Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏭 Procurement Opportunity: Amrut 2.0 Swap 1 Water Infrastructure Project 🚧💧 The Kerala Water Authority, Under The State Government And Union Territories, Invites Bids For The Construction Of A New Water Treatment Plant (Wtp) With A Capacity Of 4 Million Liters Daily (Mld) At Olari, Including The Establishment Of A Pumping Station At Pullazhi And The Supply, Laying, And Testing Of A Raw Water Pumping Main From The Intake Well To The Wtp At Pullekunnu. This Is Under The Amrut 2.0 Swap 1 Initiative. 📅 Bid Submission Deadline: May 16, 2024, 3:00 Pm Tender Fee: Inr 5900 Emd: Inr 50000 Interested Bidders Must Possess The Necessary Qualifications And Experience In Similar Infrastructure Projects. Detailed Bids Should Encompass Design, Engineering, Material Specifications, Workmanship, And Adherence To Project Timelines. Keywords: Amrut 2.0, Water Treatment Plant, Infrastructure, Kerala Water Authority, Pipeline Work, Construction, Government Tender, Emd, Tender Fee| Particulars | Details |
|---|---|
| Title |
Amrut 2.0 Swap 1 Construction Of A New Wtp Of 4 Mld At Olari With Pumping Station At Pullazhi With Connected Works Package Iii Supply, Laying , Testing Of Raw Water Pumping Main From Intake Well To Wtp At Pullekunnu Pipeline Work
|
| Description |
Amrut 2.0 Swap 1 Construction Of A New Wtp Of 4 Mld At Olari With Pumping Station At Pullazhi With Connected Works Package Iii Supply, Laying , Testing Of Raw Water Pumping&Amp#X0d
Main From Intake Well To Wtp At Pullekunnu Pipeline Work&Amp#X0d
|
| Organisation | Kerala Water Authority | State Govt. and UT |
| Tender Id | 2024_KWA_644661_1 |
|
Reference Number |
RT-430/SE/PHC/TSR/2023-24 |
| Tender Fee | 5900 |
| EMD | 50000 |
| Tender Value | - |
| Place | Olari |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=986522 |
| Start Date | January 15, 2024 23:30 |
| End Date |
Expired
26/06/2024
Expired 841 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Canal water based water supply project for construction of 12.0 mld water treatment plant (wtp) and other related works including 5 years operation and maintenance at rampura phul, district bathinda, punjab under amrut 2.0 scheme
Canal water based water supply project for construction of 12.0 mld water treatment plant (wtp) and other related works including 5 years operation and maintenance at rampura phul, district bathinda, punjab under amrut 2.0 scheme
Read moreManjeera water supply scheme phase-i and phase-ii under government budgetary support to hmwssb for implementation of project in a period of two years - refurbishment and up gradation of manjeera water supply duly constructing of new 232 mld water treatment plant with intake well and pump house, laying new 1700mm dia ms pipeline from kalabgoor wtp to patancheru pump house under transmission division no.ii, patancheru
Manjeera water supply scheme phase-i and phase-ii under government budgetary support to hmwssb for implementation of project in a period of two years - refurbishment and up gradation of manjeera water supply duly constructing of new 232 mld water treatment plant with intake well and pump house, laying new 1700mm dia ms pipeline from kalabgoor wtp to patancheru pump house under transmission division no.ii, patancheru
Read moreAmrut-2.0- swap 1 - construction of a new wtp of 4 mld at olari with pumping station at pullazhi with connected works-package iii- supply, laying , testing of raw water pumping main from intake well to wtp at pullekunnu-pipeline work
Amrut-2.0- swap 1 - construction of a new wtp of 4 mld at olari with pumping station at pullazhi with connected works-package iii- supply, laying , testing of raw water pumping&#x0d main from intake well to wtp at pullekunnu-pipeline work&#x0d
Read moreAmrut-2.0- swap 1 - construction of a new wtp of 4 mld at olari with pumping station at pullazhi with connected works-package iii-supply, laying , testing of raw water pumping main from intake well to wtp at pullekunnu-pipeline work
Amrut-2.0- swap 1 - construction of a new wtp of 4 mld at olari with pumping station at pullazhi with connected works-package iii-supply, laying , testing of raw water pumping main from intake well to wtp at pullekunnu-pipeline work
Read moreAmrut-2.0- swap 1-construction of a new wtp of 4 mld at olari with pumping station at pullazhi with connected works-package ii-soil exploration test for wtp site at pullekunnu-investigation work
Amrut-2.0- swap 1-construction of a new wtp of 4 mld at olari with pumping station at pullazhi with connected works-package ii-soil exploration test for wtp site at pullekunnu-investigation work
Read moreAmrut-2.0-swap 1-construction of a new wtp of 4 mld at olari with pumping station at pullazhi with connected works-package i-soil exploration test for intake well site at north pullazhi-investigation work
Amrut-2.0- swap 1 - construction of a new wtp of 4 mld at olari with pumping station at pullazhi with connected works-package i - soil exploration test for intake well site at north pullazhi-investigation work
Read moreConstruction of intake well, wtp and laying of raw water rising main from intake well to wtp for jaleswar town under amrut 2.0 swap iii including o and m for 5 years
Construction of rcc intake well, pump house, water treatment plant, rcc approach road, transformer building, boundary wall, laying of di pumping main, pumping arrangements, external and internal electrification, plc automation system, etc.
Read moreSurveying, geo technical investigation, planning, designing, construction and commissioning of 6.54 mld capacity intake jetty , 5.72 mld wtp raw water rising main, etc on turnkey basis at dainhat municipality under amrut 2.0 scheme.
Surveying, geo technical investigation, planning, designing, construction and commissioning of 6.54 mld capacity intake jetty , 5.72 mld wtp raw water rising main, etc on turnkey basis at dainhat municipality under amrut 2.0 scheme.
Read moreInstallation of bulk flow meter and control valve zones under 4.5 mld wtp at koelnagar and 5.00 mld wtp at vedvyas in connection with 24x7 water supply to rourkela town under amrut 2.0 swap-ii
Installation of bulk flow meter and control valve zones under 4.5 mld wtp at koelnagar and 5.00 mld wtp at vedvyas in connection with 24x7 water supply to rourkela town under amrut 2.0 swap-ii
Read moreInstallation of bulk flow meter and control valve zones under 4.5 mld wtp at koelnagar and 5.00 mld wtp at vedvyas in connection with 24x7 water supply to rourkela town under amrut 2.0 swap-ii
Installation of bulk flow meter and control valve zones under 4.5 mld wtp at koelnagar and 5.00 mld wtp at vedvyas in connection with 24x7 water supply to rourkela town under amrut 2.0 swap-ii
Read moreof your Industry type