Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
12 Inch Ms Bend End Flanged,12 Inch 90 Degree Bend,Ms Seamless 14 Inch 90 Degree Bend With Flange,M
|
Description |
|
Organisation | Materials Management | Ministry of Coal |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link |
AAAAAAAAAA Login to view |
Start Date | July 03, 2025 21:34 |
End Date |
24/07/2025 ( 20 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
1000mm long flexible hose connection with both end suitable for dia.12 ss tube 299bar,2000mm long f
Read more
12 inch ms bend end flanged,12 inch 90 degree bend,ms seamless 14 inch 90 degree bend with flange,m
Read more
Drill machine with multi bit,star screw driver big 12 inch,flate screw driver 12 inch,double end sc
Read more
14 inch optical telescope with equatorial mount,ccd camera,filter set,electronic focuser,roll-of-th
Read more
Selection of agency to build-operate transfer of 12 kld faecal sludge treatment plant fstp based on planted drying bed technology along with operations and maintenance o and m for 5 years defect liability period for 2 years under rangkang gp of amar
Selection of agency to build-operate transfer of 12 kld faecal sludge treatment plant fstp based on planted drying bed technology along with operations and maintenance o and m for 5 years defect liability period for 2 years under rangkang gp of amar
Read more“ m. s. tube black(light) erw or hfiw 8mm bore as per is 1239 part-2-2011 with both end thread”
Read more
Ms wire nail with chequered head of size 1 inch length,ms wire nail with chequered head of size 3 i
Read more
Con of valley gutter godown no 12, 13, 14 and 15 into single span alongwith replacement of ac sheet roofing of godown no 11 with profile sheet roofing at fsd mokama
Con of valley gutter godown no 12, 13, 14 and 15 into single span alongwith replacement of ac sheet roofing of godown no 11 with profile sheet roofing at fsd mokama
Read moreFace recognition biometric machine,software charges,machine box weather proof,pc with 32 inch led,m
Read more
(nib_06) work of augumentation of bulk water supply system with construction and commissioning of rgf for 12 villages of guda endala section under mla constituency sumerpur including 5 year o and m after 1 year defect liability period under budget
(nib_06) work of augumentation of bulk water supply system with construction and commissioning of rgf for 12 villages of guda endala section under mla constituency sumerpur including 5 year o and m after 1 year defect liability period under budget
Read moreof your Industry type