Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Talav Sushobhikarn G.P Vagani Tarfe Vaje At Pali Village Tal Panvel Dist Raigad
|
Description |
Construction Of Talav Sushobhikarn G.P Vagani Tarfe Vaje At Pali Village Tal Panvel Dist Raigad
|
Organisation | Government of Maharashtra |
Tender Id | 2023_PWR_963806_1 |
Reference Number |
PD/AB/TC e-Ten Notice No. 96 for 2023-2024 |
Tender Fee | 590 |
EMD | 13000 |
Tender Value | |
Place | E.E. P.W. Division Panvel |
Link | https://mahatenders.gov.in |
Start Date | November 20, 2023 17:30 |
End Date |
25/11/2023 ( Expired 540 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of major bridge across godavari river at dusalgaon village at km. 75.660 design km. 29.040 and reconstruction of minor bridge across irrigation canal at ch. 57.665 design km 11.045 along parbhani gangakhed road nh 752k in the state of mh
Construction of major bridge across godavari river at dusalgaon village at km. 75.660 design km. 29.040 and reconstruction of minor bridge across irrigation canal at ch. 57.665 design km 11.045 along parbhani gangakhed road nh 752k in the state of mh
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreLining of w/c at outlet rd ...
Estimate for construction of w/c at outlet rd 2900/l direct barsola feeder in the land of dhan raj s/o gopala field to sadhu s/o ramchander field (14 acre) village baroda (under mplad scheme)
Read moreConstruction of 6 lane vup at km. 264.237 along with service road in village kherika on hisar - dabwali section of nh-09 in the state of haryana on epc mode
Construction of 6 lane vup at km. 264.237 along with service road in village kherika on hisar - dabwali section of nh-09 in the state of haryana on epc mode
Read moreConstruction of check dam across marudhaiyar river at varanavasi village in ariyalur taluk and district
Construction of check dam across marudhaiyar river at varanavasi village in ariyalur taluk and district
Read moreConstruction of fob at km.61.800 (village lalpur), at km.225.500 at km. 284.340 (village aram sarai), high mast at km. 61.680 and drain from km. 61.400 to km. 61.960 (bhs) on ghaziabad aligarh mainpuri section of nh-34 in the state of up on epc mode
Construction of fob at km.61.800 (village lalpur), at km.225.500 at km. 284.340 (village aram sarai), high mast at km. 61.680 and drain from km. 61.400 to km. 61.960 (bhs) on ghaziabad aligarh mainpuri section of nh-34 in the state of up on epc mode
Read moreProposed construction of 50 beded critical care hospital block and integrated public health laboratory at gmc sindhudurg tal kudal dist sindhudurg
Proposed construction of 50 beded critical care hospital block&#x0d and integrated public health laboratory at gmc sindhudurg &#x0d tal kudal dist sindhudurg&#x0d
Read moreConstruction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Read moreConstruction of nalla from sai complex to bhavani nagar to carry varhal devi talav over flow water at kamatghar w. no. 21, bncmc. mmrda fund
Construction of nalla from sai complex to bhavani nagar to carry varhal devi talav over flow water at kamatghar w. no. 21, bncmc. mmrda fund
Read moreof your Industry type