Tender Details

Particulars Details
Title
Property Development On 21257 Sqm (Far) Land Plot Adjacent To Azadpur Metro Station Of Line 2.
Description
Property Development On 21257 Sqm (Far) Land Plot Adjacent To Azadpur Metro Station Of Line 2.
Organisation Delhi Metro Rail Corporation Limited | Central Govt. Ministry/Department
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 23600
EMD 59 Lakh
Tender Value
Place Delhi
Link

AAAAAAAAAA

Login to view
Start Date March 25, 2025 16:30
End Date

22/04/2025 ( 0 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Read more
Expression of interest for inviting investors for development and operations of mixed-use development on reclaimed land at tawi riverfront

Expression of interest for inviting investors for development and operations of mixed-use development on reclaimed land at tawi riverfront

Read more
Consultancy services of ae for construction of 6-lane patna ring road highway nh-131g from kanhauli to sherpur from km.0.000-km8.480 including junction development with bihta-danapur elevated corridor app.length-1.5 km on epc mode in bihar l-9.98km

Consultancy services of ae for construction of 6-lane patna ring road highway nh-131g from kanhauli to sherpur from km.0.000-km8.480 including junction development with bihta-danapur elevated corridor app.length-1.5 km on epc mode in bihar l-9.98km

Read more
Consultancy services for preparation of dpr and land acquisition of bhokar city bypass road on nh61 connecting to nh161a km 0.00 to km 5.00 in bhokar taluka district nanded in the state of maharashtra on epc mode length 5.00 km

Consultancy services for preparation of dpr and land acquisition of bhokar city bypass road on nh61 connecting to nh161a km 0.00 to km 5.00 in bhokar taluka district nanded in the state of maharashtra on epc mode length 5.00 km

Read more
Allotment of land on long term lease of 10 years on as is where is basis in zone z- 2 plot 108 m2 0.03 acres in modern fish market area at fishing harbour area for installation of signal tower under commercial category

Allotment of land on long term lease of 10 years on as is where is basis in zone z- 2 plot 108 m2 0.03 acres in modern fish market area at fishing harbour area for installation of signal tower under commercial category

Read more
Upgradation strengthening of 2-4 lane carriageway to 4-lane divided carriageway from ch.132.320 in dhamasiya village in naswade taluka to ch.161.000 in jitnagar village in nandod taluka (l 28.680 km) section of nh-56 in gujarat on ham (pkg-iv(a)

Upgradation strengthening of 2-4 lane carriageway to 4-lane divided carriageway from ch.132.320 in dhamasiya village in naswade taluka to ch.161.000 in jitnagar village in nandod taluka (l 28.680 km) section of nh-56 in gujarat on ham (pkg-iv(a)

Read more
Upgradation strengthening of 2-4 lane carriageway to 4-lane divided carriageway from ch.161.000 in jitnagar village in nandod taluka to ch.179.780 in bitada-movi village in netrang taluka (l 18.780 km) section of nh-56 in gujarat on ham (pkg-iv)(b)

Upgradation strengthening of 2-4 lane carriageway to 4-lane divided carriageway from ch.161.000 in jitnagar village in nandod taluka to ch.179.780 in bitada-movi village in netrang taluka (l 18.780 km) section of nh-56 in gujarat on ham (pkg-iv)(b)

Read more
Construction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)

Construction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)

Read more
Independent engineer services for development, operations and maintenance of ropeway from sonprayag to kedarnath in the state of uttarakhand on dbfot mode

Independent engineer services for development, operations and maintenance of ropeway from sonprayag to kedarnath in the state of uttarakhand on dbfot mode

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise