Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🔋 Procurement Opportunity: Light Weight Tube Handling System 🔧 The Department Of Atomic Energy, Under The Prime Minister's Office, Is Seeking Bids For The Supply Of A Light Weight Tube Handling System, Including All Mandatory Spares And Accessories As Detailed In The Annexure. 🗓️ Submission Deadline: April 15, 2024, 2:00 Pm Bidders Must Provide A Detailed Proposal That Meets The Technical Specifications And Compliance Requirements As Outlined In The Tender Documents. Keywords: Light Weight Tube Handling System, Department Of Atomic Energy, Pmo, Tender, Procurement, Bid Submission, Spares And Accessories| Particulars | Details |
|---|---|
| Title |
Light Weight Tube Handling System With Mandatory Spares & Accessories Etc. Details As Per Annexure.
|
| Description |
|
| Organisation | Department of Atomic Energy | PMO |
| Tender Id | GEM/2024/B/4740722 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | March 14, 2024 22:31 |
| End Date |
Expired
15/04/2024
Expired 909 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | EMD Status | MSE/MII Status | Status |
|---|---|---|---|---|---|---|
| 1 | JENDAMARK INDIA PRIVATE LIMITED | Make : NA Model : LIGHT WEIGHT TUBE HANDLING SYSTEM Title : LIGHT WEIGHT TUBE HANDLING SYSTEM | 12-04-2024 13:52:30 | Offline upload | MII | Qualified |
| 2 | NEXTECH SOLUTIONS AND SERVICES PRIVATE LIMITED | Make : NA Model : LIGHT WEIGHT TUBE HANDLING SYSTEM Title : LIGHT WEIGHT TUBE HANDLING SYSTEM | 12-04-2024 18:23:11 | Offline upload | MII | Qualified |
| 3 | REIDIUS ENGITECH PRIVATE LIMITED | Make : REIDIUS Model : LIGHT WEIGHT TUBE HANDLING SYSTEM Title : LIGHT WEIGHT TUBE HANDLING SYSTEM | 15-04-2024 11:26:18 | Registered with designated Agency / Authority | MII MSE | Disqualified |
Financial Evaluation Results
| S.No. | Seller Name | Offered Item | Total Price | Rank |
|---|---|---|---|---|
| 1 | JENDAMARK INDIA PRIVATE LIMITED | Item Categories : LIGHT WEIGHT TUBE HANDLING SYSTEM WITH Mandatory Spares & Accessories etc. DETAILS AS PER ANNEXURE. | 9303120.00 | L1 |
| 2 | NEXTECH SOLUTIONS AND SERVICES PRIVATE LIMITED | Item Categories : LIGHT WEIGHT TUBE HANDLING SYSTEM WITH Mandatory Spares & Accessories etc. DETAILS AS PER ANNEXURE. | 10455721.00 | L2 |
Supply of spares for helical gearbox for ball tube mills
Supply of spares for helical gearbox for ball tube mills
Read moreSpares for silo vent fan in dry ash handling plant ktps- v stage
Spares for silo vent fan in dry ash handling plant ktps- v stage
Read moreSpares suitable for tulaman make lorry weigh bridge of silos in ash handling system, ktps-vi stage
Spares suitable for tulaman make lorry weigh bridge of silos in ash handling system, ktps-vi stage
Read moreTggenco-ktps-vii stage-cam-enquiry for supply of vacuum pump spares(model:gxl 2000) in fly ash handling system
Tggenco-ktps-vii stage-cam-enquiry for supply of vacuum pump spares(model:gxl 2000) in fly ash handling system
Read moreSpares suitable for aira/marck make actuator operated 50nb ball valves for air lock vessels in ash handling system, ktps-vi stage
Spares suitable for aira/marck make actuator operated 50nb ball valves for air lock vessels in ash handling system, ktps-vi stage
Read moreSupply of two 2(two) nos sf-6 gas circuit breakers, 245kv,3150a,3-phase, 50hz individual pole operated by a motor-wound spring-spring operating control mechanism along with galvanized steel support structures including adapter plate, inter-pole cables, terminal connectors, all the accessories, mandatory spares including design, manufacturing, testing, inspection at manufacturer works, packing and forwarding along with supervision of erection, testing and commissioning of breakers at 220kv swit
Supply of two 2(two) nos sf-6 gas circuit breakers, 245kv,3150a,3-phase, 50hz individual pole operated by a motor-wound spring-spring operating control mechanism along with galvanized steel support structures including adapter plate, inter-pole cables, terminal connectors, all the accessories, mandatory spares including design, manufacturing, testing, inspection at manufacturer works, packing and forwarding along with supervision of erection, testing and commissioning of breakers at 220kv switchyard of nagarjunasagar main power house, telangana
Read moreProviding electrical wiring, flooring repairs, ceilling repairs, water facilities and taps in kitchen, white washing/ painting, tube lights, fans, doors, windows, mesh to windows etc., to tgwurjc (b) utnoor (v) of utnoor (m) of adilabad district ( reserved for sc community as per go 59, dt:21.05.2018)
Providing electrical wiring, flooring repairs, ceilling repairs, water facilities and taps in kitchen, white washing/ painting, tube lights, fans, doors, windows, mesh to windows etc., to tgwurjc (b) utnoor (v) of utnoor (m) of adilabad district ( reserved for sc community as per go 59, dt:21.05.2018)
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.
Read moreof your Industry type