Tender Details

Particulars Details
Title
Engagement Of User Fee Collection Agency On The Basis Of Cb Through E Tender For Parwa Fp At Km 236.455 For The Use Of 2 Lane With Paved Shoulder Of Nokha To Bikaner Section From Km 215.130 To Km 269.260 Of Nh 89 ( New Nh 62 ) In Rajasthan
Description
Engagement Of User Fee Collection Agency On The Basis Of Cb Through E Tender For Parwa Fp At Km 236.455 For The Use Of 2 Lane With Paved Shoulder Of Nokha To Bikaner Section From Km 215.130 To Km 269.260 Of Nh 89 ( New Nh 62 ) In Rajasthan
Organisation Central Public Procurement Portal 2
Tender Id 2023_NHAI_170216_1
Reference
Number
NHAI/13013/547/CO/23-24 /CB/Parwa FP/E215176
Tender Fee 0
EMD 0
Tender Value
Place NHAI HQ
Link https://etenders.gov.in
Start Date October 09, 2023 23:30
End Date

23/10/2023 ( Expired 574 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Read more
Rehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km

Rehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km

Read more
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Read more
Construction of nh353 j stretch from chandur bazarnaka to junctionwith nh 548 c (jasi rani chowk) in paratwada achalpur city to four lane with paved shoulder configuration on epc basis in the state of maharashtra length 6.19 km).

Construction of nh353 j stretch from chandur bazarnaka to junctionwith nh 548 c (jasi rani chowk) in paratwada achalpur city to four lane with paved shoulder configuration on epc basis in the state of maharashtra length 6.19 km).

Read more
Upgradation of existing nh-115 from 2-lane configuration to 2-lane with paved shoulder from km 44.369 to km 54.806 (l 10.437 km) in tinsukia district under dibrugarh nh division in the state of assam under epc mode (job no. 115/as/2024-25/283)

Upgradation of existing nh-115 from 2-lane configuration to 2-lane with paved shoulder from km 44.369 to km 54.806 (l 10.437 km) in tinsukia district under dibrugarh nh division in the state of assam under epc mode (job no. 115/as/2024-25/283)

Read more
Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)

Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)

Read more
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.

Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.

Read more
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham

Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham

Read more
Upgradation to two lane with paved shoulder from design ch km 118.813 to 148.810 and km 155.0 to 165.082 bagasara to thangalol section of nh351 in the state of gujarat package iv on epc mode

Upgradation to two lane with paved shoulder from design ch km 118.813 to 148.810 and km 155.0 to 165.082 bagasara to thangalol section of nh351 in the state of gujarat package iv on epc mode

Read more
Construction of 4-lane with paved shoulder of ferozepur bypass from existing km/design km. 212.500 to existing km 229.690 (design chainage km 231.270) section of nh-354 on epc mode in the state of punjab

Construction of 4-lane with paved shoulder of ferozepur bypass from existing km/design km. 212.500 to existing km 229.690 (design chainage km 231.270) section of nh-354 on epc mode in the state of punjab

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise