Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Tanker Top Loading Arms
|
| Description |
|
| Organisation | NA | Ministry of Petroleum and Natural Gas |
| Tender Id | GEM/2024/B/5374949 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | September 28, 2024 21:36 |
| End Date |
Expired
19/10/2024
Expired 725 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Discharge wheel arms for rotary discharge machine
Discharge wheel arms for rotary discharge machine
Read moreSupply of 01 nos of desludging vehicle/ceespool tanker (tractorbased tanker-suction machine) in nagar panchayt hasanpura with fiveyear (05) operation and maintaince (o&m).
Supply of 01 nos of desludging vehicle/ceespool tanker (tractorbased tanker-suction machine) in nagar panchayt hasanpura with fiveyear (05) operation and maintaince (o&m).
Read moreFilter cartridge suitable for wam (torex) make bulk loading system of unit-10
Filter cartridge suitable for wam (torex) make bulk loading system of unit-10
Read moreRepair, testing and commencing of liquid storage carbon dioxide 30kl tanker at pvk5inc, kothagudem are
Repair, testing and commencing of liquid storage carbon dioxide 30kl tanker at pvk5inc, kothagudem are
Read moreAutomation integration of 8 bay bottom loading gantry and tlf pumps and associated instruments at bakania depot
Automation integration of 8 bay bottom loading gantry and tlf pumps and associated instruments at bakania depot
Read moreRoof top rain water harvesting work for type-3 houses in chitrakoot district
Roof top rain water harvesting work for type-3 houses in chitrakoot district
Read moreRepairs to the existing tanker operators room at moosapet ward under moosapet circle, kukatpally zone, o and m division xxii.
Repairs to the existing tanker operators room at moosapet ward under moosapet circle, kukatpally zone, o and m division xxii.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.
Read moreSupply and delivery of chassis mounted 2 nos water tanker (capacity:5000 liters) to merged villages under hnk areas in gwmc limits
Supply and delivery of chassis mounted 2 nos water tanker (capacity:5000 liters) to merged villages under hnk areas in gwmc limits
Read moreof your Industry type