Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
For The Shevgaon Municipal Council, Under The General Road Grant 2026 Scheme, The Project Involves The Construction Of Roads Using Paving Blocks, Along With Road Filling And The Laying Of Crushed Stone Metalling, In Wards 7, 9, 5, And 10 Within T
|
| Description |
For The Shevgaon Municipal Council, Under The General Road Grant 2026 Scheme, The Project Involves The Construction Of Roads Using Paving Blocks, Along With Road Filling And The Laying Of Crushed Stone Metalling, In Wards 7, 9, 5, And 10 Within T
|
| Organisation | Directorate Of Municipal Administration | Municipal Administration, Ahmednagar | Municipal Council Shevgaon |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | 17700 |
| EMD | 47746 |
| Tender Value | 47.75 Lakh |
| Place | Maharashtra |
| Link | Login to view |
| Start Date | October 15, 2026 23:45 |
| End Date |
Open
22/10/2026
6 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Ofc 24 core armoured,ofc 12 core unarmoured,40mm hdpe pipe with rope,gi pipe 2 inch dia,0.6mm warning tape,coupler for hdpe conduit,cemented men hole chamber with cover,joint enclosure 24 core ofc,joint enclosure 12 core ofc,sc sc patch cord 03 mtr,lc sc patch cord,splitter,splitter,splitter,splitter,media converter,optical network unit,optical line terminal,route marker for ofc concrete rcc mile stone shape painted orange with letter afnet and cias ofc painted with red using black enamel,e pon sfp module,cias server rack,joint markers for ofc,splice ofc 24 core lc fdf,12 core fdf for sc connector fully loaded,road crossing cma culvert crossing with gi pipe,hdd digging,manual digging laying and installation and commissioning of 24 core ofc and 12 core ofc at a depth of 1.65 mtr using hdpe pipe with warning tape and back filling
Ofc 24 core armoured,ofc 12 core unarmoured,40mm hdpe pipe with rope,gi pipe 2 inch dia,0.6mm warning tape,coupler for hdpe conduit,cemented men hole chamber with cover,joint enclosure 24 core ofc,joint enclosure 12 core ofc,sc sc patch cord 03 mtr,lc sc patch cord,splitter,splitter,splitter,splitter,media converter,optical network unit,optical line terminal,route marker for ofc concrete rcc mile stone shape painted orange with letter afnet and cias ofc painted with red using black enamel,e pon sfp module,cias server rack,joint markers for ofc,splice ofc 24 core lc fdf,12 core fdf for sc connector fully loaded,road crossing cma culvert crossing with gi pipe,hdd digging,manual digging laying and installation and commissioning of 24 core ofc and 12 core ofc at a depth of 1.65 mtr using hdpe pipe with warning tape and back filling
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreA interlocking paving blocks with kerb stone,b interlocking paving blocks with kerb stone,c interlo
Read more
A interlocking paving blocks with kerb stone,b interlocking paving blocks with kerb stone,plb obliq
Read more
A interlocking paving blocks with kerb stone,b interlocking paving blocks with kerb stone,c interlo
Read more
A interlocking paving blocks with kerb stone,b interlocking paving blocks with kerb stone,c interlo
Read more
A interlocking paving blocks with kerb stone,b interlocking paving blocks with kerb stone,plb obliq
Read more
A interlocking paving blocks with kerb stone,b interlocking paving blocks with kerb stone,c interlo
Read more
of your Industry type