Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Special Repair Of Primary Runway (19 L/01 R) Along With Portion Of Secondary Runway (19 R/01 L) At Junction Of Rwy 19 R/01 L With Txy B And Txy E At Nscbi Airport, Kolkata
|
| Description |
Special Repair Of Primary Runway (19 L/01 R) Along With Portion Of Secondary Runway (19 R/01 L) At Junction Of Rwy 19 R/01 L With Txy B And Txy E At Nscbi Airport, Kolkata.19 R/01 L At Junction Of Rwy 19 R/ 01 L With Txy B And Txy E
|
| Organisation | Airports Authority of India | Public Sector Undertakings |
| Tender Id | 2025_AAI_234314_1 |
|
Reference Number |
AAI/KOL/Spl. Repair RWY/2025 |
| Tender Fee | 3540 |
| EMD | 62.47 Lakh |
| Tender Value | - |
| Place | Kolkata |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=265452 |
| Start Date | June 10, 2025 21:00 |
| End Date |
Expired
12/07/2025
Expired 458 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Resurfacing of primary runway at nscbi airport, kolkata. sh - civil and electrical works.
Resurfacing of primary runway at nscbi airport, kolkata. sh - civil and electrical works.
Read moreConstruction of perimeter road along the newly constructed/ extended runway towards rwy 22 end at birsi airport, gondia
Construction of perimeter road along the newly constructed/ extended runway towards rwy 22 end at birsi airport, gondia.
Read moreConstruction of perimeter road along the newly constructed/ extended runway towards rwy 22 end at birsi airport, gondia.
Construction of perimeter road along the newly constructed/ perimeter road rwy 22 side
Read moreReconstruction of rigid portion of secondary runway, k and a taxiway and strengthening of c taxiway at nscbi airport, kolkata. sh- provision of agl fittings and associated works
Reconstruction of rigid portion of secondary runway, k and a taxiway and strengthening of c taxiway at nscbi airport, kolkata. sh- provision of agl fittings and associated works
Read moreResurfacing of portion of rwy on 05/23 side and providing connecting roads to met installations at rajahmundry airport
S.h1-resurfacing of portion of rwy on 05-23 side and s.h2- providing connecting roads to met installations at rajahmundry airport
Read moreReconstruction of rigid portions of secondary runway, k and a taxiway and strengthening of c taxiway at nscbi airport kolkata
Reconstruction of rigid portions of secondary runway, k and a taxiway and strengthening of c taxiway at nscbi airport kolkata
Read moreResurfacing of damaged portion of runway between chainage from 2286m to 2610m at vijayawada airport
Resurfacing of damaged portion
 of runway between chainage from 2286m to 2610m at vijayawada airport
Read moreS.h 1 resurfacing of portion of rwy on 05-23 side and s.h 2 providing connecting roads to met installations at rajahmundry airport
S.h 1 resurfacing of portion of rwy on 05-23 side and s.h 2 providing connecting roads to met installations at rajahmundry airport
Read moreR and m of rwy, twy and aprons at nscbi airport, kol sh- misc civil work for rigid and flexible pavements like paint marking in airside pavement area, joint filling, patch repair, bituminous work, leveling grading on strips of rwy and twy for 2 years
R and m of rwy, twy and aprons at nscbi airport, kol sh- misc civil work for rigid and flexible pavements like paint marking in airside pavement area, joint filling, patch repair, bituminous work, leveling grading on strips of rwy and twy for 2 years
Read moreCommissioning of extended portion of runway at birsi airport, gondia. sh- installation of papi and gp civil works
Civil works for installation of papi and gp
Read moreof your Industry type