Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of 20 M Span Steel Plate Girder Motor Bridge At Km 23 Of Pipla Teka Motor Road Under District Plan.
|
| Description |
Construction Of 20 M Span Steel Plate Girder Motor Bridge At Km 23 Of Pipla Teka Motor Road Under District Plan.
|
| Organisation | Government of Uttarkhand |
| Tender Id | 2023_pwd_60884_1 |
|
Reference Number |
1362/35AG date 14-07-2023 |
| Tender Fee | 4720 |
| EMD | 1.42 Lakh |
| Tender Value | - |
| Place | EE PD PWD PAURI |
| Link |
View Original Tender Notice
https://uktenders.gov.in |
| Start Date | July 15, 2023 22:30 |
| End Date |
Expired
27/07/2023
Expired 1176 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Providing consultancy services 1x50 mtrs span steel truss girder bridge over nallah qazinag at tadd
Providing consultancy services 1x50 mtrs span steel truss girder bridge over nallah qazinag at tadd
Read moreConstruction of 71m span 2-lane motor bridge at km7, 30m span 2-lane motor bridge at km9 and 40m span 2-lane motor bridge at km9 of khatima melaghat banmohaliya motor road (sh-107) in district u.s. nagar under epc mode.
Construction of 71m span 2-lane motor bridge at km7, 30m span 2-lane motor bridge at km9 and 40m span 2-lane motor bridge at km9 of khatima melaghat banmohaliya motor road (sh-107) in district u.s. nagar under epc mode.
Read moreConsultancy service construction of 1x50 mtr span steel truss girder bridge over nallah qazinag at tad
Consultancy service construction of 1x50 mtr span steel truss girder bridge over nallah qazinag at tad
Read moreConstruction of a 2 cell grade separated structure with 20m span
Construction of a 2 cell grade separated structure with 20m span each at amila village on nh 29 as a long term road safety measure on epc mode for the package of 4laning of varanasi gorakhpur section of nh-29
Read moreC/o 20m bailey bridge over hutulu river
Fc, rcc slab culvert pucca side drain, earthen side drain r b wall sub grade preparation shoulder setting out road furniture gsb, ctb, prime coat, mss etc
Read moreConstruction of total five no. 2-lane class-a loading motor bridges of span 36m, 20m, 25m, 18m and 20m on various kms of khutani bhawali dhanachuli dhunaghat champawat manch tamli motor road (sh-64) in distt. champawat under epc mode.
Construction of total five no. 2-lane class-a loading motor bridges of span 36m, 20m, 25m, 18m and 20m on various kms of khutani bhawali dhanachuli dhunaghat champawat manch tamli motor road (sh-64) in distt. champawat under epc mode.
Read moreProvision of side pathway on underslung girder bridges of 30.5 metre span of bridge no. 343 up (span 1 to 20) between lae-thv sections under the jurisdiction of sse/bridge/titilagarh of sambalpur division.
Provision of side pathway on underslung girder bridges of 30.5 metre span of bridge no. 343 up (span 1 to 20) between lae-thv sections under the jurisdiction of sse/bridge/titilagarh of sambalpur division.
Read moreConstruction of 2-lane class-a loading motor bridges of span 42m and 36m and 1.5-lane class-a loading motor bridges of span 20m and 24m on various kms of lambgaon motana rajakhet ghansali sendul motor road (sh-69) in district tehri garhwal (epc)
Construction of 2-lane class-a loading motor bridges of span 42m and 36m and 1.5-lane class-a loading motor bridges of span 20m and 24m on various kms of lambgaon motana rajakhet ghansali sendul motor road (sh-69) in district tehri garhwal (epc)
Read moreConstruction of 15m span 2-lane class-a loading motor bridge at km-2 and 125m span 2-lane class-a loading motor bridge at km-6 of khatima melaghat banmohaliya motor road (sh-107) in district u.s. nagar. under epc mode.
Construction of 15m span 2-lane class-a loading motor bridge at km-2 and 125m span 2-lane class-a loading motor bridge at km-6 of khatima melaghat banmohaliya motor road (sh-107) in district u.s. nagar. under epc mode.
Read moreTrial assembly & dismantling of 01 span of 61.0m (th) welded open web girder & 01 span of 76.2m (th) welded open web girder (non-standard) at engineering workshop, kaligam, sabarmati.
Trial assembly & dismantling of 01 span of 61.0m (th) welded open web girder & 01 span of 76.2m (th) welded open web girder (non-standard) at engineering workshop, kaligam, sabarmati.
Read moreof your Industry type