Tender Details
Particulars | Details |
---|---|
Title |
Drivage In Floor To Making Uniform Grant In Soft Stone From 47 D To 48 Ad Along Minus 3 L For Muv Route In Rv Seam At Mic Unit Of Jhanjra Project Colliery
|
Description |
Drivage In Floor To Making Uniform Grant In Soft Stone From 47 D To 48 Ad Along Minus 3 L For Muv Route In Rv Seam At Mic Unit Of Jhanjra Project Colliery
|
Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_ECL_319252_1 |
Reference Number |
ECL/GM/JNR/MIN.A/24-25/25 Dt. 15.10.2024 |
Tender Fee | 0 |
EMD | 21900 |
Tender Value | |
Place | Jhanjra Project Colliery |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=330901 |
Start Date | October 18, 2024 16:30 |
End Date |
28/10/2024 ( Expired 175 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
1)watering and maintaining the plants, lawns in front of control room, guest house along the peripheral road and approach road etc., at 400/220 kv dindi ss for the period from 01.05.2025 to 31.03.2026 and 2) cleaning maintenance of control room ,ground floor office rooms, dg room, guest house, bath rooms, water closets and all drains etc., in the premises of 400/220 kv dindi ss for the period from 01.05.2025 to 31.03.2026.
1)watering and maintaining the plants, lawns in front of control room, guest house along the peripheral road and approach road etc., at 400/220 kv dindi ss for the period from 01.05.2025 to 31.03.2026 and 2) cleaning and maintenance of control room ,ground floor office rooms, dg room, guest house, bath rooms, water closets and all drains etc., in the premises of 400/220 kv dindi ss for the period from 01.05.2025 to 31.03.2026.
Read moreEstablishment of drainage system along 19xd and 20xd in rvii seam at 3 and 4 incline unit of jhanjra project colliery
Establishment of drainage system along 19xd and 20xd in rvii seam at 3 and 4 incline unit of jhanjra project colliery
Read moreCleaning of pit bottom sump at no 4 pit in dobrana rv seam to increase the sump capacity for monsoon preparation 2025-2026 of lower kenda colliery under kenda area ecl
Cleaning of pit bottom sump at no 4 pit in dobrana rv seam to increase the sump capacity for monsoon preparation 2025-2026 of lower kenda colliery under kenda area ecl
Read moreMaking of drain along main riding from -46l to -32l/14r fo drainage of water towards -32l sump in 4a seam at jhiria ug mine.
Making of drain along main riding from -46l to -32l/14r fo drainage of water towards -32l sump in 4a seam at jhiria ug mine.
Read moreStabilizing of floor of drift by rcc work on the drift floor from 55re/44 1/2 le seam iv(m) to 47lw/52re seam v for marching of cm and movement of muv at saoner mine no.1 of saoner sub area of nagpur area.
Stabilizing of floor of drift by rcc work on the drift floor from 55re/44 1/2 le seam iv(m) to 47lw/52re seam v for marching of cm and movement of muv at saoner mine no.1 of saoner sub area of nagpur area.
Read moreMaking of the permanent drain at haulage roadway (1 dip) from 45l to 54l in borachak seam(r-vi) at dhemomain incline colliery
Making of the permanent drain at haulage roadway (1 dip) from 45l to 54l in borachak seam(r-vi) at dhemomain incline colliery
Read moreMaking a pump setting in b.p. top seam for standing of pump during operation to avoid any accident at badjna colliery.
Making a pump setting in b.p. top seam for standing of pump during operation to avoid any accident at badjna colliery.
Read moreRail track packing with morum / debris along main dip from 5l to 20l in 29 incline in kalimati seam at badjna colliery.
Rail track packing with morum / debris along main dip from 5l to 20l in 29 incline in kalimati seam at badjna colliery.
Read moreDrivage along stone floor and shelly coal roof for cm marching route in rvi seam at mic of jhanjra project colliery
Drivage along stone floor and shelly coal roof for cm marching route in rvi seam at mic of jhanjra project colliery
Read moreDrivage in stone roof along minus 2 level from 39 dip to 42 dip of rvi seam at mic of jhanjra project colliery
Drivage in stone roof along minus 2 level from 39 dip to 42 dip of rvi seam at mic of jhanjra project colliery
Read moreof your Industry type