Tender Details
Particulars | Details |
---|---|
Title |
Strengthening Of Road From Peknicherra Bridge Approach To Purna Chandra Para Via Santi Nagar Panchayet Office Under Khowai Assembly Constituency
|
Description |
Earthwork Gsb Wbm Ii Wbm Iii Bm Bc Road Side Pucca Drain Protection Work Etc. Length 4.00 Km Under Scheme For Special Assistance To States For Capital Investment For 2024 25
|
Organisation | Chief Engineer, PWD (R and B) | State Govt. and UT |
Tender Id | 2024_CEPWD_54047_1 |
Reference Number |
32/CE/PWDRandB/ACEPDU/2024-25 |
Tender Fee | 8000 |
EMD | 8.38 Lakh |
Tender Value | |
Place | Khowai |
Link | https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=54908 |
Start Date | November 02, 2024 15:30 |
End Date |
19/11/2024 ( Expired 178 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreConstruction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section
Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section
Read moreDesign and const of 590 mtr snow gallery, const of 483 mtr snow avalanche catch dam, 100 m loose rock scaling on d-s road approach road to south portal of proposed shinkun la tunnel under 126 rcc 13 tf of project yojak in the state of hp through epc
Design and const of 590 mtr snow gallery, const of 483 mtr snow avalanche catch dam, 100 m loose rock scaling on d-s road approach road to south portal of proposed shinkun la tunnel under 126 rcc 13 tf of project yojak in the state of hp through epc
Read moreUniversity tiraha via govindpuri choraha to alka puri tiraha and patel nagar road divider near income tax office hedge plantation/greenry with 03 month maintenance file no. 28/25x13/1
University tiraha via govindpuri choraha to alka puri tiraha and patel nagar road divider near income tax office hedge plantation/greenry with 03 month maintenance file no. 28/25x13/1
Read moreCc road and drain contruction from champalal rajak to girraj kushah, from shop of sunil maharaj to munna kushwah lamberdar in ward no 15 at nagar parisad badarwas district shivpuri
Cc road and drain contruction from champalal rajak to girraj kushah, from shop of sunil maharaj to munna kushwah lamberdar in ward no 15 at nagar parisad badarwas district shivpuri
Read moreMaintenance of road from ch.15.00 to 61.500 of nh 334a in total length of 46.500 km under performance based maintenance contract (pbmc) for the financial year 2024-25 in the state of uttarakhand
Maintenance of road from ch.15.00 to 61.500 of nh 334a in total length of 46.500 km under performance based maintenance contract (pbmc) for the financial year 2024-25 in the state of uttarakhand
Read moreR and r of bituminous concrete 30 mm on road from approach road to check post no. 2 , from check post no. 1 to circle office and other patch work at shanan power house , joginder nagar distt mandi (hp)
R and r of bituminous concrete 30 mm on road from approach road to check post no. 2 , from check post no. 1 to circle office and other patch work at shanan power house , joginder nagar distt mandi (hp)
Read moreWidening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Read moreStrengthening of road from nh208 to fatikroy via chebri chowmuhani under kumarghat pwd r and b division under ridf xxx of nabard job no tp_com_218_2024_25
Strengthening of road from nh208 to fatikroy via chebri chowmuhani under kumarghat pwd r and b division under ridf xxx of nabard job no tp_com_218_2024_25
Read morePermanent rectification of black spot (id no. cg-(03)-07) at pairi river approach-loharapta bridge gariyaband side from km.59.400 to km.60.100 of nh-130c on sbd mode in the state of chhattisgarh.
Permanent rectification of black spot (id no. cg-(03)-07) at pairi river approach-loharapta bridge gariyaband side from km.59.400 to km.60.100 of nh-130c on sbd mode in the state of chhattisgarh.
Read moreof your Industry type