Tender Details
About Tender
🏗️ Opportunity For Entrepreneurs: Auction Of Newly Constructed Shop At C Mo, Nagpur 🏪🔑 The Directorate Of Urban Administration And Development, Under The State Government And Union Territories, Is Conducting An Auction For The Newly Constructed Shop No. 06, Situated Above Existing Constructed Shops Adjacent To The Municipal Boundary At C Mo, Nagpur. 📅 Auction Date: July 15, 2024, 5:30 Pm Interested Bidders Must Submit An Earnest Money Deposit (Emd) Of Inr 100,000/ Along With The Tender Fee Of Inr 2,295/ To Participate In The Auction. This Is A Unique Opportunity For Entrepreneurs Looking To Establish Their Business In A Prime Location. Detailed Terms And Conditions, Along With Eligibility Criteria, Are Available For Review. Keywords: Auction, Newly Constructed Shop, C Mo Nagpur, Urban Administration And Development, State Govt. And Ut, Emd, Tender FeeParticulars | Details |
---|---|
Title |
Complete Installation Of Cabin And Body On Truck Chasis As Per Specification
|
Description |
Complete Installation Of Cabin And Body On Truck Chasis As Per Specification Mentioned In Tender &Amp#X0d
Installation Will Include Both Material And Labor Costs.
|
Organisation | MP Forest Department | State Govt. and UT |
Tender Id | 2024_UAD_350836_1 |
Reference Number |
1183 |
Tender Fee | 1295 |
EMD | 50000 |
Tender Value | |
Place | Dindori |
Link | https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=495473 |
Start Date | May 02, 2025 20:30 |
End Date |
21/05/2025 ( Expired 15 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Procurement of spares and complete assembly for sleeve coupling for dry ash lines ntpc unchahar
Procurement of spares and complete assembly for sleeve coupling for dry ash lines ntpc unchahar
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreLeasing of land for installation of a modern fueling station and allied facilities on malabar cements ltd (mcl) owned land at mcl cgu unit, pallipuram, cherthala, alapuzha district
Leasing of land for installation of a modern fueling station and allied facilities on malabar cements ltd (mcl) owned land at mcl cgu unit, pallipuram, cherthala, alapuzha district
Read moreDesign, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Read moreEoi for empanelment of accommodation partner for association to provide online accommodation inventory for sales on irctc tourism website and its associate porta
Eoi for empanelment of accommodation partner for association to provide online accommodation inventory for sales on irctc tourism website and its associate porta
Read moreConstruction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Read moreCs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Read moreof your Industry type