Tender Details

Particulars Details
Title
Supply, Installation, Testing And Commissioning Of Dry Type Transformers Along With Surge Arresters In Airport Line Of Delhi Metro Rail Corporation Ltd.
Description
Supply, Installation, Testing And Commissioning Of Dry Type Transformers Along With Surge Arresters In Airport Line Of Delhi Metro Rail Corporation Ltd.
Organisation Delhi Metro Rail Corporation Limited | Central Govt. Ministry/Department
Tender Id 2025_DMRC_876423_1
Reference
Number
OEW-2040
Tender Fee 5900
EMD 1.19 Lakh
Tender Value -
Place New Delhi
Link
View Original Tender Notice

https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=921267

Start Date October 01, 2025 14:30
End Date
Expired 08/10/2025

Expired 369 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Tggenco - nshes - supply of three phase 11kv potential transformers, 9kv lightening arrestors and surge monitors suitable upto 220kv system at nshes, nagarjuna sagar.

Tggenco - nshes - supply of three phase 11kv potential transformers, 9kv lightening arrestors and surge monitors suitable upto 220kv system at nshes, nagarjuna sagar.

Read more
Tggenco - nshes - design, manufacture, testing at manufacturers works, inspection, packing, supply, delivery of 3 no.s 220kv, 100-50/1a current transformers at nshes, nagarjunasagar.

Tggenco - nshes - design, manufacture, testing at manufacturers works, inspection, packing, supply, delivery of 3 no.s 220kv, 100-50/1a current transformers at nshes, nagarjunasagar.

Read more
Tggenco-ytps(5x800mw)-switchyard transformer yard division-testing of transformer oil samples of various power transformers as and when required during the fy 2026-27

Tggenco-ytps(5x800mw)-switchyard transformer yard division-testing of transformer oil samples of various power transformers as and when required during the fy 2026-27

Read more
Design, build, construct, install and commissioning of compost plant of 10 tpd for dry waste along with operation and maintenance of the plant for 5 year s

Design, build, construct, install and commissioning of compost plant of 10 tpd for dry waste along with operation and maintenance of the plant for 5 year s

Read more
Design, build, construct, install, and commissioning of material recovery facility (mrf) of 05 tpd for dry waste along with operation and maintenance of the plant for 5 years.

Design, build, construct, install, and commissioning of material recovery facility (mrf) of 05 tpd for dry waste along with operation and maintenance of the plant for 5 years.

Read more
Design, build, construct, install adn commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years.

Design, build, construct, install adn commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years.

Read more
Design, build, construct, install and commissioning of material recovery facility (mr f) of 05 tpd for dry waste along with operation and maintenance of the plant for 5 year s

Design, build, construct, install and commissioning of material recovery facility (mr f) of 05 tpd for dry waste along with operation and maintenance of the plant for 5 year s

Read more
Design, build, construct, install, and commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years on epc mode under nagar parishad khagaria

Design, build, construct, install, and commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years on epc mode under nagar parishad khagaria

Read more
Shifting of 33kv/11kv/lt lines and 5x100kva distribution transformers due to obstructing the construction of road widening towards airport from collector camp office to aerodrome ground area in operation section adilabad town-3 of adilabad town sub-division in adilabad division of adilabad circle on partial turnkey basis

Shifting of 33kv/11kv/lt lines and 5x100kva distribution transformers due to obstructing the construction of road widening towards airport from collector camp office to aerodrome ground area in operation section adilabad town-3 of adilabad town sub-division in adilabad division of adilabad circle on partial turnkey basis

Read more
Erection, testing and commissioning of 33/11 kv ss switchyard along with connected 33kv and 11kv lines at indrakal village in tadoor(m) of nagarkurnool division in nagarkurnool circle

Erection, testing and commissioning of 33/11 kv ss switchyard along with connected 33kv and 11kv lines at indrakal village in tadoor(m) of nagarkurnool division in nagarkurnool circle

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise