Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Custom Bid For Services 200141365 Corrosion Mapping Of Water Wall Tubes For Stage I(210 Mw Boiler)
|
| Description |
|
| Organisation | NA | Ministry of Power |
| Tender Id | GEM/2025/B/6210129 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | May 08, 2025 22:13 |
| End Date |
Expired
19/05/2025
Expired 513 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - wt-5253g work contract for conduction of rla (remaining life assessment) of boiler pressure part and corrosion mapping of boiler tubes of 1x500 mw unit at unit no 6, utp..
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - wt-5253g work contract for conduction of rla (remaining life assessment) of boiler pressure part and corrosion mapping of boiler tubes of 1x500 mw unit at unit no 6, utp..
Read moreProcurement of fin welding material for boiler tubes and s.s. plate/rod along with nut-bolt for superheater/reheater coil alignment and boiler expansion indicator assembly for boiler unit-2, 2x600mw, sstpp, stage-i, mppgcl, dongalia.
Procurement of fin welding material for boiler tubes and s.s. plate/rod along with nut-bolt for superheater/reheater coil alignment and boiler expansion indicator assembly for boiler unit-2, 2x600mw, sstpp, stage-i, mppgcl, dongalia.
Read moreSupply of erosion protection shields for ltsh terminal tubes and economizer hanger tubes i unit ii boiler
Supply of erosion protection shields for ltsh terminal tubes and economizer hanger tubes i unit ii boiler
Read moreSupply of erosion protection shields for super heater hanger screen tubes and water wall screen tubes in unit ii boiler
Supply of erosion protection shields for super heater hanger screen tubes and water wall screen tubes in unit ii boiler
Read moreBoiler bed coil pipes for second (02) & third (03) row tubes as per technical specification,boiler bed coil pipes for first (01) & fourth (04) row tubes as per technical specification
Boiler bed coil pipes for second (02) & third (03) row tubes as per technical specification,boiler bed coil pipes for first (01) & fourth (04) row tubes as per technical specification
Read moreProcurement of coal nozzle tips for boiler stage i (3x660mw) under
Procurement of coal nozzle tips for boiler stage i (3x660mw) undercapital budget 2026 27
Read moreKtps-v stage- bm- provide skilled labor, specifically ibr welders and grinders, to replace the boiler tubes in unit-x of the ktps-v stage during the annual overhaul period for the year 2026-27-reg
Ktps-v stage- bm- provide skilled labor, specifically ibr welders and grinders, to replace the boiler tubes in unit-x of the ktps-v stage during the annual overhaul period for the year 2026-27-reg
Read moreof your Industry type