Tender Details

Particulars Details
Title
Widening Of Samon Bagalkhedi Road. Pac 741.57 Lacs First Call On Road And Bridge Sor 25 03 22 Work Period 365 Days I/C Rainy Season
Description
Widening Of Samon Bagalkhedi Road. Pac 741.57 Lacs First Call On Road And Bridge Sor 25 03 22 Work Period 365 Days I/C Rainy Season
Organisation PWD- Roads and Bridges | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 21534
EMD 7.42 Lakh
Tender Value
Place Narmadapuram
Link

AAAAAAAAAA

Login to view
Start Date April 10, 2025 00:25
End Date

29/04/2025 ( 8 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.

Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.

Read more
Construction of road junction minor bridge culvert in forest stretches length 7.1 km and balance mjb work on nal river on nandgaonpeth morshi warud mh mp border road section nh 353 k dist amravati on epc mode in the state of maharashtra

Construction of road junction minor bridge culvert in forest stretches length 7.1 km and balance mjb work on nal river on nandgaonpeth morshi warud mh mp border road section nh 353 k dist amravati on epc mode in the state of maharashtra

Read more
Wbpwd/pw(r)/se/shc/nit no 02 of 2025-2026(2nd-call)

Herobhanga vidyasagar vidyamandir to jharkhali ferry ghat road, from 0.00 kmp to 3.80 kmp, widening and strengthening work under south 24-parganas highway division, p.w (roads) directorate in the district of south 24-parganas.

Read more

Ghospara road from 2.00 km to 9.00 km and 17.50 km to 21.00 km- strengthening work under barrackpore division, p.w.d. in the district of north 24 parganas. during the year 2024-25..2nd call

Read more
Improvements and widening of the road mrl09-padappai kavanur road via orathur km 0/0 - 4/020 at kundrathur panchayat union in kanchipuram district under pmgsy iii - batch i - 2024-25. pkg.no.tn01-154

Improvements and widening of the road mrl09-padappai kavanur road via orathur km 0/0 - 4/020 at kundrathur panchayat union in kanchipuram district under pmgsy iii - batch i - 2024-25. pkg.no.tn01-154

Read more
Work of hammering and poking of coal bunker in all three shift during rainy season in unit 1,2,3 and 4 of ph-i n ph-ii at sstpp, mppgcl, dongalia, dist. khandwa

Work of hammering and poking of coal bunker in all three shift during rainy season in unit 1,2,3 and 4 of ph-i n ph-ii at sstpp, mppgcl, dongalia, dist. khandwa

Read more

Barrackpur-barasat (sh-1) road from 0.406 km to 1.991 km, widening works including rcc box drain under barrackpur division in the district of north 24 parganas.. 2nd call

Read more
Pls and c of 75 mm each in two layer wmm 75 mm dbm and 40 mm bc incl cleaning of rd surf and applying pc and tc and road marking wks for surf works bet km 0 pt 000 to km 22 pt 500 on smd rd under 108 rcc 759 brtf rd sector of project deepak in hp

Pls and c of 75 mm each in two layer wmm 75 mm dbm and 40 mm bc incl cleaning of rd surf and applying pc and tc and road marking wks for surf works bet km 0 pt 000 to km 22 pt 500 on smd rd under 108 rcc 759 brtf rd sector of project deepak in hp

Read more
Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode

Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode

Read more
Strengthening of bareli chainpur gaganwada road length 9.00 km pac 1516.12 lacs first call on road and bridge sor 25-03-22 work period 540 days i/c rainy season

Strengthening of bareli chainpur gaganwada road length 9.00 km pac 1516.12 lacs first call on road and bridge sor 25-03-22 work period 540 days i/c rainy season

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise