Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Supply, Installation, Testing And Commissioning Of Dry Type Transformers Along With Surge Arresters In Airport Line Of Delhi Metro Rail Corporation Ltd.
|
| Description |
Supply, Installation, Testing And Commissioning Of Dry Type Transformers Along With Surge Arresters In Airport Line Of Delhi Metro Rail Corporation Ltd.
|
| Organisation | Delhi Metro Rail Corporation Limited | Central Govt. Ministry/Department |
| Tender Id | 2025_DMRC_876423_1 |
|
Reference Number |
OEW-2040 |
| Tender Fee | 5900 |
| EMD | 1.19 Lakh |
| Tender Value | - |
| Place | New Delhi |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=921267 |
| Start Date | October 01, 2025 14:30 |
| End Date |
Expired
08/10/2025
Expired 369 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Tggenco - nshes - supply of three phase 11kv potential transformers, 9kv lightening arrestors and surge monitors suitable upto 220kv system at nshes, nagarjuna sagar.
Tggenco - nshes - supply of three phase 11kv potential transformers, 9kv lightening arrestors and surge monitors suitable upto 220kv system at nshes, nagarjuna sagar.
Read moreTggenco - nshes - design, manufacture, testing at manufacturers works, inspection, packing, supply, delivery of 3 no.s 220kv, 100-50/1a current transformers at nshes, nagarjunasagar.
Tggenco - nshes - design, manufacture, testing at manufacturers works, inspection, packing, supply, delivery of 3 no.s 220kv, 100-50/1a current transformers at nshes, nagarjunasagar.
Read moreTggenco-ytps(5x800mw)-switchyard transformer yard division-testing of transformer oil samples of various power transformers as and when required during the fy 2026-27
Tggenco-ytps(5x800mw)-switchyard transformer yard division-testing of transformer oil samples of various power transformers as and when required during the fy 2026-27
Read moreDesign, build, construct, install and commissioning of compost plant of 10 tpd for dry waste along with operation and maintenance of the plant for 5 year s
Design, build, construct, install and commissioning of compost plant of 10 tpd for dry waste along with operation and maintenance of the plant for 5 year s
Read moreDesign, build, construct, install, and commissioning of material recovery facility (mrf) of 05 tpd for dry waste along with operation and maintenance of the plant for 5 years.
Design, build, construct, install, and commissioning of material recovery facility (mrf) of 05 tpd for dry waste along with operation and maintenance of the plant for 5 years.
Read moreDesign, build, construct, install adn commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years.
Design, build, construct, install adn commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years.
Read moreDesign, build, construct, install and commissioning of material recovery facility (mr f) of 05 tpd for dry waste along with operation and maintenance of the plant for 5 year s
Design, build, construct, install and commissioning of material recovery facility (mr f) of 05 tpd for dry waste along with operation and maintenance of the plant for 5 year s
Read moreDesign, build, construct, install, and commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years on epc mode under nagar parishad khagaria
Design, build, construct, install, and commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years on epc mode under nagar parishad khagaria
Read moreShifting of 33kv/11kv/lt lines and 5x100kva distribution transformers due to obstructing the construction of road widening towards airport from collector camp office to aerodrome ground area in operation section adilabad town-3 of adilabad town sub-division in adilabad division of adilabad circle on partial turnkey basis
Shifting of 33kv/11kv/lt lines and 5x100kva distribution transformers due to obstructing the construction of road widening towards airport from collector camp office to aerodrome ground area in operation section adilabad town-3 of adilabad town sub-division in adilabad division of adilabad circle on partial turnkey basis
Read moreErection, testing and commissioning of 33/11 kv ss switchyard along with connected 33kv and 11kv lines at indrakal village in tadoor(m) of nagarkurnool division in nagarkurnool circle
Erection, testing and commissioning of 33/11 kv ss switchyard along with connected 33kv and 11kv lines at indrakal village in tadoor(m) of nagarkurnool division in nagarkurnool circle
Read moreof your Industry type