Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🛣️ Procurement Bid: Maintenance And Construction Of Roads In Khowai 🛣️ The Chief Engineer, Pwd (R And B), State Govt. And Ut, Invites Bids For The Maintenance And Construction Of Various Roads Under Tulasikhar Block For The Year 2024 2025. 🚧 📅 Bid Submission Deadline: July 16, 2024, 3:00 Pm Tender Fee: Inr 1000 Emd: Inr 47,174 This Project Includes Sub Divisional Major Connectivity (S.H Wbm 2), Sub Divisional Major Connectivity (Wbm 2), Sub Divisional Major Connectivity (Wbm 3), And Recarpeting Work, Among Others. 🏗️ Interested Bidders Should Possess The Necessary Qualifications And Experience In Road Construction And Maintenance Works. Comprehensive Bids Should Detail The Proposed Methodology, Timelines, And Cost Estimates. Keywords: Road Maintenance, Construction, Pwd, Tulasikhar Block, Khowai, Government Tender, Bid, Infrastructure Development| Particulars | Details |
|---|---|
| Title |
Mtc.Of Various Roads Under Tulasikhar Block During The Year 2024 2025 S.H Wbm 2 Wbm 3 And Recarpeting Work Etc. Gr I
|
| Description |
Works
|
| Organisation | Chief Engineer, PWD (R and B) | State Govt. and UT |
| Tender Id | 2024_CEPWD_50178_1 |
|
Reference Number |
13/EE/PWDRandB/KHW/2024 -25 |
| Tender Fee | 1000 |
| EMD | 47174 |
| Tender Value | - |
| Place | Khowai |
| Link |
View Original Tender Notice
https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=51028 |
| Start Date | July 08, 2024 15:30 |
| End Date |
Expired
16/07/2024
Expired 818 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Providing of temporary lightning arrangements, generators and public address system on hire basis and special arrangements i.e., stage, tent, barricadding, clearing the ground etc., for the festival saddula bathukamma in mahabubabad municipality.
Providing of temporary lightning arrangements, generators and public address system on hire basis and special arrangements i.e., stage, tent, barricadding, clearing the ground etc., for the festival saddula bathukamma in mahabubabad municipality.
Read moreKtps vii stage-adm-ss-gs-rewiring of various type departmental quaters and offices etc in colony distribution i ii sections as and when required during the fy 2026-27
Ktps vii stage-adm-ss-gs-rewiring of various type departmental quaters and offices etc in colony distribution i ii sections as and when required during the fy 2026-27
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreOr of various roads under tulasikhar block during the year 2024 25 sh patch wbm 3 patch carpeting seal coat etc. group iii
Works
Read moreOr of various roads under tulasikhar block during the year 2024 25 sh patch wbm 3 patch carpeting seal coat etc. group iv
Works
Read moreOr of pwd roads under tulasikhar block during the year 2024 25 sh patch wbm 3 patch carpeting seal coat etc. group iii
Works
Read moreOr of pwd roads under tulasikhar block during the year 2024 25 sh patch wbm 3 patch carpeting seal coat etc. group iv
Works
Read moreof your Industry type