Tender Details

Particulars Details
Title
123/24 Pallimukku Poolamkundu Footpath Renovation
Description
123/24 Pallimukku Poolamkundu Footpath Renovation
Organisation Local Self Government Department | State Govt. and UT
Tender Id 2024_LSGD_638656_9
Reference
Number
-
Tender Fee 560
EMD 6340
Tender Value -
Place 123/24-Pallimukku Poolamkundu Footpath Renovation
Link
View Original Tender Notice

https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=972322

Start Date January 01, 2024 23:30
End Date
Expired 09/01/2024

Expired 1006 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Laying of cc road from plot no:71 to pbel city gate near peeram cheruvu pebl city road and central median and footpath from chevella r and b road to pebl city gate in ward no:123-hydershakote division, rajendranagar circle-l9, rajendranagar zone, ghmc.

Laying of cc road from plot no:71 to pbel city gate near peeram cheruvu pebl city road and central median and footpath from chevella r and b road to pebl city gate in ward no:123-hydershakote division, rajendranagar circle-l9, rajendranagar zone, ghmc.

Read more
Repair and maintenance of bathukamma kunta on eve of bathukamma festival in ward no.123 hydershakote in rajendranagar circle-19, ghmc (rs. 4.30 lakhs)(re call)

Repair and maintenance of bathukamma kunta on eve of bathukamma festival in ward no.123 hydershakote in rajendranagar circle-19, ghmc (rs. 4.30 lakhs)(re call)

Read more
Laying of footpath from plot no.303k to plot no.303e at road no.26, jubilee hills,ward-215,cir-36,kz,ghmc. (item.no 1)

Laying of footpath from plot no.303k to plot no.303e at road no.26, jubilee hills,ward-215,cir-36,kz,ghmc. (item.no 1)

Read more
Widening of main connectivity road with cc from bairagiguda water tank to h.no.22-l and its approach roads and laying of cc road from sai balaii nagar to thirumala hill colony in ward no.123 hydershakote division in rajendernagar circle-19, ghmc

Widening of main connectivity road with cc from bairagiguda water tank to h.no.22-l and its approach roads and laying of cc road from sai balaii nagar to thirumala hill colony in ward no.123 hydershakote division in rajendernagar circle-19, ghmc

Read more
Remodelling of footpath by rcc kerbing with ms railing and ss hand rail from puranapool to peela mandap temple on 100 feet road under jiyaguda-138, karwan circle-31, gz, ghmc.

Remodelling of footpath by rcc kerbing with ms railing and ss hand rail from puranapool to peela mandap temple on 100 feet road under jiyaguda-138, karwan circle-31, gz, ghmc.

Read more
Remodelling of footpath by rcc kerbing with ms railing and ss hand rail from peela mandap temple to hindu smashanavatika on 100 feet road under jiyaguda-138, karwan circle-31, gz, ghmc.

Remodelling of footpath by rcc kerbing with ms railing and ss hand rail from peela mandap temple to hindu smashanavatika on 100 feet road under jiyaguda-138, karwan circle-31, gz, ghmc.

Read more
Providing consultancy services for structural design and drawings duly approved/ vetted from iit/nit/diqc including for construction of 4x42.5 mtr c/c 172 mtr overall span, single lane motorable bridge with footpath at katera jagir

Providing consultancy services for structural design and drawings duly approved/ vetted from iit/nit/diqc including for construction of 4x42.5 mtr c/c 172 mtr overall span, single lane motorable bridge with footpath at katera jagir

Read more
Restoration of damaged cc road by laying new cc road proposed from h.no.13-3-506/38/123/1, 13-3-506/88/35/13, 13-3-506/38/18/a, 13-3-506/38/372/2, 13-3-506/38/367 and 13-3-506/38/230/a at keshava swamy nagar under ward no.138-jiyaguda (reserved for sts)

Restoration of damaged cc road by laying new cc road proposed from h.no.13-3-506/38/123/1, 13-3-506/88/35/13, 13-3-506/38/18/a, 13-3-506/38/372/2, 13-3-506/38/367 and 13-3-506/38/230/a at keshava swamy nagar under ward no.138-jiyaguda (reserved for sts)

Read more
(i)construction of road median from plot no.550m to ttd temple exit gate near bsnl quarters (ii) laying of cc road m30 grade infront of bsnl quarters (iii) laying of footpath from plot no.550m to ttd temple exit gate (iv) construction of compound wall to bsnl quarters at road no.92, jubilee hills, ward-222, film nagar, cir-36, jubilee hills, khairatabad zone, ghmc (item.no 3)

(i)construction of road median from plot no.550m to ttd temple exit gate near bsnl quarters (ii) laying of cc road m30 grade infront of bsnl quarters (iii) laying of footpath from plot no.550m to ttd temple exit gate (iv) construction of compound wall to bsnl quarters at road no.92, jubilee hills, ward-222, film nagar, cir-36, jubilee hills, khairatabad zone, ghmc (item.no 3)

Read more
P.no.123 thuttuvila kochupally footpath concrete ward 7

P.no.123 thuttuvila kochupally footpath concrete ward 7

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise