Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
1 Base Preparation And Construction Of Cemented Base Including Labour Charges Dot Playing Area 18mt
|
Description |
|
Organisation | Department of Military Affairs | Ministry of Defence |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link |
AAAAAAAAAA Login to view |
Start Date | July 05, 2025 01:16 |
End Date |
25/07/2025 ( 20 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Consultancy services for preparation of dpr for i. widening to 2l ps of balance reaches km 184.840 to km 190.00 and km 194.840 to 198.800, ii. construction of additional vent to existing major bridge at km 210.0 to 2 of nizamabad to jagdalpur nh 63
Consultancy services for preparation of dpr for i. widening to 2l ps of balance reaches km 184.840 to km 190.00 and km 194.840 to 198.800, ii. construction of additional vent to existing major bridge at km 210.0 to 2 of nizamabad to jagdalpur nh 63
Read moreConsultancy services for preparation of dpr for 4 l of rudrampur to bhadrachalam section from km 71.0 to 171.6 of vijayawada to jagadalpur section of nh 30 and construction of kothagudem bypass connecting nh 930p and nh 30 in the state of telangana
Consultancy services for preparation of dpr for 4 l of rudrampur to bhadrachalam section from km 71.0 to 171.6 of vijayawada to jagadalpur section of nh 30 and construction of kothagudem bypass connecting nh 930p and nh 30 in the state of telangana
Read moreConsultancy services for preparation of detailed project report (dpr) for construction of 4 lane elevated corridor from natesan nagar rob (km 38.220 of nh-45a) to ariyankuppam bridge (km 40.780 of nh-45a) and widening of existing road to 4 lane road
Consultancy services for preparation of detailed project report (dpr) for construction of 4 lane elevated corridor from natesan nagar rob (km 38.220 of nh-45a) to ariyankuppam bridge (km 40.780 of nh-45a) and widening of existing road to 4 lane road
Read moreConsultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap
Consultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap
Read more1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
Read moreProviding laying and jointing of trunk main lines along with manholes part 1 for sewerage work in bambala area sanganer under ee phe i jda jaipur
Providing laying and jointing of trunk main lines along with manholes part 1 for sewerage work in bambala area sanganer under ee phe i jda jaipur
Read moreConstruction of opd and emergency critical area block at district hospital sekmai
Construction of opd and emergency critical area block at district hospital sekmai
Read moreDesign, construction, supply, installation and commissioning of package type sewerage treatment plant (based on mbr technology) within power plant area of chandrapura thermal power station on epc basis
Design, construction, supply, installation and commissioning of package type sewerage treatment plant (based on mbr technology) within power plant area of chandrapura thermal power station on epc basis
Read moreConstruction of punjab roadways workshop of depot 1 and 2 at amritsar
Construction of punjab roadways workshop of depot 1 and 2 at amritsar
Read moreConstruction of 1 no bay and its allied civil works for 66 kv s s jalal at 66 kv s s bhagta bhai ka under op. circle, bathinda
Construction of 1 no bay and its allied civil works for 66 kv s s jalal at 66 kv s s bhagta bhai ka under op. circle, bathinda
Read moreof your Industry type