Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Fob With Ramp At Ch 566.840 On Teleibani Sambalpur Of Nh 53 In The State Of Odisha 2nd Call
|
| Description |
Construction Of Fob With Ramp At Ch 566.840 On Teleibani Sambalpur Of Nh 53 In The State Of Odisha On Epc Mode 2nd Call
|
| Organisation | National Highways Authority of India | RO-Bhubaneswar - NHAI |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | 20000 |
| EMD | 1.92 Lakh |
| Tender Value | 1.92 Crore |
| Place | |
| Link | Login to view |
| Start Date | October 09, 2026 23:30 |
| End Date |
Open
21/10/2026
6 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of grade separators at sarona chowk (ch. 279.750) udyog bhawan (ch. 269.000) telibandha chowk (ch. 268.000) and agrasen chowk (265.500) in raipur city portion of nh-53 at raipur-aurang section in chhattisgarh .
Construction of grade separators at sarona chowk (ch. 279.750) udyog bhawan (ch. 269.000) telibandha chowk (ch. 268.000) and agrasen chowk (265.500) in raipur city portion of nh-53 at raipur-aurang section in chhattisgarh .
Read moreConstruction of service road from ch 312.750 to 314.800 lhs and from ch 313.000 to 314.800 rhs near urla village on existing durg bypass nh-53 (old nh-06) in the state of chhattisgarh on engineering procurement and construction (epc) mode.
Construction of service road from ch 312.750 to 314.800 lhs and from ch 313.000 to 314.800 rhs near urla village on existing durg bypass nh-53 (old nh-06) in the state of chhattisgarh on engineering procurement and construction (epc) mode.
Read moreExecution of balance short term maintenance contract works on nh-110 from km 0.000 darjeeling more to km 43.000 giddha pahar, including deployment of machinery and incident management, in darjeeling district, west bengal.
Read moreProvision of 6.1m wide new fob with ramp at phaphund (phd) station and replacement of old fob by 6.10m wide new fob at bharthana (bnt) station for recoupment of divyangjan facility between cnb-tdl section of prayagraj division.
Provision of 6.1m wide new fob with ramp at phaphund (phd) station and replacement of old fob by 6.10m wide new fob at bharthana (bnt) station for recoupment of divyangjan facility between cnb-tdl section of prayagraj division.
Read moreJabalpur division:- proposed ramp on existing fob at bikrampur (bmr) and ghatpindrai (gpc) stations under assitant divisional engineer narsinghpur.
Jabalpur division:- proposed ramp on existing fob at bikrampur (bmr) and ghatpindrai (gpc) stations under assitant divisional engineer narsinghpur.
Read moreProvision of 3.0m wide fob at bhme & amlo with stair & ramp in the jurisdiction of sr. den/3/dhn.
Provision of 3.0m wide fob at bhme & amlo with stair & ramp in the jurisdiction of sr. den/3/dhn.
Read moreExecution of pothole rectification/filling works of nh 53 at the risk n cost of the epc contractor of duburi chandikhole of nh 53 in the state of odisha
Execution of pothole rectification/filling works of nh 53 at the risk n cost of the epc contractor of duburi chandikhole of nh 53 in the state of odisha
Read moreJabalpur division:- proposed ramp on existing fob at gurra (gro), guramkhedi (gmd), bagratawa (bgta) stations under assistant divisional engineer pipariya.
Jabalpur division:- proposed ramp on existing fob at gurra (gro), guramkhedi (gmd), bagratawa (bgta) stations under assistant divisional engineer pipariya.
Read more-urgent repair of damaged canal lining and bed to prevent leakage between ch 7450m-7550m and repair of ramp at ch 7550m
Urgent repair of damaged canal lining and bed to prevent leakage
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg2 from km7.926-km18.560 (tl 26.039km mcw fob loop ramp) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg2 from km7.926-km18.560 (tl 26.039km mcw fob loop ramp) in up on ham
Read moreof your Industry type