Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Annual Maintenance Contract For Inbuilt Denso Make Air Conditioner In 02 No. Komatsu Make, Model Pc2000 8, Loading Hydraulic Shovels Deployed At Khadia Project For A Period Of 365 Days.
|
Description |
Annual Maintenance Contract For Inbuilt Denso Make Air Conditioner In 02 No. Komatsu Make, Model Pc2000 8, Loading Hydraulic Shovels Deployed At Khadia Project For A Period Of 365 Days.
|
Organisation | Northern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_NCL_336244_1 |
Reference Number |
KHD/G.M. (Excv)/E-Tender/25-26/244 |
Tender Fee | 0 |
EMD | 3600 |
Tender Value | |
Place | NCL KHADIA PROJECT, SHAKTINAGAR |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=348557 |
Start Date | May 28, 2025 15:00 |
End Date |
09/06/2025 ( Expired 12 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Annual maintenance contract (amc) of operator cabin air conditioning system of 04 nos epiroc make drill machines of khadia project for a period of 01 year (365 days).
Annual maintenance contract (amc) of operator cabin air conditioning system of 04 nos epiroc make drill machines of khadia project for a period of 01 year (365 days).
Read moreAnnual maintenance contract (amc) of operator cabin air conditioning system of 09 nos rel make drill machines of khadia project for a period of 01 year (365 days).
Annual maintenance contract (amc) of operator cabin air conditioning system of 09 nos rel make drill machines of khadia project for a period of 01 year (365 days).
Read moreAnnual maintenance contract for repair and maintenance of 02 nos. industrial air conditioners (25 kw, sunbeam make) fitted in pcr unit of 02 nos. 24/96 dragline (krishna and balram dragline) working at nigahi project, ncl for a period of one year.
Annual maintenance contract for repair and maintenance of 02 nos. industrial air conditioners (25 kw, sunbeam make) fitted in pcr unit of 02 nos. 24/96 dragline (krishna and balram dragline) working at nigahi project, ncl for a period of one year.
Read moreComprehensive maintenance contract of airsep make ogp of 1000 lpm capacity alongwith operation of 01 no. 1000 lpm ogp (airsep make) and 02 no. 1000 lpm ogps (inmatec make) installed at associated hospital of gmc baramulla for a period of one year
Comprehensive maintenance contract of airsep make ogp of 1000 lpm capacity alongwith operation of 01 no. 1000 lpm ogp (airsep make) and 02 no. 1000 lpm ogps (inmatec make) installed at associated hospital of gmc baramulla for a period of one year
Read moreAnnual maintenance of ut limited make hydraulic lifts installed at house no 35 sector 4 hon ble chief justice residence chandigarh (for the period 2025 2026
Annual maintenance of ut limited make hydraulic lifts installed at house no 35 sector 4 hon ble chief justice residence chandigarh (for the period 2025 2026
Read moreAnnual maintenance contract for cabin airconditioning system in 01 nos tata hitachi zaxis650h hydraulic excavator pc06 at dudhichua project for a period of 02 years
Annual maintenance contract for cabin airconditioning system in 01 nos tata hitachi zaxis650h hydraulic excavator pc06 at dudhichua project for a period of 02 years
Read moreAnnual maintenance contract for air conditioners fitted in operator cabin of pc 2000-8 hyd. shovel of jayant project for the period of one year (365days).
Annual maintenance contract for air conditioners fitted in operator cabin of pc 2000-8 hyd. shovel of jayant project for the period of one year (365days).
Read moreComprehensive annual maintenance contract of magnizest make 8-passenger lift(g plus 2) available in vsrh-2 at tirumala for a period of two years
Comprehensive annual maintenance contract of magnizest make 8-passenger lift(g plus 2) available in vsrh-2 at tirumala for a period of two years
Read moreRepairing of air conditioner system electrical rewiring of cabin 02 nos hoist cylinder repairing and its fitment 02 nos steering cylinder repairing and its fitment and 01 no orbitrol replacement for dumpers sl no 60384 and 60389 make beml model bh60m
Repairing of air conditioner system electrical rewiring of cabin 02 nos hoist cylinder repairing and its fitment 02 nos steering cylinder repairing and its fitment and 01 no orbitrol replacement for dumpers sl no 60384 and 60389 make beml model bh60m
Read moreOffloading the work of annual maintenance contract (amc) for repair and maintenance of air conditioning system fitted in operators cabin of 01 no. cat 834k wheel dozer ( sl no. lwy00737) of krishnashila project for period of 365 days.
Offloading the work of annual maintenance contract (amc) for repair and maintenance of air conditioning system fitted in operators cabin of 01 no. cat 834k wheel dozer ( sl no. lwy00737) of krishnashila project for period of 365 days.
Read moreof your Industry type