Tender Details
Particulars | Details |
---|---|
Title |
Widening Of Samon Bagalkhedi Road. Pac 741.57 Lacs First Call On Road And Bridge Sor 25 03 22 Work Period 365 Days I/C Rainy Season
|
Description |
Widening Of Samon Bagalkhedi Road. Pac 741.57 Lacs First Call On Road And Bridge Sor 25 03 22 Work Period 365 Days I/C Rainy Season
|
Organisation | PWD- Roads and Bridges | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 21534 |
EMD | 7.42 Lakh |
Tender Value | |
Place | Narmadapuram |
Link |
AAAAAAAAAA Login to view |
Start Date | April 10, 2025 00:25 |
End Date |
29/04/2025 ( 8 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Read moreConstruction of road junction minor bridge culvert in forest stretches length 7.1 km and balance mjb work on nal river on nandgaonpeth morshi warud mh mp border road section nh 353 k dist amravati on epc mode in the state of maharashtra
Construction of road junction minor bridge culvert in forest stretches length 7.1 km and balance mjb work on nal river on nandgaonpeth morshi warud mh mp border road section nh 353 k dist amravati on epc mode in the state of maharashtra
Read moreWbpwd/pw(r)/se/shc/nit no 02 of 2025-2026(2nd-call)
Herobhanga vidyasagar vidyamandir to jharkhali ferry ghat road, from 0.00 kmp to 3.80 kmp, widening and strengthening work under south 24-parganas highway division, p.w (roads) directorate in the district of south 24-parganas.
Read moreAAAAAAAAAA
Login to viewGhospara road from 2.00 km to 9.00 km and 17.50 km to 21.00 km- strengthening work under barrackpore division, p.w.d. in the district of north 24 parganas. during the year 2024-25..2nd call
Read moreImprovements and widening of the road mrl09-padappai kavanur road via orathur km 0/0 - 4/020 at kundrathur panchayat union in kanchipuram district under pmgsy iii - batch i - 2024-25. pkg.no.tn01-154
Improvements and widening of the road mrl09-padappai kavanur road via orathur km 0/0 - 4/020 at kundrathur panchayat union in kanchipuram district under pmgsy iii - batch i - 2024-25. pkg.no.tn01-154
Read moreWork of hammering and poking of coal bunker in all three shift during rainy season in unit 1,2,3 and 4 of ph-i n ph-ii at sstpp, mppgcl, dongalia, dist. khandwa
Work of hammering and poking of coal bunker in all three shift during rainy season in unit 1,2,3 and 4 of ph-i n ph-ii at sstpp, mppgcl, dongalia, dist. khandwa
Read moreAAAAAAAAAA
Login to viewBarrackpur-barasat (sh-1) road from 0.406 km to 1.991 km, widening works including rcc box drain under barrackpur division in the district of north 24 parganas.. 2nd call
Read morePls and c of 75 mm each in two layer wmm 75 mm dbm and 40 mm bc incl cleaning of rd surf and applying pc and tc and road marking wks for surf works bet km 0 pt 000 to km 22 pt 500 on smd rd under 108 rcc 759 brtf rd sector of project deepak in hp
Pls and c of 75 mm each in two layer wmm 75 mm dbm and 40 mm bc incl cleaning of rd surf and applying pc and tc and road marking wks for surf works bet km 0 pt 000 to km 22 pt 500 on smd rd under 108 rcc 759 brtf rd sector of project deepak in hp
Read moreRehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Read moreStrengthening of bareli chainpur gaganwada road length 9.00 km pac 1516.12 lacs first call on road and bridge sor 25-03-22 work period 540 days i/c rainy season
Strengthening of bareli chainpur gaganwada road length 9.00 km pac 1516.12 lacs first call on road and bridge sor 25-03-22 work period 540 days i/c rainy season
Read moreof your Industry type