Tender Details
Particulars | Details |
---|---|
Title |
1st Class Brick Lining Work Of Main Canal From Km. 0.930 To Km. 0.1.180 At Niyardih Pump Canal Including All Cost Of Material (Excluding Cement And Bricks), Labour, T And P Used Complete In All Respects As Per Drawing Provided By Department.
|
Description |
1st Class Brick Lining Work Of Main Canal From Km. 0.930 To Km. 0.1.180 At Niyardih Pump Canal Including All Cost Of Material (Excluding Cement And Bricks), Labour, T And P Used Complete In All Respects As Per Drawing Provided By Department.
|
Organisation | Government of Uttar Pradesh |
Tender Id | 2023_UPIDM_813646_8 |
Reference Number |
05/EE/MLCD/ VNS /2023-24 |
Tender Fee | 854 |
EMD | 21000 |
Tender Value | |
Place | EXECUTIVE ENGINEER MINOR LIFT CANAL DIVIDION VNS |
Link | https://etender.up.nic.in |
Start Date | June 24, 2023 17:30 |
End Date |
04/07/2023 ( Expired 679 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
First class brick lining work 1 3 cm in mawai minor from chainage 0.725 to 1.075 at kundakala pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as direc
First class brick lining work 1 3 cm in mawai minor from chainage 0.725 to 1.075 at kundakala pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as direc
Read moreRepair and renovation work of main adminstrative building of tubewell division lucknow including all material labour t and p as per specifications of boq
Repair and renovation work of main adminstrative building of tubewell division lucknow including all material labour t and p as per specifications of boq
Read moreBank protection work of river bank right side of barge from 0.00 to 22.50 m at balua pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as directed by e
Bank protection work of river bank right side of barge from 0.00 to 22.50 m at balua pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as directed by e
Read moreStrenthaning of uruwa minor by renovation of old brick lining 1 4 c.m. in between 0.000 km to 0.850 km at reruwa pump canal including all cost of material, (excluding cement and brick ) labour, t and p used, complete in all respect as per drawing p
Strenthaning of uruwa minor by renovation of old brick lining 1 4 c.m. in between 0.000 km to 0.850 km at reruwa pump canal including all cost of material, (excluding cement and brick ) labour, t and p used, complete in all respect as per drawing p
Read moreStrenthaning of main canal by stone boulder piching from 0.400 km to 0.564 km at dhankuwari pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as directed
Strenthaning of main canal by stone boulder piching from 0.400 km to 0.564 km at dhankuwari pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as directed
Read moreStrenthaning of sobandha left minor from 1.570 km to 2.070 km by brick lining work at sogai pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as directed
Strenthaning of sobandha left minor from 1.570 km to 2.070 km by brick lining work at sogai pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as directed
Read moreBank protection work of river bank from 20.00 m to 40.00 m at sogai pump canal including all cost of material (excluding cement ), labour, t and p used complete in all respects as per drawing provided by department. as directed by engineer in charge.
Bank protection work of river bank from 20.00 m to 40.00 m at sogai pump canal including all cost of material (excluding cement ), labour, t and p used complete in all respects as per drawing provided by department. as directed by engineer in charge.
Read moreStrenthaning of main canal by stone boulder piching from 0.250 km to 0.400 km at dhankuwari pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as directed
Strenthaning of main canal by stone boulder piching from 0.250 km to 0.400 km at dhankuwari pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as directed
Read moreConstruction of boundry wall at niyardih ii feeder pump canal including all cost of material (excluding cement), labour, t and p used complete in all respects as per drawing provided by department. as directed by engineer in charge.
Construction of boundry wall at niyardih ii feeder pump canal including all cost of material (excluding cement), labour, t and p used complete in all respects as per drawing provided by department. as directed by engineer in charge.
Read moreProviding and laying aluminium conductor p.v.c. sheathed cable 1100 volts grouting with m.s. clamps of 3.5x630 sqm. size complete in all respects at dhankuwari pump canal including all cost of material as directed by engineer in charge
Providing and laying aluminium conductor p.v.c. sheathed cable 1100 volts grouting with m.s. clamps of 3.5x630 sqm. size complete in all respects at dhankuwari pump canal including all cost of material as directed by engineer in charge
Read moreof your Industry type