Tender Details
Particulars | Details |
---|---|
Title |
Dismantling, Erection And Fabrication Of Motor And Gearbox Base Structure And Its Platform And Fitting After Modification And Mounting Of Unit No. 68 Crusher At Secondary Crusher And Dismantling, Erection And Fabrication Of Head Drum Motor And Gear
|
Description |
Dismantling, Erection And Fabrication Of Motor And Gearbox Base Structure And Its Platform And Fitting After Modification And Mounting Of Unit No. 68 Crusher At Secondary Crusher And Dismantling, Erection And Fabrication Of Head Drum Motor And Gear
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_CCL_312465_1 |
Reference Number |
PO/KTW/EnM/eTen/24-25/44 Dated-12.07.2024 |
Tender Fee | 0 |
EMD | 4000 |
Tender Value | |
Place | Kathara Washery |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=323813 |
Start Date | July 13, 2024 16:30 |
End Date |
23/07/2024 ( Expired 321 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Erection commissioning and changing the instruments of turbine panel at tg floor 9 mtrs including fabrication fixing of instruments tags during overhauling of unit no 13
Erection commissioning and changing the instruments of turbine panel at tg floor 9 mtrs including fabrication fixing of instruments tags during overhauling of unit no 13 btps obra
Read moreErection, dismantling and modification of 6.6k.v h.t over head line at kulda ocp, basundhara area
Erection, dismantling and modification of 6.6k.v h.t over head line at kulda ocp, basundhara area
Read more(a) dismantling of drum and equalization pinion with guard and refitting of drum after changing of f/b no.4 (b) repairing and reassembling of broken chain conveyor of f/b no-4 and (c) replacement of defective motor of f/b no-5 of amp colliery.
(a) dismantling of drum and equalization pinion with guard and refitting of drum after changing of f/b no.4 (b) repairing and reassembling of broken chain conveyor of f/b no-4 and (c) replacement of defective motor of f/b no-5 of amp colliery.
Read moreErection, commissioning and testing of 3 ton hoist and its rail beam steal structure at cooling tower of unit no.7 of 2x500 mw dtps anpara
Erection, commissioning and testing of 3 ton hoist and its rail beam steal structure at cooling tower of unit no.7 of 2x500 mw dtps anpara
Read moreFabrication and erection of steel structure base frame and installation of fog cannon upon the structure base at different locations in mines and maintenance work of wheel washing and instant er system at balram ocp, hingula area.
Fabrication and erection of steel structure base frame and installation of fog cannon upon the structure base at different locations in mines and maintenance work of wheel washing and instant er system at balram ocp, hingula area.
Read more(1) making of 04 nos. of motor dala end cover and 04 nos.bearing grease cap of at akwmc for 150hp and 167 hp.(2) fabrication of base plate h.t pump motor to be installed at ocp pump.(3) dismantling of 3000 gpm pump flow more an
(1) making of 04 nos. of 
 motor dala end cover and 
 04 nos.bearing grease cap 
 of at akwmc for 150hp and 
 167 hp.(2) fabrication of 
 base plate h.t pump motor 
 to be installed at ocp 
 pump.(3) dismantling of 
 3000 gpm pump flow more an
Read moreDismantling, fabrication and erection of pipelines in causticizer at srp - mechanical in tnpl unit - 1.
Dismantling, fabrication and erection of pipelines in causticizer at srp - mechanical in tnpl unit - 1.&#x0d
Read moreWork contract for replacement of 220kv lighting arrestors along with modification on existing structure installed at unit no. 1 to 4, ph-i and ph-ii, 210mw, at sgtps, mppgcl, birsinghpur.
Work contract for replacement of 220kv lighting arrestors along with modification on existing structure installed at unit no. 1 to 4, ph-i and ph-ii, 210mw, at sgtps, mppgcl, birsinghpur.
Read moreDismantling, fabrication and erection of pipelines at srp - mechanical in tnpl unit - 1.
Dismantling, fabrication and erection of pipelines at srp - mechanical in tnpl unit - 1.&#x0d
Read moreRepairing , replacement and maintenance of drive unit , driven drum structure , side plates carrying rollers and rollers of conveyor gathering belt no. 1 of preparation plant at bhojudih coal washery.
Repairing , replacement and maintenance of drive unit , driven drum structure , side plates carrying rollers and rollers of conveyor gathering belt no. 1 of preparation plant at bhojudih coal washery.