Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Up Keeping And Care Taking For 8 Months Of Round The Clock (24 Hours) At Camping House Sidhi.
|
| Description |
Up Keeping And Care Taking For 8 Months Of Round The Clock (24 Hours) At Camping House Sidhi.
|
| Organisation | Madhya Pradesh Poorv Kshetra Vidyut Vitaran Company Limited | State Govt. and UT |
| Tender Id | 2025_PKVVC_437794_1 |
|
Reference Number |
Civil-317 |
| Tender Fee | 885 |
| EMD | 2539 |
| Tender Value | - |
| Place | Sidhi |
| Link |
View Original Tender Notice
https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=515745 |
| Start Date | July 16, 2025 23:00 |
| End Date |
Expired
28/07/2025
Expired 440 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Hiring of back hoe loader with 0.26 cu.m excavating bucket at rear and 1.1 cu.m loader bucket at front for lifting of shale, stone and any other foreign material collected at oc3 chp, rg2 with 8 hours availability per day for 8640 hours or 36 months, whichever is earlier.
Hiring of back hoe loader with 0.26 cu.m excavating bucket at rear and 1.1 cu.m loader bucket at front for lifting of shale, stone and any other foreign material collected at oc3 chp, rg2 with 8 hours availability per day for 8640 hours or 36 months, whichever is earlier.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreUp keeping and care taking for 10 months of round the clock (24 hours) at camping house sidhi.
Up keeping and care taking for 10 months of round the clock (24 hours) at camping house sidhi.
Read moreUp keeping and care taking for 10 months of round the clock (24 hours) at camping house rewa.
Up keeping and care taking for 10 months of round the clock (24 hours) at camping house rewa.
Read moreUp keeping and care taking for 11 months of round the clock (24 hours) at camping house maihar.
Up keeping and care taking for 11 months of round the clock (24 hours) at camping house maihar.
Read moreUp keeping and care taking for 8 months of round the clock (24 hours) at camping house maihar.
Up keeping and care taking for 8 months of round the clock (24 hours) at camping house maihar.
Read moreYearly upkiiping and care taking of camping house godhar colony round the clock (24 hours) sidhi distt sidhi
Yearly upkiiping and care taking of camping house godhar colony round the clock (24 hours) sidhi distt sidhi
Read moreUp keeping and care taking for 8 months of round the clock (24 hours) at camping house,godhar colony rewa.
Up keeping and care taking for 8 months of round the clock (24 hours) at camping house,godhar colony rewa.
Read moreUp keeping and care taking for 12 months of round the clock (24 hours) at camping house prem nagar colony satna.
Up keeping and care taking for 12 months of round the clock (24&#x0d hours) at camping house prem nagar colony satna.
Read moreof your Industry type