Tender Details
Particulars | Details |
---|---|
Title |
Providing And Laying Premix Carpet On Internal Road Of Township Complex At Nagwain Of Parbati H.E. Project (Stage Ii) (Package No C 811)
|
Description |
Providing And Laying Premix Carpet On Internal Road Of Township Complex At Nagwain Of Parbati H.E. Project (Stage Ii) (Package No C 811)
|
Organisation | NHPC Limited | Central Govt. Ministry/Department |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 590 |
EMD | 78000 |
Tender Value | |
Place | Township Division, Nagwain,PHEP-II,H.P. |
Link |
AAAAAAAAAA Login to view |
Start Date | April 16, 2025 22:30 |
End Date |
20/05/2025 ( 9 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Providing road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana
Providing road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana
Read moreChambal alwar bharatpur water supply project package 2 based on hybrid annuity model ace(p) bharatpur nit no. 05 / 2024-25
Work of construction of intermediate cwph at kotra baseri laying of clear water transmission main from kotra to naroli nadbai via junction 2 at naroli ips nadbai nagar ramgarh kishangarhbas tijara jairoli and bhiwadi based on ham model under jjm
Read moreDesljtc of 220kv d/c u/g 1200 sq. mm xlpe cable for upcoming 220 kv tss of northern railway (at tughlakabad) from 220 kv s/s btps and setc of 02 no. 220 kv feeders for nr with associated civil work at 220 kv s/s btps new delhi on turnkey basis.
Desljtc of 220kv d/c u/g 1200 sq. mm xlpe cable for upcoming 220 kv tss of northern railway (at tughlakabad) from 220 kv s/s btps and setc of 02 no. 220 kv feeders for nr with associated civil work at 220 kv s/s btps new delhi on turnkey basis.
Read moreLot i package civil works package for 240 mw uri i stage ii h.e project, located near boniyar, uri villages in the baramulla district of ut of jammu and kashmir
Lot i civil works comprising of hrt including adits, surge shaft including adits, pressure shaft including adits, underground p/h cavern, bus ducts, underground transformer cavern, underground dt gate operation cavern and others as per scope of work.
Read moreProviding and laying and compaction of wbm, sand blanketing, ilcb (m50 grade) and casting of edge block in between km 0.910 to km 12.00 on nelya- dhaula road for surfacing works under 42 brtf of project vartak in arunachal pradesh
Providing and laying and compaction of wbm, sand blanketing, ilcb (m50 grade) and casting of edge block in between km 0.910 to km 12.00 on nelya- dhaula road for surfacing works under 42 brtf of project vartak in arunachal pradesh
Read moreC/o infrastructure and other development work at rangmanch gad 15016 feet above msl upto 6 feet snow accumulation in winter and the site distance is 169 km from uttarkashi by road upto sumla and 20km on ops track upto rangmachgad post of 35th bn ukd
C/o infrastructure and other development work at rangmanch gad 15016 feet above msl upto 6 feet snow accumulation in winter and the site distance is 169 km from uttarkashi by road upto sumla and 20km on ops track upto rangmachgad post of 35th bn ukd
Read moreChambal alwar bharatpur water supply project package-iii based on hybrid annuity model (ham) ace(p) bharatpur nit no. 06/2024-25
Work of construction of cwr and block cwph at various locations for clusters laying of transfer main from block ps to block cps rising main from block cps to block esrs, construction of esrs laying of cluster distribution mains cabp pck 3 under jjm
Read moreWbphed/ee/md/niet_16 of 2025-2026, sl. no. 16
Construction of approach road, internal road, land development, control room, augmentation of boundary wall and allied works at head work site, construction of toilet block boundary wall, augmentation of pump house, land development, internal road
Read moreM and r of tiles flooring internal painting wood works in res no 17 by 5 at 17 clyed road officers hydel colony lucknow
M and r of tiles flooring internal painting wood works in res no 17 by 5 at 17 clyed road officers hydel colony lucknow
Read moreConstruction of 08 nos staff quarters type i quarter 04 units one block twin double storey and type ii quarter 04 units one block twin double storey at borakha phc west tripura district under nhm
Construction of 08 nos staff quarters type i quarter 04 units one block twin double storey and type ii quarter 04 units one block twin double storey at borakha phc west tripura district under nhm &#x0d sh providing internal electrification thereof&#x0d
Read moreof your Industry type