of Solid Waste Processing Plant For Cluster 3 Ul Bs Scalable Further As Per The Requirements With Operation And Maintenance For 20 Years On Vgf Basis
|
| Organisation | Government of Rajasthan |
| Tender Id | 2023_DLB_361237_3 |
|
Reference Number |
64929 |
| Tender Fee | 5000 |
| EMD | 42.08 Lakh |
| Tender Value | |
| Place | DLB Jaipur |
| Link |
View Original Tender Notice
https://eproc.rajasthan.gov.in |
| Start Date | September 04, 2023 20:30 |
| End Date |
Expired
14/09/2023
Expired 999 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Development of internal infrastructure for integrated manufacturing and logistics cluster at budaun with defect liability period and operation and maintenance for concurrent period of five years on epc mode
Development of internal infrastructure for integrated manufacturing and logistics cluster at budaun with defect liability period and operation and maintenance for concurrent period of five years on epc mode
Read moreExperience of interest are invited from experienced agency for selection of technology and sustainable operation of horticulture waste processing plant of 100 tdp and more with operation and maintenance in lmc
Experience of interest are invited from experienced agency for selection of technology and sustainable operation of horticulture waste processing plant of 100 tdp and more with operation and maintenance in lmc
Read moreSurvey, design, fabrication, supply, installation, testing and commissioning of total 27.32 kwp of on grid connected rooftop solar pv power plant including comprehensive maintenance contract (cmc) for 3 years
Survey, design, fabrication, supply, installation, testing and commissioning of total 27.32 kwp of on grid connected rooftop solar pv power plant including comprehensive maintenance contract (cmc) for 3 years
Read moreDevelopment of iot-based system for door-to-door municipal solid waste collection and transportation of segregated msw to processing site under the jurisdiction of nagar palika parishad chattarpur
Development of iot-based system for door-to-door municipal solid waste collection and transportation of segregated msw to processing site under the jurisdiction of nagar palika parishad chattarpur
Read moreRfp for selection of agency for setting up 2.0 mw ac with 20 prasetnt extra dc system i.e 2.4 mw dc on-grid ground mounted solar photovoltaic power plant with 10-years of operation comprehensive maintenance and development of alleged infrastructure w
Rfp for selection of agency for setting up 2.0 mw ac with 20 prasetnt extra dc system i.e 2.4 mw dc on-grid ground mounted solar photovoltaic power plant with 10-years of operation comprehensive maintenance and development of alleged infrastructure w
Read moreDesign, drawing, construction, testing and commissioning of sewerage system, 220 kld sewage treatment plant (stp) and 55 kld effluent treatment plant (etp) for city hospital in berhampur including operation and maintenance for a period of five years
Design, drawing, construction, testing and commissioning of sewerage system, 220 kld sewage treatment plant (stp) and 55 kld effluent treatment plant (etp) for city hospital in berhampur including operation and maintenance for a period of five years
Read moreSurvey design fabrication supply installation testing and commissioning of total 12.60 kw of on grid connected rooftop solar pv power plant including comprehensive maintenance contract cmc for 05 years
Survey design fabrication supply installation testing and commissioning of total 12.60 kw of on grid connected rooftop solar pv power plant including comprehensive maintenance contract cmc for 05 years at krushibeej farmer producer company ltt
Read moreRequest for proposal for development, deployment and operationalization of rcs platform including maap (message as a platform) for bsnl customers on opex model for the period of two years.
Request for proposal for development, deployment and operationalization of rcs platform including maap (message as a platform) for bsnl customers on opex model for the period of two years.
Read moreTender for selection of banker as issuing and paying agent (ipa) for issuance of commercial papers for the period of three years i.e. from 01st july 2026 to 30th june 2029 on limited tender basis
Tender for selection of banker as issuing and paying agent (ipa) for issuance of commercial papers for the period of three years i.e. from 01st july 2026 to 30th june 2029 on limited tender basis
Read moreSupply and commissioning of manual and robotic system capable of inspecting water supply pipelines with diameters ranging from 80 mm to 2200 mm along with the operation and maintenance support for 3 years with all setup including vehicle and staff
Supply and commissioning of manual and robotic system capable of inspecting water supply pipelines with diameters ranging from 80 mm to 2200 mm along with the operation and maintenance support for 3 years with all setup including vehicle and staff
Read moreof your Industry type