Tender Details
Particulars | Details |
---|---|
Title |
Asphalting Of Internal Road In Indiranagar Area Of Ward No. 10.
|
Description |
Asphalting Of Internal Road In Indiranagar Area Of Ward No. 10.
|
Organisation | Kalyan Dombivli Municipal Corporation | State Govt. and UT |
Tender Id | 2025_KDMC_1155487_1 |
Reference Number |
KDMC/PWD/2024-25/82-6 |
Tender Fee | 1090 |
EMD | 21200 |
Tender Value | |
Place | Kalyan Dombivli Municipal Corporation area |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2010058 |
Start Date | February 28, 2025 22:30 |
End Date |
07/03/2025 ( Expired 20 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of 4 laning in realignment stretch from km 561.200 to km 563.055 (peddasettipalli village) of hubli krishnapatnam road nh-67 in state of andhra pradesh
Construction of 4 laning in realignment stretch from km 561/200 to km 563/055 (peddasettipalli village) of hubli krishnapatnam road nh-67 in state of andhra pradesh
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreConsultancy services for preparation of dpr of farakka raiganj section of nh-12 (old nh-34) for long term mitigation measures of black spots ids wb-04-52-bs and wb-03-73-bs and construction of service road at sujapur area in the state of west bengal
Consultancy services for preparation of dpr of farakka raiganj section of nh-12 (old nh-34) for long term mitigation measures of black spots ids wb-04-52-bs and wb-03-73-bs and construction of service road at sujapur area in the state of west bengal
Read moreConstruction of six lane greenfield patna ring road highway (nh131g) from kanhauli to sherpur (from km. 0.000 to km 8.480) including junction development with bihta danapur elevated corridor (length1.5 km) (tl 9.98 km.) in bihar.
Construction of six lane greenfield patna ring road highway (nh131g) from kanhauli to sherpur (from km. 0.000 to km 8.480) including junction development with bihta danapur elevated corridor (length1.5 km) (tl 9.98 km.) in bihar.
Read moreRehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)
Rehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)
Read moreConstr imprvt of along - yingkiong road between km 40.00 to km 65.00 design chainage km 40.000 to 63.740 design length 23.740 km for constr and upgradation from cl09 to nhdl specn under 761 brtf project brahmank in ap on epc mode
Constr imprvt of along - yingkiong road between km 40.00 to km 65.00 design chainage km 40.000 to 63.740 design length 23.740 km for constr and upgradation from cl09 to nhdl specn under 761 brtf project brahmank in ap on epc mode
Read moreUpgradation of road budhal mahoregul from existing chainage km 65.880 to km 86.725 (design chainage km 53.250 to km 88.200 net length 34.950 km package iii to nhdl specification under p sampark in ut of j k on epc mode
Upgradation of road budhal mahoregul from existing chainage km 65.880 to km 86.725 (design chainage km 53.250 to km 88.200 net length 34.950 km package iii to nhdl specification under p sampark in ut of j k on epc mode
Read moreWidening of existing 2l, ps road to 4 lane with paved shoulder from km 69/750 to km 75/750 kushthla sawai madhopur section of nh 552 extn on epc mode under annual plan 2024-25 in the state of rajasthan. job no. nh552extn. rj / 2024-25/861
Widening of existing 2l, ps road to 4 lane with paved shoulder from km 69/750 to km 75/750 kushthla sawai madhopur section of nh 552 extn on epc mode under annual plan 2024-25 in the state of rajasthan. job no. nh552extn. rj / 2024-25/861
Read moreof your Industry type