Tender Details
Particulars | Details |
---|---|
Title |
Repairing And Rewinding Of 315 Kva Power Transformer 11 Kv/440 V Make Crompton Greaves, Sl No Gop 02 For Patch B Gopalichak Colliery.
|
Description |
Repairing And Rewinding Of 315 Kva Power Transformer 11 Kv/440 V Make Crompton Greaves, Sl No Gop 02 For Patch B Gopalichak Colliery.
|
Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
Tender Id | 2025_BCCL_329740_1 |
Reference Number |
BCCL/PBA/AM(EnM)/2024-25/102 dated-03.03.2025 |
Tender Fee | 0 |
EMD | 3100 |
Tender Value | |
Place | GOPALICHAK COLLIERY |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=341918 |
Start Date | March 03, 2025 23:30 |
End Date |
13/03/2025 ( Expired 39 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Sitc of new control cum protection panel for hv side of 66 by 11kv 2mva transformers no. 01 and 02 along with dismantling of existing old panel at matatila hydro power plant distt lalitpur
Sitc of new control cum protection panel for hv side of 66 by 11kv 2mva transformers no. 01 and 02 along with dismantling of existing old panel at matatila hydro power plant distt lalitpur
Read moreComplete rewinding, overhauling and repairing of 750 kva, 500 kva and 200 kva 11kv/3.3kv power transformer, 3 phase, 50 hz, vector group-dyn11, at clear water pumping plant jamadoba and different transformers at dfifferent locations under jmada dhan
Complete rewinding, overhauling and repairing of 750 kva, 500 kva and 200 kva 11kv/3.3kv power transformer, 3 phase, 50 hz, vector group-dyn11, clear water pumping plant, jamadoba and different transformers at dfifferent locations under jmada dhan
Read moreRepairing / testing and transportation of the failed cummins make engine (esn 33182273), model-qsk-60 of beml make dumper sl. no. 99006 , model-bh205e from hhp rebuilt centre, pune to nigahi project, ncl
Repairing / testing and transportation of the failed cummins make engine (esn 33182273), model-qsk-60 of beml make dumper sl. no. 99006 , model-bh205e from hhp rebuilt centre, pune to nigahi project, ncl
Read moreCreation of 100 kva substns for new tubewell at durganagar babakailakhnath kbnagar bantalab 200kva substn for new tubewell at cps muthicomplex including laying of reqd 11kv taplines and ltnetwork for dispersal of power phe under pheworks in janipur
Creation of 100 kva substns for new tubewell at durganagar babakailakhnath kbnagar bantalab 200kva substn for new tubewell at cps muthicomplex including laying of reqd 11kv taplines and ltnetwork for dispersal of power phe under pheworks in janipur
Read more(a). repairing of 3.3kv, 630a, vcb, ctr 600/300/5a, make-pce, sl.no.-05/hmv/132 installed at main sub-station of gvp phase-ii ocp, (b). repairing of 3.3kv vcb, make-pce, 630a, sl.no.-05/hmv/131 of secondary switch at 3mva, 11kv/3.3kv transformer of g
(a). repairing of 3.3kv, 630a, vcb, ctr 600/300/5a, make-pce, sl.no.-05/hmv/132 installed at main sub-station of gvp phase-ii ocp, (b). repairing of 3.3kv vcb, make-pce, 630a, sl.no.-05/hmv/131 of secondary switch at 3mva, 11kv/3.3kv transformer of g
Read moreR/e of lt line s/f of led street light and cabling work s/f of 150 ltr capacity 02 no water cooler 4 kva steblizer water cooler cage construction of tubewell s/f of 01hp submersible pump for water cooler 2 nos and cabling work at nmy mirzapur
R/e of lt line s/f of led street light and cabling work s/f of 150 ltr capacity 02 no water cooler 4 kva steblizer water cooler cage construction of tubewell s/f of 01hp submersible pump for water cooler 2 nos and cabling work at nmy mirzapur
Read moreRepairing of 01 no greaves make u-1000 gearbox and 01 no greaves make u-1200 gearbox at jamuna 9 10 mine of bhadra sub area, jk area
Repairing of 01 no greaves make u-1000 gearbox and 01 no greaves make u-1200 gearbox at jamuna 9 10 mine of bhadra sub area, jk area
Read moreRepairing of plateform of digtal make 50te capacity, electronic road w/b installed at zero point and check post for monsoon preparation 2025 of gvp phase-ii ocp.
Repairing of plateform of digtal make 50te capacity, electronic road w/b installed at zero point and check post for monsoon preparation 2025 of gvp phase-ii ocp.
Read moreRepairing/overhauling of 03 nos. of pumps(02 nos. of flowmore make pump, model no fm 590 bd 250x200,3 stage (duty parameters 120lpsx250 mtrs) pump and 01 nos. of fm 590 bd 250x200,3 stage (duty parameters 180lpsx250 mtrs) ) as per the direction
Repairing/overhauling of 03 nos. of pumps(02 nos. of flowmore make pump, model no fm 590 bd 250x200,3 stage (duty parameters 120lpsx250 mtrs) pump and 01 nos. of fm 590 bd 250x200,3 stage (duty parameters 180lpsx250 mtrs) ) as per the direction
Read moreRepairing and rewinding of 03 nos. h.t. induction motors, i) rating 223 kw, 3.3 kv, make ngef, ii) rating 375 kw, 3.3 kv, make crompton greaves and iii) rating 1130 kw, 6.6 kv, make cg power of pump section at dipka expansion project.
Repairing and rewinding of 03 nos. h.t. induction motors, i) rating 223 kw, 3.3 kv, make ngef, ii) rating 375 kw, 3.3 kv, make crompton greaves and iii) rating 1130 kw, 6.6 kv, make cg power of pump section at dipka expansion project.
Read moreof your Industry type