Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Mekkadu Devaswom In Ambalapuzha Group Filling Earth Inside Temple And Temple Compound Reg .
|
| Description |
Mekkadu Devaswom In Ambalapuzha Group Filling Earth Inside Temple And Temple Compound Reg .
|
| Organisation | Travancore Devaswom Board | State Govt. and UT |
| Tender Id | 2025_TDB_767348_1 |
|
Reference Number |
EEM/ET-35/2025-26 |
| Tender Fee | 1003 |
| EMD | 10400 |
| Tender Value | - |
| Place | OFFICE OF THE EXECUTIVE ENGINEER, TDB, MAVELIKKARA |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1251254 |
| Start Date | June 02, 2025 23:30 |
| End Date |
Expired
05/06/2025
Expired 495 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Kodungoor devaswom-mundakkayam group-reconstructing the collapsed retaining wall of temple tank
Kodungoor devaswom-mundakkayam group-reconstructing the collapsed retaining wall of temple tank
Read moreErumeli devaswom in mundakkayam group urgent rewiring to the aanakottil front and back nadapanthal mess hall and temple general electrical work
Erumeli devaswom in mundakkayam group urgent rewiring to the aanakottil front and back nadapanthal mess hall and temple general electrical work
Read moreWard no. 04, atal nagar earth filling and khadanja road construction from the east side of the existing interlocking road up to the amwa temple road.
Ward no. 04, atal nagar earth filling and khadanja road construction from the east side of the existing interlocking road up to the amwa temple road.
Read moreIn gosail talab ward in mrityunjaypuram colony from maurya ji house to shailendra tiwari house and from shankar ji temple to aditya keshari work of earth filling partial retaining wall and construction of c.c road.
In gosail talab ward in mrityunjaypuram colony from maurya ji house to shailendra tiwari house and from shankar ji temple to aditya keshari work of earth filling partial retaining wall and construction of c.c road.
Read moreIn daghar ward in surekhapurma colony from sanjay dubey house via pandey house via amresh add from kunal singh house to shankar ji temple work of earth filling retaining wall new drian cover and c.c
In daghar ward in surekhapurma colony from sanjay dubey house via pandey house via amresh add from kunal singh house to shankar ji temple work of earth filling retaining wall new drian cover and c.c
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreAmbalapuzha devaswom in ambalapuzha group - constructing toilet block reg.
Ambalapuzha devaswom in ambalapuzha group - constructing toilet block reg.&#x0d retender&#x0d
Read moreAmbalapuzha devaswom in ambalapuzha group - constructing toilet block reg.
Ambalapuzha devaswom in ambalapuzha group - constructing toilet block reg.
Read moreNavarackal devaswom in ambalapuzha group-constructing shashtipandal reg
Navarackal devaswom in ambalapuzha group-constructing shashtipandal reg
Read moreVandanam devaswom in ambalapuzha group constructing kanikkamandapam reg
Vandanam devaswom in ambalapuzha group constructing kanikkamandapam reg
Read moreof your Industry type