Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Dismantling Of Amd347 40 Mtr Nblw Tower With Foundation And Reflling Upto Ground Level At Saragwada Dholka, Ahmedabad
|
| Description |
Dismantling Of Amd347 40 Mtr Nblw Tower With Foundation And Reflling Upto Ground Level At Saragwada Dholka, Ahmedabad
|
| Organisation | Bharat Sanchar Nigam Limited (Govt of India Enterprise) | Public Sector Undertakings |
| Tender Id | 2025_BSNL_234968_1 |
|
Reference Number |
14 /BSNL/CD/AHD/2025-26 Dated 09.05.2025 |
| Tender Fee | 590 |
| EMD | 4810 |
| Tender Value | - |
| Place | Saragwada Ahmedabad |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=266292 |
| Start Date | May 09, 2025 22:30 |
| End Date |
Expired
14/05/2025
Expired 519 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of tower foundation bts platform erection of 40m tower nblw nbfl make at vaious locations aprox 16 nos for kumbh mela at nashik 2027 2nd call
Construction of tower foundation bts platform erection of 40m tower nblw nbfl make at vaious locations aprox 16 nos for kumbh mela at nashik 2027 2nd call
Read moreDismantling, transportation, design and construction of foundation, erection of 45 m high self-supporting lattice steel tower at akashvani mahabubnagar as per specification
Dismantling, transportation, design and construction of foundation, erection of 45 m high self-supporting lattice steel tower at akashvani mahabubnagar as per specification
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read moreEarth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Read moreDismantling of 40 mtr nblw tower and bts shelter along with foundation and reflling upto ground level at saraswati society, dholka, ahmedabad
Dismantling of 40 mtr nblw tower and bts shelter along with foundation and reflling upto ground level at saraswati society, dholka, ahmedabad
Read moreDismantling of 40 mtr nblw tower with foundation and reflling upto ground level at alampur, barwala, ahmedabad
Dismantling of 40 mtr nblw tower with foundation and reflling upto ground level at alampur, barwala, ahmedabad
Read moreDismantling of 40 mtr nblw tower and bts shelter along with foundation and reflling upto ground level at gangad, bavla, ahmedabad
Dismantling of 40 mtr nblw tower and bts shelter along with foundation and reflling upto ground level at gangad, bavla, ahmedabad
Read moreDismantling of amd325- 40 mtr nblw tower with foundation and refilling upto ground level at paldi kankaj, daskroi, ahmedabad
Dismantling of amd325- 40 mtr nblw tower with foundation and refilling upto ground level at paldi kankaj, daskroi, ahmedabad
Read moreDismantling of 40 mtr nblw tower and bts shelter along with foundation at asarwa bethak ahmedabad
Dismantling of 40 mtr nblw tower and bts shelter along with foundation at asarwa bethak ahmedabad
Read moreDismantling and transportation of 40m nblw tower and demolishing its foundation at shigaon dist sangli
Dismantling and transportation of 40m nblw tower and demolishing its foundation at shigaon dist sangli
Read moreof your Industry type