Tender Details
Particulars | Details |
---|---|
Title |
Annual Plan Valapad G P 2024 25 Culvert Construction In Gdm Thriprayar Temple Road Ward 2 Pro.No.383/24
|
Description |
Annual Plan Valapad G P 2024 25 Culvert Construction In Gdm Thriprayar Temple Road Ward 2 Pro.No.383/24
|
Organisation | Local Self Government Department | State Govt. and UT |
Tender Id | 2025_LSGD_735626_1 |
Reference Number |
65/2024-25/AE/LID EW/VPD |
Tender Fee | 615 |
EMD | 6943 |
Tender Value | |
Place | Valapad GP, Thalikulum BP, Thrissur |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1178532 |
Start Date | February 08, 2025 15:30 |
End Date |
15/02/2025 ( Expired 93 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of 2l - ps configuration karauli bypass on nh-23 under annual plan 2024-25 on epc mode in the state of rajasthan
Construction of 2l- ps configuration karauli bypass on nh-23 under annual plan 2024-25 on epc mode in the state of rajasthan
Read moreConstruction of vup including approaches near naibag (blackspot id no.ga-(02)-006) at km. 485.345 on nh-66 in the state of goa on epc mode under road safety annual plan 2024-25
Construction of vup including approaches near naibag (blackspot id no.ga-(02)-006) at km. 485.345 on nh-66 in the state of goa on epc mode under road safety annual plan 2024-25
Read moreRepair and rehabilitation of br no. 316/1, 331/1, 332/1, 338/1, 341/1, 354/2, 361/2 on nh 15 under annual plan for the year 2024-25 under pwd under nagaon nh division, nagaon in the state of assam on epc mode.(job no br/15/as/2024-25/284).
Repair and rehabilitation of br no. 316/1, 331/1, 332/1, 338/1, 341/1, 354/2, 361/2 on nh 15 under annual plan for the year 2024-25 under pwd under nagaon nh division, nagaon in the state of assam on epc mode.( job no br/15/as/2024-25/284).
Read moreIn ward 57 meera vihar, drain and c.c. road construction work from ravi to sujan, guddi to bengali babu, rajender to bantu, jhabbi to guddu, sujan singh to pandit ji, rakesh wali gali, from temple to rakesh, from suraj to jabbi.
In ward 57 meera vihar, drain and c.c. road construction work from ravi to sujan, guddi to bengali babu, rajender to bantu, jhabbi to guddu, sujan singh to pandit ji, rakesh wali gali, from temple to rakesh, from suraj to jabbi.
Read moreSub soil investigation, design and construction of 50 mtr span psc box girder bridge on kawlchaw nallah at km 7.980 on k-p-t road on open foundation under 71 rcc/ 24 brtf/ project pushpak in mizoram state(3rd call)
Sub soil investigation, design and construction of 50 mtr span psc box girder bridge on kawlchaw nallah at km 7.980 on k-p-t road on open foundation under 71 rcc/ 24 brtf/ project pushpak in mizoram state(3rd call)
Read moreLaying of 180 meter 250 mm dia rcc sewer hume pipe and construction of 18 manhole chambers, road reinstatement and providing 50 house connections in ward-67 awas vikas from harshveer house to temple
Laying of 180 meter 250 mm dia rcc sewer hume pipe and construction of 18 manhole chambers, road reinstatement and providing 50 house connections in ward-67 awas vikas from harshveer house to temple
Read moreConstruction of rcc drain from km 642.800 to km 643.100 lhs along islampura area in navapur town and construction of rcc drain and box culvert in between pier p-2 and p-3 of rob at km 630.832 for existing nallah on item rate percentage basis.
Construction of rcc drain from km 642.800 to km 643.100 lhs along islampura area in navapur town and construction of rcc drain and box culvert in between pier p-2 and p-3 of rob at km 630.832 for existing nallah on item rate percentage basis.
Read moreIn ward 24, maulanagar, construction work of drain and cc road from mujahids house to aqeels house. in ward 24, maulanagar, construction work of drain and cc road from babu bhais house to wasims house. in ward 24, maulanagar, construction work of dr
In ward 24, maulanagar, construction work of drain and cc road from mujahids house to aqeels house. in ward 24, maulanagar, construction work of drain and cc road from babu bhais house to wasims house. in ward 24, maulanagar, construction work of dr
Read moreWidening re construction to four lane from km 0.000 to km 15.870 near miriyan telangana karnataka border chincholi section of nh 167n in kalaburagi district in the state of karnataka on ham under annual plan 2023 24
Widening re construction to four lane from km 0.000 to km 15.870 near miriyan telangana karnataka border chincholi section of nh 167n in kalaburagi district in the state of karnataka on ham under annual plan 2023 24
Read moreof your Industry type