Tender Details

Particulars Details
Title
Providing And Laying Premix Carpet On Internal Road Of Township Complex At Nagwain Of Parbati H.E. Project (Stage Ii) (Package No C 811)
Description
Providing And Laying Premix Carpet On Internal Road Of Township Complex At Nagwain Of Parbati H.E. Project (Stage Ii) (Package No C 811)
Organisation NHPC Limited | Central Govt. Ministry/Department
Tender Id 2025_NHPC_856605_1
Reference
Number
NH/PP-II/PnC/Pkg. No. C-811/2025
Tender Fee 590
EMD 78000
Tender Value
Place Township Division, Nagwain,PHEP-II,H.P.
Link https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=900729
Start Date April 16, 2025 22:30
End Date

20/05/2025 ( Expired 15 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.

Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.

Read more
Lot ii package hydromechanical works for all gates and pressure shaft liners for the implementation of the 240 mw uri i stage ii h.e project, located near boniyar, uri villages in the baramulla district of ut of jammu and kashmir

Lot ii package hydro mechanical works for all gates and pressure shaft liners for the implementation of the 240 mw uri i stage ii h.e project, located near boniyar, uri villages in the baramulla district of ut of jammu and kashmir, india

Read more
Biennial rc for chemical supply and service on turnkey basis for cooling water treatment at cw systems of stage ii under chemical laboratory at ktps

Biennial rc for chemical supply and service on turnkey basis for cooling water treatment at cw systems of stage ii under chemical laboratory at ktps

Read more
Construction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode

Construction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode

Read more
Providing laying and jointing of 80 mm dia and 50 mm dia g.i. pipe line with labor and material at site ward no. 50 file no. 04/25x9/1

Providing laying and jointing of 80 mm dia and 50 mm dia g.i. pipe line with labor and material at site ward no. 50 file no. 04/25x9/1

Read more
Providing road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana

Providing road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana

Read more
Repair maint of internal electrification work at zone ii zone iii and zone vi and repair maint of ceiling exhaust fan other appliances and allied works at lekhapani under ge dinjan no 2

Repair maint of internal electrification work at zone ii zone iii and zone vi and repair maint of ceiling exhaust fan other appliances and allied works at lekhapani under ge dinjan no 2

Read more
Providing laying and jointing of 50 and 80 mm dia for replacement of damaged g.i. pipe line with labor and material at site ward no. 50 file no. 144/25x9/1

Providing laying and jointing of 50 and 80 mm dia for replacement of damaged g.i. pipe line with labor and material at site ward no. 50 file no. 144/25x9/1

Read more
Construction of c.c gali road and paver block gali road ed from a. h.o dipak ghur to h.o kalu dhanuk b. h.o joydeep dhanuk to h.o arabinda dhanuk c. h.o pabitra hazam to h.o sanjoy saha at bhalukya tila, under ward no.06, amc

Construction of c.c gali road and paver block gali road ed from a. h.o dipak ghur to h.o kalu dhanuk b. h.o joydeep dhanuk to h.o arabinda dhanuk c. h.o pabitra hazam to h.o sanjoy saha at bhalukya tila, under ward no.06, amc

Read more
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise