Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Btp Laying Of Trench Line And Shifting Of Telemetry From Right Bank To Left Bank At Site Basantpur Under Mmsdi Cwc Raipur
|
Description |
Construction Of Btp Laying Of Trench Line And Shifting Of Telemetry From Right Bank To Left Bank At Site Basantpur Under Mmsdi Cwc Raipur
|
Organisation | Central Water Commission | Central Govt. Ministry/Department |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | Mahanadi Division Doctors colony CWC Burla |
Link |
AAAAAAAAAA Login to view |
Start Date | May 06, 2025 22:30 |
End Date |
19/05/2025 ( 8 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreChambal alwar bharatpur water supply project package 2 based on hybrid annuity model ace(p) bharatpur nit no. 05 / 2024-25
Work of construction of intermediate cwph at kotra baseri laying of clear water transmission main from kotra to naroli nadbai via junction 2 at naroli ips nadbai nagar ramgarh kishangarhbas tijara jairoli and bhiwadi based on ham model under jjm
Read moreConstruction of fob at km.61.800 (village lalpur), at km.225.500 at km. 284.340 (village aram sarai), high mast at km. 61.680 and drain from km. 61.400 to km. 61.960 (bhs) on ghaziabad aligarh mainpuri section of nh-34 in the state of up on epc mode
Construction of fob at km.61.800 (village lalpur), at km.225.500 at km. 284.340 (village aram sarai), high mast at km. 61.680 and drain from km. 61.400 to km. 61.960 (bhs) on ghaziabad aligarh mainpuri section of nh-34 in the state of up on epc mode
Read more85925 spl repairs to bldg no. t-43 at alc and single offrs accn bldg no. np-20 at aicts pune and provn of area drainage from bldg no. np-94 to np-113 at aicts under ge (south) pune
85925 spl repairs to bldg no. t-43 at alc and single offrs accn bldg no. np-20 at aicts pune and provn of area drainage from bldg no. np-94 to np-113 at aicts under ge (south) pune
Read moreLaying of tower foundations, erection of towers, stringing and sagging of conductor for 220 kv d/c line from 400 kv s/s pgcil patiala to 220 kv s/s bhadson (to be upgraded from 66 kv s/s).
Laying of tower foundations, erection of towers, stringing and sagging of conductor for 220 kv d/c line from 400 kv s/s pgcil patiala to 220 kv s/s bhadson (to be upgraded from 66 kv s/s).
Read moreConstruction of distribution system for 5177.98 ha. of cca including command area development (cad) of salandi left main canal from rd 59.970 km to 60.304 km through under ground pipe line irrigation system (gravity flow) of anandapur barrage project
Construction of distribution system&#x0d for 5177.98 ha. of cca including&#x0d command area development (cad)&#x0d of salandi left main canal from rd&#x0d 59.970 km to 60.304 km through&#x0d under ground pipe line irrigation&#x0d system (gravity flow) of abp
Read moreConstruction of rcc drain
Construction of rcc drain from rais bhai house to palan house and manoj manjhi house to mohan manjhi house at ward 15
Read moreConstruction of rcc drain
Construction of rcc drain from anokhelal house to prem narayan house to braj ahirwar and daramdas ahirwar house to mukesh ahirwar house at ward 14
Read moreConstruction of rcc drain and cc road
Construction of rcc drain and cc road from soni ji house to chandrashekhar sharma house to ajaykant bhargav house at ward 09
Read moreof your Industry type